John Norquist on the Mayor as Head City Designer for the Israeli Mayors Institute

Post on 29-Nov-2014

802 views 2 download

Tags:

description

John Norquist on the Mayor as Head City Designer for the Israeli Mayors Institute founded by the Movement for Israeli Urbanism - www.miu.org.il Zafed, June 2010

Transcript of John Norquist on the Mayor as Head City Designer for the Israeli Mayors Institute

SCHOOL SIZE

Minimums:Elementary Schools = 10 acres + 1 acre/100 students;Middle Schools = 20 acres + 1 acre/100 students; High Schools = 35 acres + 1 acre/100 students; Combination Schools = 20-40 acres + 1 acre/100 students

Maximums:Elementary Schools = 5 acres; Middle Schools = 10 acres; High Schools = 15 acres

LEED for Neighborhood Development Standard

Arkansas School Facility Manual: (from the Council of Educational Facility Planners)

Illinois

• Grades PK-6 = 5 acres plus 1 acre per 100 students.

• Grades 7-9 = 15 acres plus 1 acre per 100 students.

• Grades 9-12 = 20 acres plus 1 acre per 100 students.

LEED Neighborhood Development

• 5 acre maximum Elementary

• 10 acre maximum Middle School

• 15 acre maximum High School

CNU Emergency Response & Street Design Initiative

Connected and IntegratedConnected and Integrated

32nd  STREET BARRICADE

32nd  STREET BARRICADE

CNU Emergency Response & Street Design Initiative

Households per Fire Station

CNU Emergency Response & Street Design Initiative

Life Cycle Costs(based on 2-apparatus

station)

CNU Emergency Response & Street Design Initiative

Fire vs. Vehicle Injuries and Fatalities

2,596.00

3,032,672.00

16,400.0043,560.00

0.00

500,000.00

1,000,000.00

1,500,000.00

2,000,000.00

2,500,000.00

3,000,000.00

3,500,000.00

Fatalities Injuries

Inci

dent

s pe

r Yea

r

FireVehicle

CNU Emergency Response & Street Design Initiative

Traffic related issues;

Fire Related Issues;

Fire vs. Vehicle Injuries and Fatalities

2,596.00

3,032,672.00

16,400.0043,560.00

0.00

500,000.00

1,000,000.00

1,500,000.00

2,000,000.00

2,500,000.00

3,000,000.00

3,500,000.00

Fatalities Injuries

Inci

dent

s pe

r Yea

r

FireVehicle

10 14 18 22 26 30 34 380.01.02.03.04.05.06.07.0

AIS Severity (6=fatal)

10 14 18 22 26 30 34 38

Impact Speed (mph)

Impact Speed vs. Pedestrian Injury (impact only)

10 14 18 22 26 30 34 380.01.02.03.04.05.06.07.0

AIS Severity (6=fatal)

10 14 18 22 26 30 34 38

Impact Speed (mph)

Impact Speed vs. Pedestrian Injury (impact only)

Plan of Elgin 1917

General Improvements Planprepared by: Elgin Commercial Club

Plan of Elgin 1917

Highway & Arteries Plan

National Street CorridorPrevious Site of Elgin National Watch Company

Proposed Elgin Land Use PlanPromoting Walkable Mixed Use Centers

Proposed Mixed Use Centers & Urban Core

National Street Corridor

National Street Metra Station: TOD Study

Current National Street Streetscape

Proposed National Street Design Recommendations

Proposed National Street Streetscape

U.S. Route 20 Existing Conditions

½ mile walking radius