BIM FOR ALL STAGES OF THE PROJECT LIFECYCLE Krzysztof Nowosiński –BIM Champion

Transcript of Mott MacDonald

Page 1: Mott MacDonald

BIM FOR ALL STAGES OF THE PROJECT LIFECYCLEKrzysztof Nowosiński –BIM Champion

Page 2: Mott MacDonald

VSU PROJECT

BEST DEPLOYMENT OF BIM ON A PROJECT, 2012

AWARD WINNING BIM PROJECTS

CASEMENT PARK STADIUM

2013 BIM PROJECT OF THE YEAR

2014 FIATECH CETI AUTOMATED DESIGN AWARD

2014 BIM INITIATIVE OF THE YEAR

“The real clincher was the development of a 5D BIM process with an object based naming convention as a blueprint for future projects – both delivering and learning on the job!

Judging panel comments

Page 3: Mott MacDonald

To champion lean solutions, including BIM and off-site construction, to minimise carbon emissions, resource use and waste on all our projects

OUR COMMITMENT TO DfMA

Page 4: Mott MacDonald

Design

Construction

Design for manufacture and assembly

Planning

Asset management

Planning

Page 5: Mott MacDonald

Planning

New design coordinated with existing asset

VICTORIA STATION UPGRADE (VSU)

Page 6: Mott MacDonald

Planning

Constraints referenced directly into model

VSU – PROJECT CONSTRAINTS

Page 7: Mott MacDonald

Planning

Stakeholder assets modelled

VSU – DESIGN DEVELOPMENT

Page 8: Mott MacDonald

Planning

Geological surfaces imported from Surfer

VSU – ENGINEERING ANALYSIS INTEGRATION

Page 9: Mott MacDonald

Planning

SUCCESS STORIES – VSU

SUCCESSFULOUTCOMES

Page 10: Mott MacDonald

Design

Construction

Design for manufacture and assembly

Planning

Asset management

Design

Planning

Page 11: Mott MacDonald

Design

SUCCESS STORIES – WATER TREATMENT, USA

20%Cut on design time

Page 12: Mott MacDonald

Design

SUCCESS STORIES – ADELAIDE OVAL

30%Time saving on architectural design

Page 13: Mott MacDonald

SUCCESS STORIES - CASEMENT PARK

52%Time saving on Tender design

Page 14: Mott MacDonald

CASEMENT PARK

CLIENT – GAA

£76.4MASPIRATIONAL BRIEF

Page 15: Mott MacDonald

CENTRAL BIM

4D PROGRAMME 6D ASSETMANAGEMENT

5D COST PLANCLASH DETECTION

BUILDING SERVICESMODEL

ENGINEERINGANALYSIS

THERMAL,BREEAM

FIRE

LIGHTING DESIGN

ENGINEERINGDESIGN

CIVIL INFRASTRUCTURE

CUT & FILLMODELS

DRAINAGE TRAFFICMODELS

WASTESTUDIES

DELIVERY &LOADINGACCESS

STRUCTURALMODEL

WINDANALYSIS

BOWLDESIGN

ROOFDESIGN

BUILDSEQUENCE

CONCEPTUALSTUDIES

DAYLIGHTSTUDIES

SIGHT LINES

VISUALISATION

ARCHITECTURALMODEL

PEOPLEFLOW

3D FLY-THROUGH

‘RIGHT TOLIGHT’

Page 16: Mott MacDonald

Generative model with input parameters

Revit model exported into CSC Fastrak

Exported to Robot for dynamics calculation

Models exported to Robot

Optimised for minimum steel weight avoiding value engineering

Linked via Geometry Gym and IFC link

Page 17: Mott MacDonald

Intelligent properties added to rooms and spaces

3D modelling of plant areas and main distribution routes

Energy modelling

Truss feature lighting

Sports lighting analysis

Page 18: Mott MacDonald

BIM used for elemental quantification

Clash detection between disciplines

4D construction studies

Multidisciplinary reviews

Page 19: Mott MacDonald

5D PROCESS IMPROVEMENTS

Benefits- Consistent approach to naming conventions- Quantification accuracy within 1%- Real time cost reports- Delivery of better value buildings for our clients5D Publishing Guide now being used on multiple projects

80%Time saving to prepare cost plan

Page 20: Mott MacDonald

Design

Construction

Design for manufacture and assembly

Planning

Asset management

Construction

Design

Page 21: Mott MacDonald

Construction Phase

Page 22: Mott MacDonald

Construction Phase

JET GROUT PILING

Page 23: Mott MacDonald

Construction Phase

JET GROUT PLANT SELECTION

Plant modelled and maneuverability checks performed

Page 24: Mott MacDonald

Construction Phase

NEW APPLICATIONS: GROUND TREATMENT

Auto report extraction from model listing unique reference coordinates

Page 25: Mott MacDonald

Construction Phase

Water Level

Drill Rods left in-situ

Level of assumed clay

Revised level of clay from recent boreholesKnown gap between jet grout

columns

REDUCING RISK USING BIM

Extracts from 3d models used in daily site review meetings

Page 26: Mott MacDonald

Design

Construction

Design for manufacture and assembly

Planning

Asset management

Design for manufacture and assembly

Construction

Page 27: Mott MacDonald

Design for manufacture and assembly

ANGLIAN WATER PRODUCT BASED DELIVERY

BIM hugely facilitates offsite manufacture

Page 28: Mott MacDonald

Design for manufacture and assembly

ANGLIAN WATER PRODUCT BASED DELIVERY

20% Less Carbon

90% Time saving

Page 29: Mott MacDonald

Design for manufacture and assembly

MinimumAsset

Standard

3D Model

Drawings

Integration Guide

Health & Safety Risk Assessment

Calculations

Specification

Procurement Guide

FrameworkAgreement

BOMCost data

Acceptance Criteria

InstallationGuide

Commissioning Data

Functional Design Spec

Software Block

Maintenance Schedule

Spares Schedule

O&Mdata

SAP ALMdata

JoECarbon

Footprint

Telemetry Standards

Asset MonitoringFrameworks (IRIS)

STANDARDPRODUCTS

Page 30: Mott MacDonald

Design for manufacture and assembly

HINKLEY C ONSITE CAMPUS

Page 31: Mott MacDonald

Design

Construction

Design for manufacture and assembly

Planning

Asset managementAsset management

Design for manufacture and assembly

Page 32: Mott MacDonald

Asset management

ASSET INFORMATION

Asset data GIS dataData

Users

Performance data

Delivery partners Operators Asset Managers

Survey data

Page 33: Mott MacDonald

Asset management

ASSET INFORMATION

Delivery partners Operators Asset Managers

Mega databaseData

Users

Page 34: Mott MacDonald

Asset management

INTEGRATED ASSET INFORMATION

Asset data GIS data

Middleware

Data

Users

Performance data

Delivery partners Operators Asset Managers

Survey data

Page 35: Mott MacDonald

Asset management

As-Built Owner Model

As-Maintained Owner Model

Changes in Maximoupdated inOwner Model

Navisworks for visualization

Links between geometry and data

Empty Maximo Database

Populated Maximo Database

Publish key Revit Data for O&M

EMERGING ASSET MANAGEMENT

Page 36: Mott MacDonald