Job Performance Requirement 10-24. Advancing the Triple-Layer Load. A Grab the layer with the nozzle and place it on the shoulder. JPR 10-24A. B Pull the layers out of the slot, or another firefighter can grab the next layer. JPR 10-24B. C Stretch the hose to the fire. - PowerPoint PPT Presentation
Transcript of Job Performance Requirement 10-24
Job PerformanceRequirement 10-24
Advancing the
Triple-Layer Load
A Grab the layer with the nozzle and place it on the shoulder.
JPR 10-24A
B Pull the layers out of the slot, or anotherfirefighter can grab the next layer.