John Norquist on the Mayor as Head City Designer for the Israeli Mayors Institute
-
Upload
nachman-shelef -
Category
Design
-
view
802 -
download
2
description
Transcript of John Norquist on the Mayor as Head City Designer for the Israeli Mayors Institute
SCHOOL SIZE
Minimums:Elementary Schools = 10 acres + 1 acre/100 students;Middle Schools = 20 acres + 1 acre/100 students; High Schools = 35 acres + 1 acre/100 students; Combination Schools = 20-40 acres + 1 acre/100 students
Maximums:Elementary Schools = 5 acres; Middle Schools = 10 acres; High Schools = 15 acres
LEED for Neighborhood Development Standard
Arkansas School Facility Manual: (from the Council of Educational Facility Planners)
Illinois
• Grades PK-6 = 5 acres plus 1 acre per 100 students.
• Grades 7-9 = 15 acres plus 1 acre per 100 students.
• Grades 9-12 = 20 acres plus 1 acre per 100 students.
LEED Neighborhood Development
• 5 acre maximum Elementary
• 10 acre maximum Middle School
• 15 acre maximum High School
CNU Emergency Response & Street Design Initiative
Connected and IntegratedConnected and Integrated
32nd STREET BARRICADE
32nd STREET BARRICADE
CNU Emergency Response & Street Design Initiative
Households per Fire Station
CNU Emergency Response & Street Design Initiative
Life Cycle Costs(based on 2-apparatus
station)
CNU Emergency Response & Street Design Initiative
Fire vs. Vehicle Injuries and Fatalities
2,596.00
3,032,672.00
16,400.0043,560.00
0.00
500,000.00
1,000,000.00
1,500,000.00
2,000,000.00
2,500,000.00
3,000,000.00
3,500,000.00
Fatalities Injuries
Inci
dent
s pe
r Yea
r
FireVehicle
CNU Emergency Response & Street Design Initiative
Traffic related issues;
Fire Related Issues;
Fire vs. Vehicle Injuries and Fatalities
2,596.00
3,032,672.00
16,400.0043,560.00
0.00
500,000.00
1,000,000.00
1,500,000.00
2,000,000.00
2,500,000.00
3,000,000.00
3,500,000.00
Fatalities Injuries
Inci
dent
s pe
r Yea
r
FireVehicle
10 14 18 22 26 30 34 380.01.02.03.04.05.06.07.0
AIS Severity (6=fatal)
10 14 18 22 26 30 34 38
Impact Speed (mph)
Impact Speed vs. Pedestrian Injury (impact only)
10 14 18 22 26 30 34 380.01.02.03.04.05.06.07.0
AIS Severity (6=fatal)
10 14 18 22 26 30 34 38
Impact Speed (mph)
Impact Speed vs. Pedestrian Injury (impact only)
Plan of Elgin 1917
General Improvements Planprepared by: Elgin Commercial Club
Plan of Elgin 1917
Highway & Arteries Plan
National Street CorridorPrevious Site of Elgin National Watch Company
Proposed Elgin Land Use PlanPromoting Walkable Mixed Use Centers
Proposed Mixed Use Centers & Urban Core
National Street Corridor
National Street Metra Station: TOD Study
Current National Street Streetscape
Proposed National Street Design Recommendations
Proposed National Street Streetscape
U.S. Route 20 Existing Conditions
½ mile walking radius