IEC 61850 Update of TC57 WG activities
Digital substation. Standard IEC 61850.
Digitalization of electrical power grid
Moscow, July 2 – 4, 2019
Christoph Brunner
Switzerland
© 2019 it4power
CB 2019-07-04
Content
Activities related to IEC 61850
Function modeling
Enhanced specification and design workflow
© 2019 it4power
CB 2019-07-04
Extended scope of IEC 61850
Area Control
Regional Control
Communication
network and systems
for power utility
automation
© 2019 it4power
CB 2019-07-04
New Domains
Area Control
Regional Control
FACTS
IEC 61850-90-14
Travel wave based fault location
IEC 61850-90-21
Steam and gas turbines
IEC 61850-7-410 Amd
© 2019 it4power
CB 2019-07-04
Improving Usability and Security
Area Control
Regional Control
IEC 61850-90-11: Logic modeling
IEC 61850-90-16: System management
IEC 61850-90-18: Alarm handling
IEC 61850-90-19: Role based access
IEC 61850-90-20: Redundant devices
© 2019 it4power
CB 2019-07-04
Distribution Network
Area Control
Regional Control
Electrical Energy Storage
IEC 61850-90-9 DER Grid Integration
IEC 61850-90-15
Microgrids
IEC 61850-90-23
© 2019 it4power
CB 2019-07-04
Further Extensions
Area Control
Regional Control
IEC 61850-8-2: Mapping XMPP
IEC 61850-90-13: Deterministic networking topologies
IEC 61850-90-22: SCD based communication network configuration
IEC 61850-6-100: SCL modeling for PACS
IEC 61850-6-2: HMI configuration
System and IED specification enhancements based on ENTSO-E
© 2019 it4power
CB 2019-07-04
Function modeling - Problem
LN semantic provides the semantic of the class, but not of the instance – XSWI is a disconnector – but which one?
– PDIS is a distance element – but which zone?
–Which one is the earth fault, which one the phase fault?
Prefixes may be used (e.g. QB1XSWI) but are not standardized
Impact –Weak documentation
© 2019 it4power
CB 2019-07-04
SCL Extension
Application Scheme
© 2019 it4power
CB 2019-07-04
BAP – defining the Application
© 2019 it4power
CB 2019-07-04
BAP – defining the Application
© 2019 it4power
CB 2019-07-04
ENTSO-E approach
© 2019 it4power
CB 2019-07-04
ENTSO-E approach
Function Specification
in IST
© 2019 it4power
CB 2019-07-04
ENTSO-E approach
Project Specification in SST including
simulation
© 2019 it4power
CB 2019-07-04
ENTSO-E approach
IED Specification and Selection
© 2019 it4power
CB 2019-07-04
SCL Extensions required
Support virtual signal flow as part of specification – In the functional part of SCL / independent of IEDs
– Using SourceRef in a similar way as ExtRef
– Include support of value preconfiguration
IED specification – Extend SCL to support IED specification beyond 61850 related
aspects
© 2019 it4power
CB 2019-07-04
Conclusion
Significant work is done to enhance the design and engineering efficiency
Users and vendors collaborate to achieve the goal – the ENTSO-E approach is currently prototyped in the European Research Project OSMOSE
© 2019 it4power
CB 2019-07-04
christoph.brunner@it4power.com
IEC 61850 Update of TC57 WG activities Digital substation. Standard IEC 61850. Digitalization of electrical power grid Moscow, July 2 – 4, 2019ContentExtended scope of IEC 61850New DomainsImproving Usability and SecurityDistribution NetworkFurther ExtensionsFunction modeling - ProblemSCL ExtensionBAP – defining the ApplicationBAP – defining the ApplicationENTSO-E approachENTSO-E approachENTSO-E approachENTSO-E approachSCL Extensions requiredConclusionSlide 18