Post on 29-Jun-2018
KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10
December 14, 2017 Page 1 of 4 T 519.576.2150 F 519.576.5499
This Addendum amends and forms part of the Bidding and Contract Documents for the above Project as follows:
CLARIFICATIONS
Q1. Is it possible to set up a secondary walkthrough for the subcontractors?
A1. Per subcontractors’ requests, KidsAbility Guelph will be open at 10:00 am on Monday, December 18th for a secondary walkthrough.
Q2. Please clarify note 17, remove and store furniture. Where do we store and provide list of furniture with quantity, and return requirements? In place set up etc?
A2. KidsAbility will remove ALL furniture (modular, desks, chairs, shelving, and wall mounted white boards/tack boards) in space prior to construction commencement.
Q3. Provide location for dust control and hoarding note 12 on drawing A1-1.
A3. Hoarding is to be provided above ceiling at existing partition wall between two units (refer to specifications section 01 50 00 Temporary Facilities and Controls article 1.3 Temporary Barriers and Enclosures) .
Q4. Provide detail on PLAM counters and exterior of cabinets.
A4. PLAM counters to be priced based on Formica Laminate, matte finish. Refer to addition to 06 40 00 below for cabinets.
Q5. Provide detail on barn board feature wall and at reception desk.
A5. Barn board to be grey washed. Contact Barn Board Store in Hamilton at 647-667-2102.
Q6. New asphalt patch at entry will be difficult to complete in early spring.
A6. Refer to drawing A2-1. Note regarding asphalt patch to remain. Asphalt patch can be completed when asphalt plant is open.
Q7. Parking lot signage.
A7. Any additional parking lot signage required to be covered under signage allowance.
CHANGES TO SPECIFICATIONS
FRONT END
Section 00 43 33.26 ADD2 Approved Manufacturers List - Electrical
1. Replace with the attached up-to-date proposed products form.
Section 00 01 13 List of Standard Details
1. Refer to 8000-1 Door and Screen Schedule - WSC doors, finish to be PNT.
KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10
December 14, 2017 Page 2 of 4 T 519.576.2150 F 519.576.5499
Section 00 21 13 Instructions to Bidders
1. Clarification : Refer to 1.12.7 Undertaking of Insurance is required.
ARCHITECTURAL
Section 06 40 00 Architectural Woodwork
1. Add 2.1.8 to read: “Premanufactured cabinets to be melamine, ready to assemble, sizes as shown on drawings, in solid colours. Colour to be selected by Consultant.”
Section 08 80 00 Glazing
1. Revise 2.4.2.(3) to read: “Insulated back pan complete with galvanized metal and mineral woolinsulation. For areas where back pan is exposed to interior, back pan to be covered with interior drywallfinish flush with adjacent.
Section 09 65 00 Resilient Flooring
1. Add article 2.1.4.2 as follows:
.2 Allow 20% accent colours in treatment rooms and hallways.
Section 10 20 00 Interior Specialties
1. Remove article 1.2.2 Corner Guards.
2. Remove article 2.3 Corner Guards.
CHANGES TO DRAWINGS
ARCHITECTURAL
Drawing A2-1
1. Drawing A2-1: front edge of accessible portion of reception desk to be flush with top counter edge.
ELECTRICAL
Drawing E2-1
1. Refer to “Lighting General Notes and add note 15 as follows:
“Support all grid-mounted fixtures from metal deck. Metal deck is approximately 20’-0” above finishedfloor.”
2. Refer to Room 128:
a. Provide three (3) “B1” pot lights within room 128. Pot lights to be spaced 5’-6” on center from eachother. The center point of the northern most light shall be located 2’-6” from north wall. Center point oflights shall be located 1’-0” east of gridline 6. Lights shall be circuited to D:87.
KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10
December 14, 2017 Page 3 of 4 T 519.576.2150 F 519.576.5499
b. Provide manual light switch in accessible location within room 128. Switch will control all lighting
within room 128. Switch shall be configured to control scheme “b”.
3. Refer to room 129 and add additional C1 fixture to circuit D:89. Fixture shall be located 8’-0” west of northern occupancy sensor.
4. Refer to ADE-2 and provide E1 remote head as shown on ADE-2. Circuit to EBB5.
5. Refer to room 135A and provide E1 remote head mounted on north wall. Circuit to EBB2.
6. Refer to ADE-3: a. Provide two (2) type “X1” exit lights on room 134 exit doors as shown on ADE-3. b. Provide one (1) type “E1” emergency light in room 134 as shown on ADE-3.
7. Revise all C1 fixtures in the following rooms to F1:
a. 103, 106, 107, 110, 118, 120, 122, 123, 129, 139,140, 141, 142, 143, 144, 145 8. Delete B1 fixtures and associated light switch from the following rooms:
a. 116, 117 Drawing E2-2 1. Provide two (2) additional receptacles as shown on ADE-1. Circuit receptacles to D:34.
2. Provide one (1) additional data outlet as shown on ADE-1.
3. Refer to room 135:
a. Revise two (2) GFCI receptacles located on south wall to be non-GFCI receptacle. Exact location
shall be coordinated on site with owner.
4. Refer to room 135A: a. Provide ground bus bar behind door swing.
5. Refer to room 101:
a. Receptacles and telecommunications outlets on east side of room shall be installed in millwork.
6. Refer to room 113:
a. Junction box in room shall be located in ceiling space. Conduit to extend from junction box through
wall to beneath the floor. Drawing E3-1 1. Refer to detail 1:
KidsAbility – Guelph Hub Renovation ADDENDUM #2 Project No.: 2017-0342-10
December 14, 2017 Page 4 of 4 T 519.576.2150 F 519.576.5499
a. Clarification: For fuses indicated to be disconnected and removed, only fuses shall be removed while
existing disconnects shall remain.
2. Refer to detail 2: a. Revise single line diagram as per ADE-4 & ADE-5. b. Revise drawing note 1 to read: “Coordinate with Guelph Hydro for installation of new meter.
Contractor to provide meter cabinet in accordance with Guelph Hydro standards. Guelph Hydro to provide meter.”
c. Add drawing note 2 as follows: “Lighting branch wiring circuits run through Panel RP-D. Refer to
“LNCP” 8 Relay Panel Circuit Schedule for quantity and destination of circuits.” Drawing E3-2 1. Refer to the Light Fixture Schedule and replace type J1 with TCP, Flat Panel cat no. TCP-FP-2-U-ZD-36-
35K.
2. Refer to “Lighting Fixture Schedule” and revise Type E1 as follows:
“Refer to “Mounting Height” and revise to read: “If wall mounted, mount 8’-0” A.F.F. If shown to be ceiling mounted, suspend from ceiling with metal rods 8’-0” A.F.F.”
Drawing E3-3 1. Refer to Panel Schedule D and revise panel’s main breaker to be 400A breaker. 2. Refer to detail 2, room 115 and provide ground bus bar in northeast corner of room. 3. Refer to detail 7:
Clarification: Coordinate with Guelph Hydro for installation of new meter. Contractor to provide meter cabinet in accordance with Guelph Hydro standards. Guelph Hydro to provide meter.
END OF ADDENDUM
Attachment 00 43 33.26 ADE-1 ADE-2 ADE-3 ADE-4 ADE-5 Distribution Bidders Nancy Buchanan, KidsAbility Vikki Dupuis, KidsAbility Fei Wei, WalterFedy Elena Wiersma, WalterFedy Maria Melo, WalterFedy Sheri Thompson, WalterFedy Mike Snyder, WalterFedy
KidsAbility – Guelph Hub Renovation 00 43 33.26 ADD2 Project No.: 2017-0342-10 APPROVED MANUFACTURERS LIST – ELECTRICAL WALTERFEDY Page 1
1 General
1.1 The following information is submitted in conjunction with our firm bid to:
.1 WALTERFEDY
.2 __________________________________________________________________
(NAME OF GENERAL CONTRACTOR)
1.2 This list will be requested of the successful contractor within 24 hours of Bid Closing. (Email or fax is acceptable.)
1.3 This is a name type specification and the following applies:
.1 Material and equipment are specifically described and named in this specification for the purpose of establishing a minimum standard of materials, product quality and specific requirements to which each Trade must adhere.
.2 The price submitted for this contract shall be based on the use of materials and equipment as specified. If this Trade wishes to quote on materials and equipment other than that specified, the Trade may select from the Approved Manufacturer's List, shown below. The Trade may use this equipment in his bid but must submit the name of the manufacturer with his bid. Otherwise only the specified manufacturer's equipment will be accepted.
.3 All of the materials required for the performance of the work shall be new and the best of their respective kinds and a uniform pattern throughout the work.
.4 Any equipment substituted for the specified equipment must not exceed space requirements allocated on the drawings. Where equipment is substituted for that which is shown on the drawings, this Trade is to submit shop drawings showing revised layouts of equipment rooms, mechanical rooms, etc., for approval.
.5 Specified equipment or equipment listed by Model Number is usually used as a basis for design performance, physical arrangements, weights, shape, wiring, controls and starter requirements, etc. If any other alternate equipment is proposed, it is a requirement that all pertaining factors listed above are checked by this Trade, and allowance be made in his tender on a "Turn Key" basis. Furthermore, it is this Trade's responsibility to co-ordinate all above items prior to roughing in, in conjunction with other trades.
Division 26
Disconnect Switches, Eaton Lighting and power panels Siemens
Schneider Electric
Motor Controls, Relays, Contactors, etc. Allen-Bradley Siemens
Eaton Schneider Electric
Fuses Gould
Bussman
KidsAbility – Guelph Hub Renovation 00 43 33.26 ADD2 Project No.: 2017-0342-10 APPROVED MANUFACTURERS LIST – ELECTRICAL WALTERFEDY Page 2
Electric Heating Units and Controls Chromalox Ouellet Stelpro
Cable Tray Thomas & Betts
CER Pursley 2000
Service Poles Hubbell
Wiremold Emergi-Lite
Wiring Devices Hubbell
Pass and Seymour Leviton
Time Switches and Photo Electric Controls Tork
Paragon Intermatic
Lighting Controls Legrand/Watt Stopper
Leviton Sensor Switch/Accuity
Lutron Eaton
Philips Douglas
GE
LED Light Fixtures Lithonia Eaton Hubbell Philips
Emergency Lighting Fixtures and Battery Units Thomas & Betts Beghelli Stanpro
Exit Signs Thomas & Betts
Beghelli Stanpro
END OF SECTION
NA
675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1
T: 519.576.2150 F: 519.576.5499 walter fedy.com
title:
project:
sheet no.:scale:
date:
job no.:
CAD file: E2-1_2017-0342-10
drawn by:
checked by:
Copyright © 2017 WalterFedy
KIDSABILITY GUELPH
HUB RENOVATION
ROOM 138 POWER &
SYSTEMS REVISIONS
(REFER TO DRAWING E2-2)
1/8"=1'-0"
2017.12.08
CM
2017-0342-10
ADE-1
D
C
675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1
T: 519.576.2150 F: 519.576.5499 walter fedy.com
title:
project:
sheet no.:scale:
date:
job no.:
CAD file: E2-1_2017-0342-10
drawn by:
checked by:
Copyright © 2017 WalterFedy
KIDSABILITY GUELPH
HUB RENOVATION
EMERGENCY LIGHTING
REVISIONS
(REFER TO DRAWING E2-1)
1/8"=1'-0"
2017.12.11
CM
2017-0342-10
ADE-2
J
H
10
675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1
T: 519.576.2150 F: 519.576.5499 walter fedy.com
title:
project:
sheet no.:scale:
date:
job no.:
CAD file: E2-1_2017-0342-10
drawn by:
checked by:
Copyright © 2017 WalterFedy
KIDSABILITY GUELPH
HUB RENOVATION
ROOM 134 EXIT
LIGHTING REVISIONS
(REFER TO DRAWING E2-1)
1/8"=1'-0"
2017.12.12
CM
2017-0342-10
ADE-3
FEEDER SCHEDULE
FEEDER SCHEDULE NOTES:
675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1
T: 519.576.2150 F: 519.576.5499 walter fedy.com
title:
project:
sheet no.:scale:
date:
job no.:
CAD file: E2-1_2017-0342-10
drawn by:
checked by:
Copyright © 2017 WalterFedy
KIDSABILITY GUELPH
HUB RENOVATION
SINGLE LINE DIAGRAM
REVISIONS
(REFER TO DRAWING E3-1)
N.T.S.
2017.12.12
CM
2017-0342-10
ADE-4
675 Queen Street South, Suite 111, Kitchener, Ontario N2M 1A1
T: 519.576.2150 F: 519.576.5499 walterfedy.com
title:
project:
sheet no.:scale:
date:
job no.:
CAD file: E2-1_2017-0342-10
drawn by:
checked by:
Copyright © 2017 WalterFedy
KIDSABILITY GUELPH
HUB RENOVATION
SINGLE LINE DIAGRAM -
METER REVISIONS
(REFER TO DRAWING E3-1)
N.T.S.
2017.12.12
CM
2017-0342-10
ADE-5