1
� Geo-technical Investigation.
� Topographical & Contour Survey.
� Rock Drilling/ Coring.
� Bored Cast-in-situ Pile
Foundation.
� Hydrographic Survey.
2
Field Test Laboratory Test
1 Standard Penetration Test (SPT)
IS.2131-1981.
1 Bulk and dry density
determination IS: 2720(Part2-
1973)
2 Static Cone Penetration Test
(SCPT) IS: 4968-3.
2 Liquid, plastic, shrinkage limit IS:
2720 (Part 5)-1985.
3 Dynamic Cone Penetration Test
(DCPT) IS: 4968-1
3 Sieve/Grain/hydrometer analysis
IS: 2720 (part-4)-1985.
4 Plate Load Test (PLT) IS: 1888. 4 Tri-axial Shear as per IS: 2720
(Part 12)-1981 (Reaffirmed 1987).
5 Cyclic Plate Load Test (CPLT)
IS:1888.
5 Specific gravity IS:2720 (P-3/S-1)-
1980.
6 Vane Shear Test (VST) IS: .4434. 6 Consolidation Properties of Soil as
per IS: 2720 (P-15)-1986.
7 Block Vibration Test (BVT) IS:. 7 Unit weight crushing strength &
co-efficient of softening of rock.
8 Cross Bore Hole Test (CBT) IS:
.13372.
8 Chemical analysis of soil and
water as per
9 California Bearing Ratio
Lab.(CBR) IS: 2720-16
9 pH value IS: 2720 (Part-26)-1987
10 California Bearing Ratio Test
Field (CBR)IS:2720-31
10 Total soluble sulfates IS: 2720
(Part-27)- 1977
11 Permeability Test Laboratory IS:
2720-part 17.
12 Permeability Test Laboratory as
per IS: 5529-part 1.
3
� The Techpro Engineers Pvt. Ltd. is a multidiscipline consulting
organization staffed with highly qualified and experienced consultants
in field of Geotechnical Investigation, Rock Core drilling for bridges,
tunnels, Structural designing, having capabilities to render services in
Haghways & Railways, Power plants, Metro Rails, Infrastructures.
� Er. Garg took up the challenge. and with undaunted determination
prevailed upon the common man that designing a building through a
set of thumb rules would never produce an optimal output as every
building is unique in its - Size, Shape, Loading, Founding System,
Location & Functionality and the role of an engineer is inevitable for an
efficient design of a structure.
� With its efficient, prompt and upright services, Techpro Engineers &
Consultants soon became a favorite consultancy firm amongst both
private and government clients and, before long, rechristened as
"Techpro Engineers Pvt. Ltd." in 2002. Today with an experience of
designing more than 1 crore sqft floor area of more than 1500 different
kinds of structures, Techpro Engineers Pvt. Ltd. stands out as a
prominent structural consultancy and sub-soil investigation company
in northern India.
4
To achieve and sustain a leading position in services of Geotechnical
Investigation, Engineering Survey, Foundation Consultancy, Highway
Engineering and Bridge Design as per National and International
Standards ensuring expectations of the customers with continual
improvement of the effectiveness of the Quality Management System.
OUR MISSION
Our organization is committed to fully satisfy its customers and all
stakeholders by providing them with safe, efficient and technologically
sound solutions in the field of Geotechnical Investigations for
Highway & Bridge design, Topographical & Contour Surveys. We
strive to achieve topmost quality in our work with continuous
improvement in all activities by using latest investigative technology
and effectively implementing our management systems.
5
� We Completed over 75000 Geo-technical investigations for buildings,
elevated water towers, roads & road bridges, Railway bridges, Metro
bridges, land fill, communication and electric towers, thermal power
plants, cooling tower etc. We have well experienced Engineers and other
technical supporting staff in our organization. A list is attached herewith
for ready reference.
Bharat Heavy
Electricals Ltd.
(BHEL).
Indian Waterways
Authority of India,
(IWAI).
Delhi Merto Rail
Corporation Ltd, New
Delhi. (DMRC).
Indian Railways.
Delhi Transco Ltd
Delhi.
Ircon International
Ltd.
Engineering Project
India Ltd (EPIL).
Indian Institute of
Technology
Hindustan Aeronautics
Ltd. (HAL).
Kolkata Port Trust,
Haldia Dock Complex.
HSCC India Ltd. Military Engineering Service (MES).
6
Indian Oil Corporation
Ltd.(IOCL).
Rail Vikas Nigam
Limited
National Building
Construction
Corporation Limited,
(NBCC).
RITES Ltd.
National Thermal
Power Corporation
Ltd.(NTPC).
Steel Authority of
India Ltd. (SAIL).
National Hihgway
Authority of India
(NHAI).
Tele Communication
India Ltd. (TCIL).
Neyveli Lignite
Corporation Limited.
Projects &
Development India Ltd.
(PDIL)
7
o In general; standards and specifications issued by the Bureau of
Indian Standards is followed. For Traffic & Transportation M.O.R.T.H.
Specifications and standards issued by Indian Road Congress is
followed. For CPWD work CPWD specifications, for Rail, Roads Code of
practice by Railway Board and building reference from Journals of
National Building Organization is followed. Where Indian specifications
are not available, international standards such as BS, AASHTO, and
ASTM etc, are followed.
8
1 Proposed position Geo-Technical Engineer
2 Name Mr. Saurabh Agarwaal
3 Contract address 15/88, Civil Lines, Kanpur-208 001
4 Date of Borth 27.03.1970
5 Nationality Indian
6 Educational
qualification
B. Tech. (civil), M. Tech. (Mechanics &
Foundations)
7 Other Training Nil
8 Language & degree or
proficiency
Speaking Reading Writing
English Excellent Excellent Excellent
Hindi Excellent Excellent Good
9 Membership of
professional societies
Professor as part time basis in civil Engg. Deptt.
At Hercourt Buttler Engineering College,
Kanpur, U.P.
10 Countries of work
Experience
India
11 Name of firm where
work
M/s. Techpro Engineers Pvt. Ltd. (Full Time)
12 Years with the Firm 14
13 Employment record
1. Name of Employer
2. Position held
3. Nature of duties
M/s. Techpro Engineers Pvt. Ltd.
Director
Geo-technical Engineer.
9
Ite
m
Sr.
No
.
Brief
Description of
project study
Name of
the
client
Cost
of
consu
ltancy
work
(Rs.
In
Lakhs
)
Period of work
completion
Description of
the actual
services provided
by the key
person Date
of
start
Date
of
comp.
Major project study completed
1 Geo technical
Investigation
at different
location for
BS-IV Project
at Barauni
Refinery.
The
Manager
(Cont.)
Indian
Oil
Corporat
ion. Ltd,
Barauni
Refinery.
7.10 18.01.
2016
23.03.
2016 Study of field
data and
laboratory data
for compilation
& designing
criteria of
allowable
bearing capacity
of founding
system for
proposed
structures.
2 GT work for
Grade
Separators,
Flyovers, & RE
Walls. Section
AB (KM
15.724) for
total length of
43KM of
Varanasi Ring
Road.
Associat
e
Director,
JACOBS
CES
Phase-1,
Gurgaon
7.35 02.07.
2015
10.08.
2015
14 Overall professional
experience in highway/ traffic
& transportation/ bridge
engineering or in related field
(in years)
15
15 Related work Experience (in
Years)
10
16 Detail of work Experience As under
10
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Rs. In
Lakhs)
Period of
work
completion
Description
of the
actual
services
provided by
the key
person
Date
of
start
Date
of
comp.
Major project study completed
3 GT work for
proposed
Hostel
building at
National
Sugar
Institute,
Kanpur
Executive
Engineer,
KCD,
CPWD, GT
Road,
Kanpur.
5.29 5.08.
14
10.09.
14
4 Sub Soil
Investigation
of ROBs in
lieu of L-Xing
(139,141,159,
167) and
RUBs in lieu
of 5 Nos. L-
Xing(142,146,
148,164 &
166) on
Ambala-
Ludhiyana
section.
Office of the
Dy. Chief
Engineer/
Const-II
Northern
Railways,
Chandigarh.
8.91 15.5.
14
15.11.
14
5 Soil
exploration for
rehabilitation
of old sewer
line under
Delhi Jal
Board.
TTI
ConsultinEn
gineers
(India) P.
Ltd., DJB
ITO,Deldi
5.00 25.6.
13
18.08.
13
11
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of
the client
Cost of
consulta
ncy
work
(Rs. In
Lakhs)
Period of work
completion
Descriptio
n of the
actual
services
provided
by the key
person
Date
of
start
Date
of
comp.
Major project study completed
6 Geotechnical
Investigation
of Elevated
Viaduct & Two
Elevated
Stations Viz
Johri Enclave
& Shiv Vihar
Stations from
chainage
57357.623M
of Line 7
Mukundpur-
Yamina Vihar
Corridor
MRTS.
Globe Civil
Projects
Ltd.,
6.6 15.06.
13
11.10.
13
7 Soil
Investigation
work for
installation of
Non
Recovery-
Heat
Recovery
(NR-HR) type
Coke Oven
Battery at
Nandini
Mines, Bhilai.
Dy.
General
Manager
I/c (Project
Contract
Cell-NTK,
SAIL.,
Bhilai Steel
Plant. CG
5.84 08.01.
12
17.07.
12
12
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consulta
ncy
work
(Rs. In
Lakhs)
Period of work
completion
Descriptio
n of the
actual
services
provided
by the
key
person
Date
of
start
Date
of
comp.
Major project study completed
8 Soil
Investigation
work of plot
for
Construction
of DO/ BO,
OQ & GH at
Satna, M.P.
Dy. Chief
Engineer,
Engg. Deptt.
CZO, LIC of
India Ltd.
Bhopal
1.45 28.01.
12
10.04.
12
9 Geo Technical
Investigation
for Elevated
Metro at
Jaipur, Raj.
DSCC Ltd.
55-
Mansarowar
,Jaipur,
Rajasthan
13.6 27.01.
11
27.01.
11
10 Sub Soil
Investigation
for
Construction
of new
Lecture Hall
at IIT,
Kanpur.
Superintend
ing
Engineer,
I.I.T.Kanpur.
1.3 10.01.
11
25.02.
11
11 Geotechnical
Investigation
for
development
of township
at Korba
STPP(1x500M
W)
Korba Super
Thermal
Power
Station,
Jamnipali,
Korba.
1.83 23.03.
09
08.05.
09
13
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Rs. In
Lakhs)
Period of work
completion
Descriptio
n of the
actual
services
provided
by the
key
person
Date
of
start
Date
of
comp.
Major project study completed
12 Soil
Investigation
for Children’s
Home at Tis
Hazari Metro
Station.
Delhi Metro
Rail
Corporation
Gurudwara,
Shakarpur,
Delhi.
1.39 28.01.
09
10.03.
09
13 GT work for
ROB, RUB,
RE Walls for
rehabilitation
of existing two
lanes from
Km. 208.00 to
251.700 (pkg-
6)on Ayodhya-
Gorakhpur
section of NH-
28 in UP
B.Seenaiah
& Company
(Projects)
Ltd.
Gaurapur,
Atraura,
Khalilabad,S
ant Kabir
Nagar.
6.0 15.12.
07
10.02.
08
Major project study in Hand
14 Sub soil
investigation,
for bridges for
ROB in lieu
of level
crossing Nos.
5C, 11C,&
16C on
Meerut
Khurza
section.
CPM TATA-
ALDESA (JV),
DFCCIL, LOT
101.
MAITHA.
8.91 15.05.
16
In
progre
ss
14
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
consul
tancy
work
(Rs. In
Lakhs)
Period of work
completion
Descriptio
n of the
actual
services
provided
by the
key
person
Date
of
start
Date
of
comp.
Major project study completed
2 Geo-technical
investigation
for widening
Up gradation
to 2 Lane of
NH 301
(Kargil
Zanskar Road)
in J&K.
Feedback Infra
Private Ltd.
Highway
Division 15th;
Floor, Tower
9B, DLF Cyber
City Phase
III,Gurgaon,
Haryana.
28.03 20.05.
16
In
progre
ss
3 GT work at
Different
Locations of
Railway Major
Bridges, RUB,
ROB and
Deep Cutting
etc.Between
CH: 0 KM to
73 KM (Satna
to Panna
Section) of
Lalitpur
Singarauli
New BG rail
line project.
Chief
Engineer-II
(Constn]WCR/
JBP
West Central
Rly. BHOPAL
29.28 22.06.
17
In
progre
ss
15
1 Proposed position Geo-Technical Engineer
2 Name Mr. Arvind K. Garg
3 Contract address 603, Gangotri,pptt.
7/216, Swaroop Nagar,
Kanpur-208 002, M-9336101462
Email: info@techproindia.com
4 Date of Borth 02.02.1965
5 Nationality Indian
6 Educational qualification B. Tech. (civil), M. Tech. (Structure)
7 Other Training Quality Manager for laboratories as per ISO
17025-2005
under Bureau of Indian Standards, New Delhi
8 Language & degree or
proficiency
Speaking Reading Writing
English Good Excellent Excellent
Hindi Excellent Excellent Good
9 Membership of
professional societies
Nil
10 Countries of work
Experience
India
11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)
12 Years with the Firm 25 Years
13 Employment record
1. Name of Employer
2. Position held
3. Nature of duties
M/s. Techpro Engineers Pvt. Ltd.
Managing Director
Soil Exploration and Structural Designing.
16
14 Overall professional
experience in highway/ traffic
& transportation/ bridge
engineering or in related field
(in years)
20
15 Related work Experience (in
Years)
25
16 Detail of work Experience As under
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Description
of the
actual
services
provided by
the key
person
Date
of
start
Date
of
comp.
Major project study completed
1 GT work for
proposed
beautification
of Lohia
Botanical
Garden Near
Ganga
Barrage,
Kanpur,U.P.
Executive
Engineer,
Zone-1,
Kanpur
Development
Authority,
Kanpur.
15.39 02.02.
15
25.09.
15
2 Geotechnical
Investigation
for proposed
32 Nos. LIGs
and 72 Nos.
EWS
buildings at
Sector C
under Kalindi
Vihar Yogna,
Agra, U.P.
Executive
Engineer-5,
Agra
Development
Authority,
Agra.
2.25 09.06.
15
08.08.
15
17
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Descriptio
n of the
actual
services
provided
by the key
person
Date
of
start
Date
of
comp.
Major project study completed
3 Geotechnical
Examination
In connection
with the
construction
of
Hardstand/R
oad Inside
Dock Area,
Haldia Dock
Complex,
Haldia.
Manager (I &
CF)
Kolkata Port
Trust,
Haldia Dock
Complex,
Haldia
11.74 15.05.
15
06.08.
15
4 Geotechnical
Investigation
for Rail based
Mass Transit
system in
Kanpur. (Uttar
Pradesh)
Joint General
Manager/GT,
RITES Ltd,
RITES
Gurgaon
8.53 01.06.
15
31.07.
15
5 Geotechnical
Investigation
at various
locations on
open land for
proposed
Jawaharpura
m Housing
Scheme,
Kalyanpur,
Kanpur.
Executive
Engineer
Zone-II,
Kanpur
Development
Authority,
Kanpur
1.8 22.04.
15
12.06.
15
18
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Descriptio
n of the
actual
services
provided
by the key
person
Date
of
start
Date
of
comp.
Major project study completed
6 Geotechnical
Investigation
for proposed
ROB in lieu
of LC No.
120B,
Aligarh-
Khurja
section.
M/s. Biharilal
Menghani
WZ-13,2nd,
Floor, Bindra
Market, Sant
Pura, Delhi.
1.98 10.01.
15
18.02.
15
7 GT work at
various
location ie.
Sahjahanpur,
Muzaffarnagar
, Pilibhit,
Aligarh, &
Jaunpur at
Uttar Pradesh
for proposed
MCH projects
under NRHM
rural health
mission
scheme.
Chief General
Manager (P D
& E), H.S.C.C
(India) Ltd.
Corporate
Office: E-6 (A),
Sector-1,
Noida (U.P.)-
201 301
ed
5.57 5.08.1
4
30.09.
14
8 GT
Investigation
of ROBs in
lieu of L-Xing
and RUBs in
Ambala-
Ludhiyana
section.
Office of the
Dy. Chief
Engineer/
Const-II
Northern
Railways,
Chandigarh.
4.47 25.09.
14
15.11.
2014
19
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Descriptio
n of the
actual
services
provided
by the key
person
Date
of
start
Date
of
comp.
Major project study completed
9 Soil
exploration for
rehabilitation
of old sewer
line under
Delhi Jal
Board.
TTI Consulting
Engineers
(India) Pvt.
Ltd., DJB
Pumping
StationComple
x, Opp. Azad
Bhawan, ITO,
New Delhi.
5.00 25.06.
13
18.08.
13
10 GT work on
Plots -8,
Daryaganj,
Delhi for
proposed
construction
of multi
storied
building.
Execution
Engineer,
Engg, Deptt.
LIC of India,
25-KG, Marg,
New Delhi
2.35 18.12.
12
20.12.
12 It includes
evaluation
of safe
bearing
capacity
for Raft
foundation
.
11 GT work at
Different
locations at
Barauni
Refinery &
Barauni
Refinery
Township,
Barauni
Bengusarai,
Bihar.
Sr. Manager,
Contract Cell,
Refinery
Division,
IOCL,
Barauni,
Bengusarai,
Bihar.
6.45 1509.
12
20.11.
12
20
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Descriptio
n of the
actual
services
provided
by the key
person
Date
of
start
Date
of
comp.
Major project study completed
12 Geo Technical
Investigation
for Elevated
Metro at
Jaipur, Raj.
DSCC Ltd.
Site Office: 55-
Mansarowar,
Jaipur,
Rajasthan
13.6 27.01.
11
06.06.
11
13 Soil
Investigation
for
redevelopme
nt of steel
processing
unit (SPU) at
Jagdishpur,
Distt.
Sultanpur,U.P
DGM (MM-
Proj.) Steel
Authority of
India Ltd.,
Rourkela Steel
Plant,
Rourkela.
8.54 22.01.
10
05.06.
10
14 Sub Soil
Investigation
for
determination
bearing
capacity for
various multi
spanning
flyover, grade
seperator,
ROBs, RUBs
in lieu of
doubling of
track at
Sakurbasti.
Dy. Chief
Engineer/
const.
Northern
Railway,
Sakurbasti,
Delhi-56
5.04 23.10.
09
12.01.
10
21
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of work
completion
Description of
the actual
services
provided by
the key person Date
of
start
Date of
comp.
Major project study IN Hand
1 Geotechnical
Investigation
between km
979 to 1063
for 3rd line
between Bina-
Katni
sections. The
scope include
Study of sub
stratum at
different
chainages/loc
ation
Deputy
Chief
Engineer,
West
Central
Railway-
Habibganj
Bhopal.
24.9
9
29.09.
16
In
Progres
s
Study of under
stratum
property and
required data
for
computation
of SBC for
foundation for
proposed LHS,
under pass,
Minor or Major
bridges for
tripling of rail
infrastructure
in state of
M.P.
2 GT work for
preparation of
DPR for
removing
bottleneck
point of Kone
Expressway.b
y
GGM (HW)
RITES LTD.
56 C. R.
Avenue,
4th; Floor,
Kolkata-700
012
20.1
3
23.06.
17
In
Progres
s
Preparation of
GT report
comprising of
ROB/RUB,
Flyover and
integrated
Traffic
Circulation
Plan for
Santragachi
Rly Stn. &
Santragachi
Bus Terminus
from Kona
Expressway.
22
1 Proposed position Geo-Technical Engineer
2 Name Rajiv Ranjan
3 Contract address 6159, Sector B , Pocket-8,
Vasant Kunj, New Delhi
4 Date of Borth 06.08.1965
5 Nationality Indian
6 Educational qualification B. Sc Geology, M. Sc Geology
7 Other Training Nil
8 Language & degree or
proficiency
Speaking Reading
Writing
English Good Excellent
Excellent
Hindi Excellent Good Good
9 Membership of professional
societies
Nil
10 Countries of work
Experience
India
11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)
12 Years with the Firm 10 Years
13 Employment record
1. Name of Employer
2. Position held
3. Nature of duties
M/s. Techpro Engineers Pvt. Ltd.
Geologist
Geological Mapping.
23
14 Overall professional
experience in highway/ traffic
& transportation/ bridge
engineering or in related field
(in years)
12
15 Related work Experience (in
Years)
10
16 Detail of work Experience As under
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of work
completion
Description of
the actual
services
provided by the
key person Date
of
start
Date
of
comp.
1 Geo-Technical
Investigation
work for
Granulated
Single Super
Phosphate
project at
FAGMIL,
Chittorgarh,
Raj.
Projects &
Developmen
t India Ltd,
PDILBhawa
n,A-14,
Sector-1
Noida-201
301,Gauta
m Budh
Nagar, (UP).
3.61 22.04.
16
30.11.
16 Involving in
field
operations,
monitoring
sample
collection,
Preservations,
testing at lab.
And
compilation of
data.
Major project study
completed
2 Geotechnical
Investigation
for 10MW,
Solar Power
Plant at
Kadri,
Anantapur
Distt.;
Andhraprades
h.
Bharat
Heavy
Electronics
Ltd. EDN,
Mysore
Road,
Bangalore.
8.82 25.05.
15
31.07.
15
24
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of work
completion
Description of
the actual
services
provided by
the key person Date
of
start
Date of
comp.
3 Geotechnical
investigation
at
Chandrabagh
a bridge of
125km new
Borad Gauge
rail link
between
Rishikesh
and
Karanprayag
in the stage of
UK.
Dy. General
Manager
Rail Vikas
Nigam,
Block-04,
Rishilok,
GMVN,
Mini-Ki-
Reti,
Rishikesh
3.79 25.09.
15
15.12.1
5
Major project study IN Hand
4 GT work of
ROBs in lieu
of L-Xing
(139,141,159,
167) and
RUBs in lieu
of 5 Nos. L-
Xing(142,146,
148,164 &
166) on
Ambala-
Ludhiyana
section.
Office of the
Dy. Chief
Engineer/
Const-II
Northern
Railways,
Chandigarh
.
4.47 25.09.
14
15.11.1
4
25
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of
work
completion
Description of
the actual
services
provided by the
key person Date
of
start
Date
of
comp.
Major project study IN Hand
5 Geotechnical
Investigation
for proposed
Rural Self
Employment
Training
Institute at
various rural
area in state
of Bihar.
Executive
Engineer,
Engg.
Deptt.
North
Central
Zonal
Office, MG
Road,
Kanpur
11.2
2
28.06.
13
15.08.
13
6 Geotechnical
investigation
for at NTPC,
Unchahar,
Raebareli in
state of Uttar
Pradesh.
Manager
civil,
CV/PV,
BHEL,
Electronic
Division,
Mysore
Road,
Bangalore-
4.34 24.05.
13
10.07.
13
7 Soil
Investigation
work for
installation of
Non Recovery-
Heat Recovery
(NR-HR) type
Coke Oven
Battery at
Nandini
Mines, Bhilai.
Dy. GM I/c
(Project
Contract
Cell-NTK,
Steel
Authority of
India Ltd.,
Bhilai Steel
Plant,
Bhilai,
5.84 08.11.
12
17.07.
12
26
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
consul
tancy
work
(Lakhs
)
Period of
work
completio
n
Descriptio
n of the
actual
services
provided
by the key
person Date
of
start
Date
of
comp.
Major project study IN Hand
8 Geotechnical
Investigation at
Different
locations at
Barauni
Refinery &
Barauni
Refinery
Township,
Barauni, Bihar
Sr. Manager,
Contract Cell,
Refinery
Division, IOCL,
Barauni,
Bengusarai,
Bihar.
6.45 15.09
.12
20.11.
12
9 Carrying out
Soil
Investigation
work for the
proposed REC
world HQ
building at
Gurgaon/
TCIL Bhawan,
Greater
Kailesh-I,
New Delhi-110
048
1.25 22.08.
2011
18.10.2
011
10 GT work of the
Rocky/ Hard
strata at
shallow
parches
between
Gazipur to
Varanasi in
National
Waterway No.-
1 for
Inlandwaterway
Authority of
India,
Ministry of
Shipping,5th;
Floor,
Biscomaun
Bhawan, West
Gandhi
Maidan, Patna
7.50 08.04.
10
20.07.2
010
the
purpose of
investigatio
n is to
study of
hard
patches &
removal of
same
through
under
water
blasting.
27
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of
work
completion
Description of
the actual
services
provided by
the key person Date
of
start
Date of
comp.
Major project study IN Hand
11 Geo Technical
Investigation
for
construction
of cooling
tower and
other ancillary
structure in
lieu of
extension of
Korba
Thermal
Power Plant.
GAMMON
INDIA LTD,
Gammon
House, Veer
Sarvarkar
Marg,
Prabhadevi,
Mumbai-
400025
5.23 12.01.
2010
25.04.2
010
12 Geotechnical
investigation
for ROB, RUB,
RE Walls for
rehabilitation
of existing two
lanes from
Km. 208.00 to
251.700 (pkg-
6)on Ayodhya-
Gorakhpur
section of NH-
28 in UP
B. Seenaiah
& Company
(Projects)
Ltd.
Km.:
229.500 on
NH-28,
Village:
Gaurapur,
Post:
Atraura,
Khalilabad-
272175,
Distt.: Sant
Kabir
Nagar.
6.0 15.12.
2007
10.02.2
008
28
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of work
completion
Description of
the actual
services
provided by
the key person Date
of
start
Date of
comp.
Major project study IN Hand
13 Geo Technical
Investigation
for
construction
of cooling
tower and
other ancillary
structure in
lieu of
extension of
Korba
Thermal
Power Plant.
GAMMON
INDIA LTD,
Gammon
House, Veer
Sarvarkar
Marg,
Prabhadevi,
Mumbai-
400025
5.23 12.01.
10
25.04.1
0
14 Geotechnical
investigation
for ROB, RUB,
RE Walls for
rehabilitation
of existing two
lanes from
Km. 208.00 to
251.700 (pkg-
6)on Ayodhya-
Gorakhpur
section of NH-
28 in UP
B. Seenaiah
& Company
(Projects)
Ltd.
Km.:
229.500 on
NH-28,
Village:
Gaurapur,
Post:
Atraura,
Khalilabad-
272175,
Distt.: Sant
Kabir
Nagar.
6.0 15.12.
07
10.02.0
8
29
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of work
completion
Description of
the actual
services
provided by
the key person Date
of
start
Date of
comp.
Major project study IN Hand
1 Topographical
Survey and
Soil Testing &
Investigation
for 10MW
Solar
Photovoltaic
Power Plant at
Santhaldih,
Purulia, W.B.
for WBSEDCL
AGM
(SC&PV-
Engg),
BHEL-EDN,
Mysore
Road,
Bangalore.
2.24 09.06.
17
In
Progres
s
Project co-
ordination,
monitoring of
drilling &
sampling as
per TS, sample
testing and
data
compilation
for
computation
of safe
founding
system.
2 Carrying out
the Geo
Technical
Investigation
and
recommendati
on of Bridge
foundation
type for the
Major Railway
Bridges in
between Bina-
Jhansi.
Director,
Kristi
Engineering
Services
Pvt. Ltd.
2nd Floor,
Divine
Palace,
Bimal Sinha
Sarani,
Hakimpara,
Siliguri-
734001
9.12 15.05 In
Progres
s
Involving in
laboratory
testing on soil
and rock
samples,
compilation of
data and
preparation
laboratory test
summary.
30
1 Proposed position Geo-Technical Engineer
2 Name Dr. Lok Priya Srivastava
3 Contract address 96-C, Shivpur Shahbajgang,
P.O: Jangal Shalikram,
Gorakhpur (Uttar Pradesh),
4 Date of Borth 05.01.1985
5 Nationality Indian
6 Educational qualification B. Tech. (Civil), M. Tech. (Geo-tech), Ph.D.
7 Other Training Nil
8 Language & degree or
proficiency
Speaking Reading
Writing
English Good Excellent
Excellent
Hindi Excellent Excellent Good
9 Membership of professional
societies
Nil
10 Countries of work
Experience
India
11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)
12 Years with the Firm 10 Years
13 Employment record
1. Name of Employer
2. Position held
3. Nature of duties
M/s. Techpro Engineers Pvt. Ltd.
General Manager
Geotechnical Engineer
31
14 Overall professional
experience in highway/ traffic
& transportation/ bridge
engineering or in related field
(in years)
05
15 Related work Experience (in
Years)
10
16 Detail of work Experience As under Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Description
of the actual
services
provided by
the key
person
Date
of
start
Date
of
comp.
Major project study completed
1 GT for
proposed
Rural Self
Employment
Training
Institute at
various rural
area in state
of Bihar.
Executive
Engineer,
Engg. Deptt.
North
Central Zonal
Office, MG
Road,
Kanpur
11.22 28.06.
13
15.08.
13
2 GT work for
proposed
multi storied
building
under
Ambedkar
puram Yojna
No. 03,
Sector-E at
Plot No. 6 & 7,
Ambedkarpur
am, Kanpur.
E.E. Nirman
Khand, Uttar
Pradesh Avas
& Vikas
Parisad,
Office
Complex,
Keshavpura
m,
Kalyanpur,
Kanpur
2.10 15.06.
13
11.07.
13
32
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Description
of the
actual
services
provided by
the key
person
Date
of
start
Date
of
comp.
Major project study IN Hand
3 Geotechnical
Investigation
at Different
locations at
Barauni
Refinery &
Barauni
Refinery
Township,
Barauni,
Bihar
Sr. Manager,
Contract Cell,
Refinery
Division,
IOCL,
Barauni,
Bengusarai,
Bihar.
6.45 15.09.
12
20.11.
12
4 Soil
Investigation
work of plot
for
Construction
of DO/ BO,
OQ & GH at
Satna, M.P.
Dy.C.E.,
Engg. Deptt.
Central Zonal
Office, LIC of
India Ltd.,
Hoshangabad
Road,
Bhopal,
1.45 28.01.
12
10.04.
12
5 Carrying out
Soil
Investigation
work for the
proposed REC
world HQ
building at
Gurgaon
(Haryana)
TCIL
Bhawan,
Greater
Kailesh-I,
New Delhi-
110 048
1.25 22.08.
11
18.10.
11
33
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consulta
ncy
work
(Lakhs)
Period of
work
completion
Description
of the
actual
services
provided by
the key
person
Date
of
start
Date
of
comp.
Major project study IN Hand
6 GT work at
project area
for
construction
of 6 MGD new
Sewage
Pumping
Station and
laying of
gravity sewer
etc of Delhi
Jal Board.
Tech.
Director
(Water &
Urban
Development)
AECOM India
Pvt. Ltd. 5th
Floor,
Building
No.10B, DLF
Cyber City,
DLF PhaseII
Gurgaon
2.50 25.08
.11
09.10.
11
7 GT work of
the Rocky/
Hard strata at
shallow
parches
between
Gazipur to
Varanasi in
N.W. No.-1
Inland
Waterways
Authority of
India,5th;
Floor,
Biscomaun
Bhawan,
West Gandhi
Maidan,
Patna
7.50 08.04
.10
20.07.
10
Purpose of
investigatio
n is to
study of
hard
deposits at
bottom on
& removal
of same
through
under water
blasting.
1 GT work for
Development
of Korba
West Thermal
Power Project
at Chattisgarh
State in Korba
Distt.
M/s. Indu
Projects Ltd.
Reg. Off;
1009, 13th;
Phase, KPHB
Colony,
Hyderabad.
13.28 19.01
.10
08.03.
10
34
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of work
completion
Description of
the actual
services
provided by
the key person Date
of
start
Date of
comp.
Major project study IN Hand
2 GT work for
Development
of four-lanes
with paved
side shoulders
of Shahkot-
Moga section
of NH-71 (New
NH No. 52)
from km
44.600 of NH-
71 to km
77.200 in the
state of
Punjab under
NHDP-IV.
Infinite Civil
Solutions
Pvt. Ltd.,
Infinite
House, F.P.-
25, Near
Aditya
Elegance &
Railway
Track,
CIMS
Hospital
Road, Sola,
Ahmedabad
2.27 21.04.
16
35
1 Proposed position Geo-Technical Engineer
2 Name Mr. Yagyadutta Mishra
3 Contract address 96-C, Shivpur Shahbajgang,
P.O: Jangal Shalikram,
Gorakhpur (Uttar Pradesh),
yagyaduttatechpro@gmail.com,
4 Date of Borth 13.07.1989
5 Nationality Indian
6 Educational qualification B. Tech. (Civil),
7 Other Training Nil
8 Language & degree or
proficiency
Speaking Reading
Writing
English Good Excellent
Excellent
Hindi Excellent Excellent Good
9 Membership of professional
societies
Nil
10 Countries of work
Experience
India
11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)
12 Years with the Firm 03 Years
13 Employment record
1. Name of Employer
2. Position held
3. Nature of duties
M/s. Techpro Engineers Pvt. Ltd.
Project Manager
Soil Exploration Topographical study of
terrain.
36
14 Overall professional
experience in highway/ traffic
& transportation/ bridge
engineering or in related field
(in years)
03
15 Related work Experience (in
Years)
04
16 Detail of work Experience As under
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Description
of the
actual
services
provided by
the key
person
Date
of
start
Date
of
comp.
Major project study completed
1 Soil
Investigation
at for
proposed
NalandaUnive
rsity, Rajgir,
Bihar
Nalanda
University,
Rajgir,
District
Nalanda,
Bihar
2.78 10.10.
15
25.11.
15
2 Sub Soil
Investigation
for RUBs work
in Etawah-
Mainpuri
section,U.P.
Dy. C.E.
(Const.) North
Central RLys,
Opp. Kanpur,
U.P.
1.97 05.02.
15
15.03.
15
3 GT work for
the proposed
Commercial/R
esidential
development
of 239.64 acre
land of CPWD
at Ghitorni,
Delhi.
NBCC, Real
Estate Div.,
NBCC
Bhawan,
Lodhi Road
New Delhi-
110 003
2.88 05.11.
13
09.12.
13
37
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of work
completion
Description
of the
actual
services
provided by
the key
person
Date
of
start
Date
of
comp.
Major project study completed
4 GT work of
Elevated
Viaduct & Two
Elevated
Stations Viz
Johri Enclave
& Shiv Vihar
Stations from
chainage
57357.623M
of Line7
Mukundpur-
Yamina Vihar,
Delhi.
Globe Civil
Projects Ltd.,
6.6 15.06.
13
11.10.
13
5 Geotechnical
investigation
for at NTPC,
Unchahar,
Raebareli in
state of Uttar
Pradesh.
Manager civil,
CV/PV, BHEL,
Electronic
Division,
Mysore Road,
Bangalore-560
026
4.34 24.05.
13
10.07.
13
Geotechnical
Investigation
at Different
locations at
Barauni
Refinery
Township.
Sr. Manager,
Contract Cell,
IOCL, Barauni
Refinery,
Bengusarai
Distt. Bihar.
6.45 03.10.
12
02.12.
12
38
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of work
completion
Description of
the actual
services
provided by
the key person Date
of
start
Date of
comp.
Major project study In Hand
1 Soil
Investigation
and Survey of
a Land Parcle
of DDA at
Sanjay Lake
Park,
Trilokpuri for
development
by NBCC Ltd.
Chief
General
Manager
(RE)
NBCC
Bhawan,
Lodhi Road,
New Delhi-
2.99 15.04.
16
2 GT work for
Preparation of
Detailed
Project Report
(DPR) for
removing
bottleneck
point of Kone
Expressway.
by
Dy. G. M.
(HW), RITES
Ltd. Metro
Railway
Bld. 4th;
Floor 56,
C.R avenue,
Kolkata.
20.1
3
23.06.
17 The work
consist of
Construction
of new
ROB/RUB,
Flyover and
integrated
Traffic
Circulation
Plan for
Santragachi
Railway
Station and
Santragachi
Bus Terminus
from Kona
Expressway.
39
1 Proposed position Geologist
2 Name Mr. Prashant Mukharjee
3 Contract address B-3/2, Tata Steel Apartment
Beta-II , Opp. Kasana Police
Station Greater Noida,
Gautam Budha Nagar
Email:vsprashant@rediffmail.com
4 Date of Borth 21.12.1972
5 Nationality Indian
6 Educational
qualification
B.Sc. (Civil Engg), M. Tech.(Geotech.), Ph D.
(Geotech)
7 Other Training Nil
8 Language & degree or
proficiency
Speaking Reading Writing
English Excellent Excellent Excellent
Hindi Excellent Good Good
9 Membership of
professional societies
Nil
10 Countries of work
Experience
India
11 Name of firm where work M/s. Techpro Engineers Pvt. Ltd. (Full Time)
12 Years with the Firm 01 Years
13 Employment record
1. Name of Employer
2. Position held
3. Nature of duties
M/s. Techpro Engineers Pvt. Ltd.
Geotechnical Engineer
Compilation of test results and preparation of
report.
40
14 Overall professional
experience in highway/ traffic
& transportation/ bridge
engineering or in related field
(in years)
05
15 Related work Experience (in
Years)
10
16 Detail of work Experience As under
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost of
consult
ancy
work
(Lakhs)
Period of
work
completion
Descriptio
n of the
actual
services
provided
by the key
person
Date
of
start
Date
of
comp.
Major project study completed
1 Geotechnical
Investigation
for 10MW,
Solar Power
Plant at Kadri,
Anantapur
Distt.; Andhra
pradesh.
Bharat Heavy
Electronics Ltd.
EDN, Mysore
Road,
Bangalore.
8.82 25.05
.15
31.07.
15
2 Geotechnical
investigation at
Chandrabagha
bridge of
125km new
Borad Gauge
rail link
between
Rishikesh and
Karanprayag in
the stage of
Uttarakhand.
Dy. General
Manager Rail
Vikas Nigam,
Block-04,
Rishilok,
GMVN, Mini-Ki-
Reti, Rishikesh
3.79 25.09
.15
15.12.
15
41
Ite
m
Sr
.
No
.
Brief
Description of
project study
Name of the
client
Cost
of
cons
ultan
cy
work
(Lak
hs)
Period of work
completion
Description of
the actual
services
provided by
the key person Date
of
start
Date of
comp.
Major project study in Hand
1 GT work for
proposed
Lingraj Silo
Connectivity
with NTPC
Cpative Line
at Talcher
Coalfield.
Jt. General
Manager
RITES Ltd.
RPO,
Bhubanesh
war.
2.54 25.11.
16
In
Progres
s
2 Geotechnical
Investigation
between km
979 to 1063
for 3rd line
between Bina-
Katni
sections. The
scope include
Study of sub
stratum at
different
chainages/loc
ation
Deputy
Chief
Engineer,
West
Central
Railway-
Habibganj
Bhopal.
25.0 29.09.
16
In
Progres
s
Involving in
laboratory test
on soil & rock
cores as per
assign
technical
specification
and
compilation of
test results for
evaluation of
SBC as per
designing
work for
bridges.
42
RELEVANT SERVICES CARRIED OUT BY THE FIRM WHICH
ILLUSTRATES THEIR BEST QUALIFICATIONS DURING LAST 5
YEAR:
Project-I
Project Name:
Sub Soil Investigation for
section AB (KM 15.724) for
subgrade, High Embankment,
under passes & material
sampling and testing of total
length of 43KM of Varanasi Ring
Road.
Country: India
Project location
within country:
Varanasi
Dist. Varanasi
State- Uttar
Pradesh
Date of Agreement:
14.06.2015
Name and address of
client:
Associate Director,
JACOBS CES
Plot No. 184, Platinum
Tower, Udyog Vihar,
Phase-1, Gurgaon
122016
Professional staff
provided:
a) No. of staff- 10
b) No. of
man/months-
25/3.5
Start date
(month/year):
02.07.2015
Completion
date
(month/year):
10.08.2015
Approx. value of consultancy services:
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted] Rs.7, 35,375.00 excluding ST.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): 02
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Sushil Tripathi Dy.
GM (Proj.)- Coordination, execution & Planing.( Functions performed by the
associated firm (s) to be given separately) 43
Project-I
Narrative Description of Project: Geo-Technical investigation in lieu of new
Ring road at Varanasi for preparation of detailed project report.
Total length of the Project Highway
(in Km): 43
Carriageway Width (in m): NA
Length of Bridge (in m) (if
applicable): NA
Span configuration of bridge (in m):
NA
Detail description of Actual Services Provided by the firm under different
categories:
(Please select from the following)
• Ground Surveys & Investigation……………………………………………………Yes
• Material Surveys…………………………………………….………………………….Yes
• Geo-tech Investigation for Bridges……………………………………………….…Yes
• Geo-tech investigation for high embankments…….…..…………………...…..Yes
• Preparation of designs for road pavement………………………………………...No
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods…....................................................................................No
• Investigations for bridge foundations resting on rock by drilling through
rock…………………………………………………………….………………………..….No
44
Project-II
Project Name:
Geotechnical Investigation for
Rail based Mass Transit system
in Kanpur. (Uttar Pradesh).
Country: India
Project location
within country:
Kanpur
Dist. Kanpur
State- Uttar
Pradesh
Date of Agreement:
27.05.2015
Name and address of
client:
Joint General
Manager/GT,
RITES Ltd,
RITES Bhawan, No. 1,
Sector-29, Gurgaon-
122001
Professional staff
provided:
a) No. of staff- 15
b) No. of
man/months-
15/2
Start date
(month/year):
01.06.2015
Completion
date
(month/year):
31.07.2015
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted]Rs.8, 53,000.00 excluding service
tax.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
: Nil
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): 02
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Sushil Tripathi Dy.
GM (Proj.)- Coordination, execution & Planing.( Functions performed by the
associated firm (s) to be given separately) 45
Project-II
Narrative Description of Project: Geo-Technical investigation in proposed
alignment for Merto stations, under passes, tunnels and Depoe for preparation
of feasibility report for DPR.
Total length of the Project Highway
(in Km): 47
Carriageway Width (in m): NA
Length of Bridge (in m) (if
applicable): NA
Span configuration of bridge (in m):
NA
• Ground Surveys & Investigation….……………………………………….……..…Yes
• Material
Surveys……………………………………………………….……………………..….…….No
• Geo-tech Investigation for Bridges……………………………………..……..……Yes
• Geo-tech investigation for high embankments……………..………………..…..No
• Preparation of designs for road pavement………………………………………....No
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods…………………………………………………………….……….…No
• Investigations for bridge foundations resting on rock by drilling through
rock……………………………………………………………….……………………..….No
46
Project-III
Project Name:
Geotechnical investigations at
Chandrabagha bridge of 125 km
new Broad Gauge rail link
between Rishikesh and
Karanprayag in the state of
Uttarakhand, India.
Country: India
Project location
within country:
Rishikesh
Dist. Rishikesh
State- Uttar
Pradesh
Date of Agreement:
11.09.2015
Name and address of
client:
DGM/Project-1,
Rail Vikas Nigam Ltd,
Rishikesh.-249137
Professional staff
provided:
a) No. of staff- 10
b) No. of
man/months-
10/1.5
Start date
(month/year):
02.07.2015
Completion
date
(month/year):
31.12.2015
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted] Rs.4, 32,562.00 excluding service
tax.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
: Nil
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): 1.5
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Arvind K. Garg
M.D.- Coordination, Execution,
( Functions performed by the associated firm (s) to be given separately)
47
Project-III
Narrative Description of Project: Geo-Technical investigation in proposed
alignment for Merto stations, under passes, tunnels and Depoe for preparation
of feasibility report for DPR.
Total length of the Project Highway
(in Km): NA
Carriageway Width (in m): NA
Length of Bridge (in m) (if
applicable): NA
Span configuration of bridge (in m):
NA
• Ground Surveys &
Investigation………………………………………………………………………..………Yes
• Material
Surveys……………………………………..………………….……………………….…….No
• Geo-tech Investigation for Bridges……………………………….…………..……Yes
• Geo-tech investigation for high embankments…………….……………….…..No
• Preparation of designs for road pavement…………….………………………....No
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods…………………………………………………………………….…Yes
• Investigations for bridge foundations resting on rock by drilling through
rock……………………………………………………………………………………..….Yes
48
Project-IV
Project Name:
Topographical Survey and Soil
Testing & Investigation for
50MW PV Solar Project at
Kadiri, Dist. Anantapur, Andhra
Pradesh.
Country: India
Project location
within country:
Kadri,
Dist.- Anantapur
State.-
Andhrapradesh
Date of Agreement:
13.05.2016
Name and address of
client:
Manager (SC&PV-PVSS),
BHEL, Electronics
Division,
Bangalore-560026
Professional staff
provided:
a) No. of staff- 15
b) No. of
man/months-
15/2.5
Start date
(month/year):
03.06.2015
Completion
date
(month/year):
23.06.2015
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted] Rs. 8,82,363.00 including service
tax.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
: Nil
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): Nil
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.
GM (Proj.)- Coordination, Execution, ( Functions performed by the associated
firm (s) to be given separately)
49
Project-IV
Narrative Description of Project: Topographical Survey and Soil Testing &
Investigation for 50MW PV Solar Project.
Total length of the Project Highway
(in Km): NA
Carriageway Width (in m): NA
Length of Bridge (in m) (if
applicable): NA
Span configuration of bridge (in m):
NA
• Ground Surveys & Investigat…………………..……………………………….……Yes
• Material
Surveys………………………………………………………….…………………………….No
• Geo-tech Investigation for Bridges…………………………..………………….……No
• Geo-tech investigation for high embankments……………………………..……..No
• Preparation of designs for road pavement…………………..……………………...No
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods…………………………………………………………………….…No
• Investigations for bridge foundations resting on rock by drilling through
rock………………………………………………………… .……………….…………. No
50
Project-V
Project Name: Geotechnical
Examination In connection with
the construction of
Hardstand/Road Inside Dock
Area, Haldia Dock Complex,
Haldia.
Country: India
Project location
within country:
Dock Complex,
Haldia Port
Dist. Haldia
State- West Bengal
Date of Agreement:
07.05.2015
Name and address of
client:
Manager (I & CF)
Kolkata Port Trust,
Haldia Dock Complex,
Haldia
Professional staff
provided:
a) No. of staff- 12
b) No. of
man/months-
20/4
Start date
(month/year):
03.06.2015
Completion
date
(month/year):
06.08.2015
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted] Rs.11,74,270.23 Excluding service
tax.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
: Nil
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): Nil
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.
GM (Proj.)- Coordination, Execution, ( Functions performed by the associated
firm (s) to be given separately)
51
Project-V
Narrative Description of Project: Geo-Technical Examination” is to be carried
out at different locations of proposed hardstand/road inside the dock area at
Haldia Dock Complex, Haldia, with an objective of finding out the relevant soil
parameters which will be required for design of suitable structures e.g.
pavements, hardstand etc.
Total length of the Project Highway
(in Km): NA
Carriageway Width (in m): NA
Length of Bridge (in m) (if
applicable): NA
Span configuration of bridge (in m):
NA
• Ground Surveys & Investigation….………………………………………….……Yes
• Material Surveys………………………..……………….…………………………….No
• Geo-tech Investigation for Bridges…………………………..……………….……No
• Geo-tech investigation for high embankments…………………………..……..No
• Preparation of designs for road pavement……………….……………………...Yes
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods…………………………………………………………………….…No
• Investigations for bridge foundations resting on rock by drilling through
rock…………………………………………………………………………….…………. No
52
Project-VI
Project Name: Sub Soil
Investigation, Plate Load Test,
design and drawing of bridge for
Road over Bridge in lieu of Level
crossing Nos. 5-C, 11-C & 16-C
on Meerut – Khurja section &
for 45 numbers Road Under
Bridge on Meerut – Khurja
section.
Country: India
Project location
within country:
Meerut & Khurja
Dist. Meerut
State- Uttar
Pradesh
Date of Agreement:
12.01.2016
Name and address of
client:
Dy. Chief
Engineer/Const,
NDWCS, Northern
Railway, New Delhi.
Professional staff
provided:
a) No. of staff- 04
b) No. of
man/months-
12/2.5
Start date
(month/year):
25.01.2016
Completion
date
(month/year):
15.03.2016
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted] Rs.8, 90,550.00 including service
tax.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
: Nil
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): Nil
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.
GM (Proj.)- Coordination, Execution, ( Functions performed by the associated
firm (s) to be given separately)
53
Project-VI
Narrative Description of Project: Geo-Technical investigation at various level
crossing for construction of RUB or ROB from Meerut to Khurja rail line.
Total length of the Project Highway
(in Km): 70
Carriageway Width (in m): NA
Length of Bridge (in m) (if
applicable): NA
Span configuration of bridge (in m):
5 to 8
• Ground Surveys & Investigation……………………………………………….……Yes
• Material
Surveys………………….…………………………………….…………………………….No
• Geo-tech Investigation for Bridges……………..…………………………….……Yes
• Geo-tech investigation for high embankment………..…………………..……..No
• Preparation of designs for road pavement………………..……………………...No
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods………………………………………………………………….….…No
• Investigations for bridge foundations resting on rock by drilling through
rock…………………………………………………………….……………….…………. No
54
Project-VII
Project Name: Soil
Investigation work for proposed
ROB at Raebareli to Jaunpur
section (Km 0+000 to Km.
166.400) of NH-231 Country: India
Project location
within country:
Raebareli
Dist. Raebareli
State- Uttar
Pradesh
Date of Agreement:
25.08.2014
Name and address of
client:
Arvind Techno
Engineers Pvt. Ltd. 3rd
Floor, A-22Green Park
(Main), Aurobindo Marg,
New Delhi-110016
Professional staff
provided:
a) No. of staff- 04
b) No. of
man/months-
12/2.5
Start date
(month/year):
05.09.2014
Completion
date
(month/year):
05.09.2014
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted] Rs.6, 95,126.00 including service
tax.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
: Nil
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): Nil
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.
GM (Proj.)- Coordination, Execution, ( Functions performed by the associated
firm (s) to be given separately)
55
Project-VII
Narrative Description of Project: Geo-Technical investigation in connection
with construction of Rail Over Bridge at NH231, at Jaunpur, Uttar Pradesh
Total length of the Project Highway
(in Km): NA
Carriageway Width (in m): NA
Length of Bridge (in m) (if
applicable): NA
Span configuration of bridge (in m):
5 to 8
• Ground Surveys & Investigation……………………………………………….……Yes
• Material
Surveys………………………………………………………….…………………………….No
• Geo-tech Investigation for Bridges…………………………………………….……Yes
• Geo-tech investigation for high embankments……………..……………..……..No
• Preparation of designs for road pavement……………….………………………...No
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods……………………………………………………………….…….…No
• Investigations for bridge foundations resting on rock by drilling through
rock…………………………………………………………….……………….…………. No
56
Project-VIII
Project Name: Geo-technical
investigation work of 50
Strategic locations along Sewer
Alignment at New Delhi. Country: India
Project location
within country:
New Delhi
Date of Agreement:
25.08.2014
Name and address of
client:
Executive Director
DJB Pumping Station
Complex, opposite Azad
Bhawan (In gate), ITO,
New Delhi-110002
Ph. No. 011-23378736
Professional staff
provided:
a) No. of staff- 08
b) No. of
man/months-
25/3.5
Start date
(month/year):
05.09.2014
Completion
date
(month/year):
05.09.2014
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted] Rs.5, 00,000.00 including service
tax.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
: Nil
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): Nil
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.
GM (Proj.)- Coordination, Execution, ( Functions performed by the associated
firm (s) to be given separately)
57
Project-VIII
Narrative Description of Project: Geo-Technical investigation in connection
with construction of Rail Over Bridge at NH231, at Jaunpur, Uttar Pradesh.
Total length of the Project Highway
(in Km): NA
Carriageway Width (in m): NA
Length of Bridge (in m) (if
applicable): NA
Span configuration of bridge (in m):
5 to 8
• Ground Surveys & Investigation…..………………………………………….……Yes
• Material
Surveys………………….…………………………………….…………………………….No
• Geo-tech Investigation for Bridges……………..…………………………….……No
• Geo-tech investigation for high embankments…………………………..……..No
• Preparation of designs for road pavement…………..…………………………...No
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods…………………………………………………………………….…No
• Investigations for bridge foundations resting on rock by drilling through
rock…………………………………………………………..……………….…………. No
58
Project-IX
Project Name:
Rehabilitation and up gradation
to four laning of Chhapra –
Hazipur section of NH- 19 from
Km. 188.68 to 209.94 in the
state of Bihar under NHDP – III
on annuity.
Country: India
Project location
within country:
Hazipur & Chhapra
State- Bihar
Date of Agreement:
11.06.2013
Name and address of
client:
General Manager, Proj.
Vijay Nirman Company
Pvt. Ltd.
Near Gandak bridge,
village Anandpura,
Hazipur Bihar
Professional staff
provided:
a) No. of staff- 08
b) No. of
man/months-
25/3.5
Start date
(month/year):
28.04.2010
Completion
date
(month/year):
28.06.2010
(cost as per Agreement in INR(Lakhs) [In
case of foreign currency, conversion factor as
on date of Agreement with proof shall be
submitted] Rs.3, 07,516.00 including service
tax.
Whether project was done alone or as a JV or in association with other
firm/ firms: No.
Name of Lead
partner in case
of
JV/association
: Nil
JV Share of the
firm in case of
JV: NA
No. of man-months of
professional staff
provided by associated
firm (s): Nil
Name of Lead
partner in
case of
JV/association: NA
Name of Senior staff involved and functions performed: Sushil Tripathi, Dy.
GM (Proj.)- Coordination, Execution, ( Functions performed by the associated
firm (s) to be given separately)
59
Project-VIII
Narrative Description of Project: Rehabilitation and up gradation to four
laning of Chhapra – Hazipur section of NH- 19 from Km. 188.68 to 209.94.
Total length of the Project Highway
(in Km): 65
Carriageway Width (in m): 09
Length of Bridge (in m) (if
applicable): 700
Span configuration of bridge (in m):
09
• Ground Surveys & Investigation..…………………………………………….……Yes
• Material
Surveys………………………….…………………………….…………………………….No
• Geo-tech Investigation for Bridges……………..…………………………….……Yes
• Geo-tech investigation for high embankments…………………………..……..No
• Preparation of designs for road pavement… …………………………………...Yes
• Preliminary investigation for bridge foundations resting on rock using geo-
physical methods…………………………………………………………………….…No
• Investigations for bridge foundations resting on rock by drilling through
rock…………………………………………………………………….…….…………. No
60
DETAILED INFORMATION OF TECHNICAL PERSONNEL
AVAILABLE WITH THE FIRM
Sl.
No.
Name Academic
Qualification
Degree(civil)
Year of
passing
No. of years
experience
in the field
of Highway/
Bridge Engg
Signature
of
respective
technical
personnel
1 Mr. Saurabh
Agarwal
B. Tech (civil)
M. Tech
(Mechanic & Fdn)
1991
1994 15 Years
2 Dr. Lok Priya
Srivastava
B. Tech (civil)
M. Tech
(GeoTech-Engg)
2007
2009 05 Years
3 Mr. Yagyadutta
Mishra B. Tech (Civil) 2012 03 Years
4 Arvind Kumar
Garg
B. Tech (civil)
M. Tech
(structure)
1991
1994 20 Years
5 Mr. Prashant
Kr. Yadav
B. Sc (Geology)
M. Sc (Geology)
2010
2013 02 Years
6 Mr. Prashant
Mukharjee
M. Tech (Civil)
Ph. D: Geotech)
2000
2015 05 Years
7 Mr. Nazrul
Qamer B. Tech (civil) 2015 02 Years
8 Mr. Abhijeet
Singh
B. Tech (civil)
B. Tech
(Structure)
2013
2016 02 Years
9 Mr. Sushil
Kumar Tripathi
Diploma civil
Engg. 1991 18 Years
10 Anoj Dhyani
Diploma civil
Engg. 1995 10 Years
11 Mr. Shivam
Mathur B. Tech (civil) 1910 02 Years
Signature of the authorized
Signatory of the firm 61
UNDERTAKING REGARDING NON-DEBARREMENT/
BLACKLISTING/DETAILS OF LITIGATION HISTORY
We hereby declare that we neither have been placed on any holiday list nor
black listed by Ministry of Road Transport & Highway Or by any Department
of any Government (State, Provincial, Federal or Central) or by any Public
Sector Organization in India or in any other country and that there is no
pending inquiry by organization on in any country against us, in respect of
corrupt or fraudulent practice(s).
It is understood that if this declaration is found to be false, in any particular,
Ministry of Road Transport & Highway, shall have the right to reject our/bid,
and if the bid has resulted in a contract, the contract is liable to be
terminated without prejudice to any other right or remedy (including black
listing or holiday listing) available to MORTH.
Place :
Signature of Company Authority:
Date :
Name of Signatory:
62
UNDERTAKING REGARDING AVAILABILITY
OF EQUIPMENTS MENTIONED IN
APPENDIX-A
This is to undertake that the total essential field and laboratory
equipment required for the works as per appendix-A are available with
M/s. Techpro Engineers Pvt. Ltd. For the project and details of such
equipment are mentioned in Field/ Laboratory Equipment Attachment
1&2.
Authorized Signatory
Techpro Engineers Pvt. Ltd.
63
� ANNUAL TURNOVER OF THE COMPANY
o 2012 - 2013 was Rs.59.80 lacs.
o 2013 - 2014 was Rs.111.59 lacs.
o 2014 – 2015 was Rs.384.00 lacs.
o 2015 – 2016 was Rs.171.12 lacs
o 2016 – 2017 was Rs. 184.64 lacs
� LABORATORY:
Our laboratory is situated at following address:-
131, 1st; Floor,
Patparganj Industrial Area,
Delhi-110092
64
SOIL INVESTIGATION
ROCK DRILLING
TESTING ON SOIL,ROCK SAMPLES
CHEMICAL TEST ON SOIL,WATER
SAMPLES
SEISMIC REFRACTION
TEST
CROSSHOLE, DOWNHOLE
SEISMIC&TOMOGRAPHY
GROUND PENETRATING RADARURVEYS
TOPOGRAPHY AND CONTOUR
SURVEYS
PILE FOUNDATION
HYDROGRAPHICAL
SURVEYS
GAS SERVICES
65
FIELD TESTING EQUIPMENTS
• Trailer mounted Rotary rigs-08
• Power operated winches for
percussion method drilling in
over burden soil.– 10 Nos.
• Manually operated Shell &
Auger drilling & sampling
equipment- 10sets.
• Plate load & K-value test setups
as per IS: 1888.
• Electric resistivity test setups – 4
nos.
• Dynamic Cone (DCPT) test
setups as per IS: 4968-1
• Static Cone (SCPT) test setup (1
no of 10T capacity)-as per
IS.2131-1981
• Field CBR test setups – 2 nos.
• In-situ Permeability test setups
(2 nos.)
• In-situ density test setups (core
cutter and sand replacement -2
• Water Content (Oven Dry Method) IS 2720 (Part 2): 1973 (RA 2010)
• Liquid Limit apparatus as per IS 2720 (Part 5): 1985 (RA 2010)
• Plastic Limit IS 2720 (Part 5): 1985 (RA 2010)
• Shrinkage Limit IS 2720 (Part 6): 1972 (RA 2011)
• Light Compaction IS 2720 (Part 7): 1980 (RA 2011)
• Direct Shear Test IS 2720 (Part 13): 1986 (RA 2011)
• California Bearing Ratio (CBR) IS 2720 (Part 16): 1987 (RA 2011)
• Permeability (By Falling Head) IS 2720 (Part 27): 1986 (RA 2011)
• Chemical test apparatus for soil and water samples
• Weighing machines(Manual & electronic)
• Sample Extractor
• CBR test apparatus
• Proctor test apparatus
• Apparatus for UCS and Point load test for rock core testing
• Sieve Analysis IS 2720 (Part 4): 1985 (RA 2010) Clause No. 3,4.3, & 5.2
66