ing. Marcello Fiorenza

ing. Marcello Fiorenza

Each room measures from 20 to 30 square meters and 'designed to ensure maximum privacy to the patient.

European Congress for Hospital Engineering Bern, 10th - 12th April 2013

ing. Marcello Fiorenza

Each room measures from 20 to 30 square meters and 'designed to ensure maximum privacy to the patient Ogni camera, ampia da 20 a 30 mq e' stata progettata per garantire al malato la massima privacy,

ing. Marcello Fiorenza

Rooms are equipped with air conditioning, changes of air and radiant panels on the roof for an optimization of the temperature.

European Congress for Hospital Engineering Bern, 10th - 12th April 2013

ing. Marcello Fiorenza

alarm, central call, medical gas system, telephone system and television.

European Congress for Hospital Engineering Bern, 10th - 12th April 2013

ing. Marcello Fiorenza

ing. Marcello Fiorenza

ing. Marcello Fiorenza

through a connective reading room or conversation or community or reading room

European Congress for Hospital Engineering Bern, 10th - 12th April 2013

ing. Marcello Fiorenza

ing. Marcello Fiorenza

ing. Marcello Fiorenza

ing. Marcello Fiorenza

ing. Marcello Fiorenza

ing. Marcello Fiorenza

ing. Marcello Fiorenza

a medical center, a room for service personnel, a bathroom ...

European Congress for Hospital Engineering Bern, 10th - 12th April 2013

ing. Marcello Fiorenza

ing. Marcello Fiorenza

On the ground floor, however, it is a dedicated multi-purpose room for volunteers, for meeting of the medical staff and some local as locker room.

European Congress for Hospital Engineering Bern, 10th - 12th April 2013

ing. Marcello Fiorenza

the heating power plant is located outside the plexus but below the multi-purpose hall.

European Congress for Hospital Engineering Bern, 10th - 12th April 2013

ing. Marcello Fiorenza

the eating unit system plant is located outside the plexus but below the multi-purpose hall.

ing. Marcello Fiorenza

the property is surrounded by greenery and is located in a hilly area ventilated and sunny with views of the city of Rieti.

European Congress for Hospital Engineering Bern, 10th - 12th April 2013

ing. Marcello Fiorenza

ing. Marcello Fiorenza

ing. Marcello Fiorenza

The project has cost € 3.2 m euro with dedicated funds

The actual operation time was 30 months