BILL OF ENGINEERING MEASUREMENT& EVALUATION
PROJECT TITLE:-RELOCATION OF 2N0.LOW TENSION CONCRETE POLES
S/NO DESCRIPTIONS QTY UNIT RATE TOTAL
A POLES/FITTINGS& ACCESSORIES
1 1 NO 20000.00 20000.00
2 D IRON COMPLETE WITH SPINDLE[ORIGINAL] 4 NO 350.00 1400.00
3 3 NO 3500.00 10500.00
4 35 MTR. 2800.00 98000.00
5 4 NO. 1500.00 6000.00
6 16.0MM PVC COPPER CABLE [KABEL METAL] 50 MTR. 500.00 25000.00
7 8 MTR. 200.00 1600.00
8 LOT SUM 10000.00 10000.00
9 225X 150MM PLASTIC ADAPTABLE BOX 1 NO. 1500.00 1500.00
SUB TOTAL[1-9] _ _ _ 174000.00
LABOUR/HIRING OF HIAB _ _ _ 115000.00
GRAND TOTAL _ _ _ 289000.00
8.3M LOW TENSION REIN-FORCED CONCRETE POLE
COMPLETE STAY SHALL INCLUDE STAY WIRE ,STAY BLOCK ,STAY INSULATORS ETC
4X16.0MM PVC /SWA/PVC ARMOURED CABLE IN 50MM DIAM.UPVC PIPE[NIGERCHIN]
50MM DIAM.BI-METAL LINE TAP COMPLETE WITH ALL INSTALLATION ACCESSORIES
50X50MM PVC TRUNKING PIPES WITH ALL THE NECESSARY FIXING ACCESSORIES
SUNDRY ITEMS SHALL INCLUDE BOLT AND NUTS ETC