S. NO. PARTICULARS1.0 EXECUTIVE SUMMARY2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATIONi IDENTIFICATION OF PROJECT AND PROJECT PROPONENTii BRIEF DESCRIPTION OF THE NATURE OF PROJECTiii NEED FOR THE PROJECT & ITS IMPORTANCE TO THE COUNTRY/ REGIONiv DEMAND – SUPPLY GAPv IMPORTS VS. INDIGENOUS PRODUCTIONvi EXPORT POSSIBILITYvii DOMESTIC/EXPORT MARKETSviii EMPLOYMENT GENERATION (DIRECT AND INDIRECT) DUE TO THE PROJECT3.0 PROJECT DESCRIPTIONI TYPE OF PROJECT INCLUDING INTERLINKED AND INDEPENDENT PROJECTS, IFANYII LOCATION (MAP SHOWING GENERAL LOCATION, SPECIFIC LOCATION, ANDPROJECT BOUNDARY & PROJECT SITE LAYOUT) WITH COORDINATESIII DETAILS OF ALTERNATIVE SITE CONSIDEREDIV SIZE AND MAGNITUDE OF OPERATIONV PROJECT DESCRIPTION WITH PROCESS DETAIL4.0 SITE ANALYSIS5.0 PLANNING BRIEF6.0 PROPOSED INFRASTRUCTURE7.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN8.0 PROJECT SCHEDULE & COST ESTIMATES9.0 ANALYSIS OF PROPOSAL
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 1
PRE – FEASIBILITY REPORT
1.0 EXECUTIVE SUMMARY
This is a new Gypsum Mining Project (M.L. No. 39/2013, Area: 4.7250 ha) for mineral Gypsum
with production capacity-90,000 TPA Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,
District: Bikaner (Rajasthan). LOI was issued in favor of Shri Ratan Lal Godara S/o Shri Hira
Ram Godara dated 24.11.2014 followed by letter dated o8.05.2015. Extension of LOI issued
vide letter number DMG/BIKA/CC-3/P.1 (1)39/2013/1765 dated 17.06.2015 (Copy of the same
annexed as Annexure-I) Mining Plan with progressive Mine Closure Plan has been approved
by Superintending Mining Engineer Mines & Geology Dept. Bikaner, vide letter no.
SME/BKN/CC-II/ M.P/M.L-39/13/3944 dated 24.06.2015. (Copy enclosed as Annexure-II)
Table-1
Salient features of the Project
S. No. Particulars Details
A. Mining Lease Details
1. Name of the Project Gypsum Mining Project
2. Mineral Gypsum
3. Mining Lease Number M.L. No. 39/2013
4. Mining Lease Area Area 4.725 ha
5. Lease Holder (Proposed) Shri Ratan Lal Godara S/o Shri Hira Ram Godara
6. Lease Validity 30 Years
B Location
7. Village Chak 27-28 BLD
8. Tehsil Khajuwala
9. District Bikaner
10. State Rajasthan
11. Latitude & Longitude Geographical Extents:
Latitude- 28°24'5. 84"N to 28°24'12.82"N
Longitude- 72°24'5.4"E to 72°24'13.82"E
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 2
S. No. Particulars Details
12. Toposheet No. 44D/04
C. Other Details
13. Cost of the project Rs. 10.0 Lacs
14. Cost for Environmental
Protection Measures
Rs. 0.50 lac
15. Cost of Plantation Rs. 0.20 lacs
16. ESR/ CSR Cost Rs. 0.50 lacs per annum
17. Cost for Laboures Rs. 0.60 lacs per annum
18. Seismic Zone II
2.0 INTRODUCTION OF THE PROJECT/ BACKGROUND INFORMATION
(i) Identification of Project and Project Proponent
Shri Ratan Lal Godara S/o Shri Hira Ram Godara is an individual lessee having registered
office at R/O D-7 Antodya Nagar, District- Bikaner (Rajasthan).
(ii) Brief Description of the Nature of Project
This is a new mining project & will be done by semi mechanized open cast method. As per
amendment in EIA Notification dated 15.01.2016, the project is falling under Cat. A {as the
said mining project is nearby to one MLA > 50 ha i.e. 1000 ha (Environmental clearance for
the project has already been granted) and to be dealt at the level of MoEFCC, New Delhi}.
(iii) Need for the Project & Its Importance to the Country/ Region
Gypsum will be used for manufacturing of Plaster Of Paris for captive use.
(iv) Demand – Supply Gap
Gypsum will be used for manufacturing of Plaster Of Paris for captive use.
(v) Imports vs. Indigenous Production
Gypsum produced in the proposed mine will be used only for Plaster of Paris
Manufacturing factories owned by lessee.
(vi) Export Possibility
There is no export possibility as this mine will be captive to the Plaster Of Paris
manufacturing factories owned by lessee.
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 3
(vii) Domestic/Export Markets
Gypsum produced in the proposed mine will be used only for Plaster of Paris
Manufacturing factories owned by lessee.
(viii)Employment Generation (Direct and Indirect) due to the Project
Approx. 07 skilled, semiskilled and unskilled manpower will be employed required in the
mine.
2.0 PROJECT DESCRIPTION
(i) Type of Project Including Interlinked And Independent Projects, If Any
Shri Ratan Lal Godara S/o Shri Hira Ram Godara has a Gypsum Mining Project, M.L.
No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala, District:
Bikaner (Rajasthan).
Interlinked Project: -No Interlinked Project is there.
(ii) Location (map showing general location, specific location, and project boundary &
project site layout) with coordinates
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 4
Figure1: Location Map
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 5
(iii) Details of Alternate Sites Considered
No alternative site has been taken into consideration due to availability of mineral
resources in the area.
(iv) Size and magnitude of operation
Production of Gypsum (Production Capacity- 90,090 TPA) from this mine is proposed
and the mining will be done by opencast semi mechanized method by using earth
movers like JCB.
(v) Project Description with Process Detail
(1) Salient features along with project vicinity details of the Mining project is
given below:
Table - 2
Salient Features of the Project
S. No. Particulars Details
1. Name of the Project Gypsum Mining Project
2. Mineral Gypsum
3. Mining Lease Number M.L. No. 39/2013
4. Mining Lease Area Area 4.725 ha
5. Lease Holder (Proposed) Shri Ratan Lal Godara S/o Shri Hira Ram Godara
6. Lease Period 30 years
7. Geological reserve 415800 tonnes
8. Mineable reserve 360360 Tonnes
9. Life of Mine 4 years
10. Elevation Range in the area 100 AMSL -102 AMSL
11. General ground level 100 AMSL
12. Ground Water table 70 m bgl
13. Ultimate Working Depth 4.5 meter from surface level
Mining will not intersect ground water table
Source- Approved Modified Mining Plan with progressive mine closure plan.
(2) GEOLOGY OF THE AREA –
Gypsum in this region found in three formations-
1. Pleistocene to recent formation- Desert gypsum (Gypsite) in sand alluvium.
2. Vindhyan sand stone formation- Interbedded bands and beds of rock gypsum.
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 6
3. Post Delhi deposits- Selenite crystalline deposits in various salts lakes of western rajasthan.
Regional Geology
Age Formation Rock type
Recent Quarternary
Sediments
Sands and sandy alluvium calcareous
Grit, kankar amd semi consolidated
Conglomerate and selenite.
Pleistocene Bap Boulders
and
lambariyan
Diamictite
Associate pebbles, cobbles, boulders and
erratices of granite, quartzite.rhyolite and
dolomite.
ESTIMATION OF RESERVES
Proved 311850 tonnesProbable 103950 tonnesMineable Reserves 360360 tonnes
(3) Method of Mining
The mining will be done by opencast semi mechanized method by using earth movers
like JCB. The overburden and mineral will be excavated with the help of JCB. The
mineral Gypsum is overlain by sand dunes so far the exploitation of mineral there is
requirement of removal of the over burden and stack sand cover separately at the
appropriate location. Since the deposit occurs at a depth of 0.10-0.50 cm and the
thickness of the deposit is sufficient to be economically mineable. The height of the
bench will be kept 4.0 meters in mineral. Overburden will be removed and
transportation of Gypsum from mining pit to trucks and dumpers. Drilling and blasting
will not be required.
Table-3 EXTENT OF MECHANIZATION
S.No. Machinery Number
1. JCB 1
2. Tractor 2 (on hare basis)
3. Dumper 2 (on hire basis)
Source: Approved Modified Mining Plan with Progressive Mine Closure Plan
5. PROPOSED YEAR WISE PRODUCTION DETAILS OF THE NEXT YEARS
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 7
The proposed Year-wise production plan for next years is mentioned in the table given
below:
Table – 4
Year Wise Production for Modified Mining Plan with Progressive Mine Closure Plan
Year Gypsum (Tonnes)
1st Year 90090
2nd Year 90090
3rd Year 90090
4th Year 90090
Total 360360
Source: Approved Modified Mining Plan with Progressive Mine Closure Plan
6. WASTE GENERATION & DISPOSAL
Around 8190 cu.m of overburden will be generated during mining operation.
Table – 5
Year Wise Waste Generation of Modified Mining Plan with Progressive Mine Closure Plan
Year Waste in Cum
I 8190
II -
III -
IV -
Total 8190
Source: Approved Modified Mining Plan with Progressive Mine Closure Plan
7. CONCEPTUAL PLAN
At the end of life of mine, 4.0950 ha. area will be excavated, out of which 4.0950 ha will be
backfilled & used for agriculture purpose, 0.0025 ha area will be under infrastructure and 0.6275
ha area will be covered under green belt on around the lease periphery.
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 8
Table No.:6
Post Mining Plan (Conceptual) Land Pattern of ML Area (Ha.)
S. No. Description
Land Use (In ha)
PlantationWater
Body
Public
UseUndisturbed Total
1. Top Soil Dump - - - - -
2.External Waste Dump - - - - -
3. (a) Excavation (Voids) - - - -
(b) Excavation (Backfilling)* - - 4.0950 - 4.0950
4. Road - - - - -
5. Built Up Area - - 0.0025 - 0.0025
6. Township Area - - - - -
7. Afforestation 0.6275 - - 0.6275
8. Mineral Storage - - - - -
9. Undisturbed Area - - -
Total 0.6275 - 4.0975 - 4.725
*At the end of life of mine 4.0950 ha of excavated area will be backfilled & developed as fertile land for
agriculture purpose.
(vi) Raw Material Required Along With Estimated Quantity, Likely Source, Marketing Area of
Final Products, Mode of Transport of Raw Material and Finished Product.
This is a Gypsum Mining Project. No raw material will be required to dependent industries.
(vii) Resources Optimization/ Recycling and Reuse Envisaged in the Project, if any, should be
briefly Outlined
No waste water will be generated from mining operation.
Domestic sewage water generated from office toilet will be disposed in soak pits via
septic tank.
(viii) Availability of Water Its Source, Energy /Power Requirement and Source
A. Water requirement:
Total Water requirement estimated will be about 3 KLD for spraying and domestic
uses and will be sourced from nearby villages.
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 9
B. Power requirement:
No electrical energy will be required since mine will be operated in one shift only.
(ix) Quantity of Waste to Be Generated (Liquid and Solid) And Scheme for Their
Management/Disposal:
Around 8190 cu.m of overburden will be generated during mining operation. After
removal of mineral the land will be used for agriculture purpose.
3.0 SITE ANALYSIS
(i) Connectivity
The lease area about 98.0 km away from the Bikaner district in SE Direction from mine
site. Nearest Town is Khajuwala ~38 km from mine site in NE direction, nearest railway
station is Bikaner Railway Station at a distance of ~98.0 km in SE direction from Mine
site and nearest airport is Jodhpur Airport, Jodhpur at a distance of ~247 Km in SSE
direction. The lease area is well connected through roads.
(ii) Land Form, Land Use and Land Ownership
Existing Land Use Pattern
The total ML area of 4.725 ha comprises of Private Waste Land (Under possession of
lessee)
(iii) Topography
The lease area is showing almost flat topography. The general slope of the area is
towards south west direction. The elevation of the lease area ranges from 100 AMSL
to 102 AMSL.
Existing Land Use Pattern {Agriculture, Non-Agriculture, Forest, Water Bodies
(Including Area Under CRZ)}, Shortest Distances From The Periphery Of The Project
To Periphery Of The Forests, National Park, Wild Life Sanctuary, Eco Sensitive Areas,
Water Bodies (Distance From The HFL Of The River), CRZ. In Case Of Notified
Industrial Area, A Copy Of The Gazette Notification.
Table – 7
Environmental Settings
S. No. Particular Details
1. Nearest Village Chak 27-28 BLD is ~ 1.0 km in NE direction
2. Nearest city/ town Khajuwala ~38 km from mine site in NE direction.
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha Near Village: Chak 27-28 BLD, Tehsil: Khajuwala,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 10
3.Nearest Railway Station Bikaner Railway Station at a distance of ~98.0 km in SE
direction from Mine site
4.Nearest Airport Jodhpur Airport, Jodhpur at a distance of ~247 Km in SSE
direction
5. Archaeological Important Place None, within 10 km radius area of mine site.
6. Ecological Sensitive Areas
(National Park, Wildlife Sanctuary,
Biosphere Reserve etc.)
There is no National Park, Wild Life Sanctuaries, Biosphere
Reserves, Tiger Reserves, Wildlife Corridors, etc. within 10
km radius
9. Reserved/Protected Forest within
10 km radius
None, within 10 km radius area of mine site.
10. Nearest River / water body None, within 10 km radius area of mine site.
Source: SOI Toposheet
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Khajuwala, District: Bikaner (Rajasthan)Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 11
Figure 2: Key plan
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 12
(iv) Existing Infrastructure:
There is a small mine office cum rest shelter is available at site and some
vegetations existing in the lease area which will be cleared when required. Total
lease area is Private Waste land.
4.0 PLANNING BRIEF
(i) Planning Concept (Type of Industries, Facilities, and Transportation etc.) Town
and Country Planning/Development Authority Classification
This is an Open Cast semi-mechanized mining Project
(ii) Population Projection
07 Manpower required will be engaged from nearby areas. No significant influx
of people is anticipated in the area.
(iii) Land Use Planning
The proposed mining lease area is 4.725 ha. The area comprises of Private waste
land.
LAND: STAGE WISE LAND USE AND RECLAMATION AREA (in Ha.)
S. No. Land use Category Present 4th YearEnd of life of
mine
1 Top Soil Dump - - -
2 Waste Dump (External) - - -
3 Excavation (Voids Only) - - -
4 Road - -
5 Built up Area - 0.0025 0.0025
6 Township Area - - -
7 Afforestation - 0.6275 0.6275
8 Reclamation (Backfilled)* - 4.0950 4.0950
9 Mineral stack - _ -
10 Processing (Crushing) - - -
11 Undisturbed Area 4.725 _
Total 4.725 4.725 4.725
*At the end of life of mine 4.0950 ha of excavated area will be backfilled & developed as fertile
land for agriculture purpose,
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 13
(iv) Assessment of Infrastructure Demand (Physical & Social)
Lessee will assess the demand of infrastructure (Physical & Social) in nearby
area of the proposed mine site and same will be developed under social work.
(v) Amenities/Facilities
Lessee will develop the Amenities/Facilities in the nearby area of the proposed
mine site as per requirement of local people of the nearby area under corporate
social responsibility programs.
5.0 PROPOSED INFRASTRUCTURE
(i) Residential Area (Non Processing Area)
This is not required as mine workers will come from nearby villages. Rest shelter
to the workers already exists in the major mining lease of the lessee.
(ii) Green Belt
Green belt will be developed on the periphery of the lease area as well as
outside of the lease area equal to 33% of the lease area.
(iii) Connectivity
The lease area about ~98.0 km away from the Bikaner district in SE Direction
from mine site. Nearest city is Khajuwala ~38 km from mine site in NE direction,
nearest railway station is Bikaner Railway Station at a distance of ~98.0 km in SE
direction from Mine site and nearest airport is Jodhpur Airport, Jodhpur at a
distance of ~247 Km in SSE direction. The lease area is well connected through
roads.
(iv) Water Management (Source & Supply of water)
Total Water requirement estimated is about 3 KLD for spraying and domestic
uses and will be sourced from nearby villages.
(v) Sewerage System
Domestic sewage water generated from office toilet will be disposed in soak
pits via septic tank. Outside discharge is not envisaged.
(vi) Industrial Waste Management
No industrial waste water will be generated from this mining operation.
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 14
(vii) Solid Waste Management
Around 8190 cu.m of overburden will be generated during mining operation.After removal of mineral the land will be used for agriculture purpose.
(viii) Power Requirement & Supply/Source
No electrical energy will be required since mine will be operated in one shift only.
6.0 REHABILITATION AND RESETTLEMENT (R & R) PLAN
(i) Policy To Be Adopted (Central/State) In Respect Of The Project Affected
Persons Including Home Ousters, Land Ousters And Landless Laborers (Brief
Outline To Be Given).
Not Applicable as the lease area falls in Private waste land and there is no
habitation in the area.
7.0 PROJECT SCHEDULE & COST ESTIMATES
(i) Likely Date Of Start Of Construction And Likely Date Of Completion (Time
Schedule For The Project To Be Given)
The mining activity will be started after obtaining statutory clearances/consents
from respective authority.
(ii) Estimated Project Cost Along With Analysis In Terms Of Economic Viability of
the Project
Cost of the project Rs. 10.0 Lacs
Cost for Environmental Protection
Measures
Rs.0.50 lacs
ESR/ CSR Cost Rs. 0.60 lacs per annum
Cost for Laboures Rs. 0.50 lacs per annum
8.0 ANALYSIS OF PROPOSAL
Gypsum Mining Project will result in growth of the surrounding areas by increasing
direct and indirect employment opportunities in the region including ancillary
development and supporting infrastructure. Special emphasis on Financial and
Social benefits will be given to the local people including tribal population, if any, in
the area.
Development of social amenities will be in the form of medical facilities, and
providing books and school uniforms to the poor students of nearby schools.
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 15
No major adverse effect on environment is envisaged as the required mitigation
measures are inbuilt in the project.
9.0 ENVIRONMENTAL MANAGEMENT PLAN
9.1.1 AIR POLLUTION CONTROL MEASURES
Green belt will be developed on the periphery of the lease area.
Periodical water spraying on the haul roads will be done.
9.1.2 WATER MANAGEMENT
No waste water will be generated during the mining activities.
The rain water collected in mining pit will be used for plantation, dust
suppression requirements.
9.1.3 NOISE POLLUTION CONTROL MEASURES
Proper maintenance of all machines will be carried out which will reduce noise
generation during operations.
Workers will be exposed to high noise levels provided with ear muffs/plugs &
will be persuaded to use the same.
Adequate silencers will be provided in all the diesel engines.
Green belt will be developed around the lease boundary to minimize noise
propagation.
Periodic noise level monitoring will be done.
9.1.4 LAND RECLAMATION
Total mining lease area is 4.725 hectares.
At the end of End of the life of mine, total excavated area will be used as fertile
land for agricultural purpose.
9.1.5 SOLID WASTE MANAGEMENT
Around 8190 cu.m of overburden will be generated during mining operation. Afterremoval of mineral the land will be used for agriculture purpose.
9.1.6 GREEN BELT DEVELOPMENT
At the end of life of mine 0.6275 ha area will be covered under green belt on
around the lease periphery.
Local species will be preferred for plantation.
Gypsum Mining Project, M.L. No. 39/2013, Area 4.725 ha at Village: Chak 27-28 BLD, Tehsil: Pugal,District: Bikaner (Rajasthan)
Pre-Feasibility Report
Shri Ratan Lal Godara S/o Shri Hira Ram Godara 16
Tree guards will be provided for protection from animals.
Green belt will be developed on the periphery of the lease area and outside the
lease area equal to 33% of the lease area.