optisurface.com Evolution of Landforming –1900s Dumpy & Stakes –1970s Laserplane –1990s Multiplane –2000s OptiSurface* *Patent Pending

Transcript of Graeme Cox BEng (Ag) PhD Dave Cox Farmer By. Evolution of Landforming We have been landforming...

Graeme Cox BEng (Ag) PhD

Dave Cox Farmer

By

optisurface.com

Evolution of Landforming

We have been landforming since agriculture began

optisurface.com

Evolution of Landforming – 1900s Dumpy & Stakes

– 1970s Laserplane

– 1990s Multiplane

– 2000s OptiSurface**Patent Pending

optisurface.com

Benefits of LandformingHigher Yields, Quality and Profit

through• Minimised water logging• Improve infiltration uniformity• Sooner trafficability • Improved crop establishment• Improved uniformity of crop maturity• Reduced weed problems

optisurface.com

OptiSurface Landforming

MUCH BETTER!!

…provides all of the benefits of traditional laser landforming only:

• Much cheaper (up to 80%)• Much less topsoil removal • Much faster

optisurface.com

Case Study C7

• Block: C7 Area: 92 Ha

• Location: DAVCO Farming, Burdekin

• Row Cropping (sugar cane)

• Lateral Move Irrigation

optisurface.com

Existing Topography

32.0

32.5

33.0

33.5

34.0

34.5

35.0

35.5

36.0

Ele

vatio

n (m

)

35.5-36.035.0-35.534.5-35.034.0-34.533.5-34.033.0-33.532.5-33.032.0-32.5

0m

920m

0m

980m50

0m

500m

C7 Not

e: v

ertic

al s

cale

exa

gger

ated

x 1

00

optisurface.com

Plane of Best Fit

C7

optisurface.com

Plane of Best Fit - Cut\Fill Map

Cut: 791m3/ha Cost: $1,190/ha Max Cut: 0.350mC7

optisurface.com

OptiSurface Design Constraints

Minimum Downslope: 1: 900 0.111%Maximum Downslope: 1: 300 0.333%

Max. Downslope change: 1: 4000 0.025%Minimum Cross-slope: 1: -200 -0.500%

Maximum Cross-slope: 1: 200 0.500%Max. Cross-slope change: 1: 1000 0.100%

optisurface.com

32.0

32.5

33.0

33.5

34.0

34.5

35.0

35.5

36.0

Elev

atio

n (m

)

35.5-36.035.0-35.534.5-35.034.0-34.533.5-34.033.0-33.532.5-33.032.0-32.5

0m

920m

0m

980m50

0m

500m

OptiSurface Design

C7

optisurface.com

OptiSurface - Cut\Fill Map

Cut: 180m3/ha Cost: $270/ha Max Cut: 0.270mC7

optisurface.com

Long Section Plot

Long section plot

C7

Downslope: 0.111% to 0.333%

optisurface.com

Long Section Plot

C7

Downslope:0.050% to 1.000%

optisurface.com

OptiSurface - Downslope Map

C7

optisurface.com

Runoff Velocity MapFLOW

DIRECTION

C7

Rainfall: 75mm/hr Max Velocity: 0.44m/s

optisurface.com

Runoff Depth Map

C7

Rainfall: 75mm/hr Infiltration:0mm Max Depth: 0.170m

FLOW

DIRECTION

optisurface.com

OptiSurface - Downslope Map

C7

optisurface.com

Design Surface Options– OptiSurface 1D

Row drainage in one direction only

– OptiSurface 2D Row drainage in two directions

– OptiSurface 4DCan drain in any direction as long as it

leaves the field

optisurface.com

Case Study C8 – Existing

C8

LS1LS2

optisurface.com

OptiSurface 2D Design

C8

LS1LS2

optisurface.com

Long Section 1

C8

optisurface.com

Long Section 2

C8

optisurface.com

OptiSurface 4D Design

C8

optisurface.com

OptiSurface 4D Existing

C8

optisurface.com

Mass Haul Optimisation

–Optimise for haul distance

–Reduce cost by up to 70%

–Mass haul value allows for more accurate earthmoving quotes

optisurface.com

OptiSurface - Cut\Fill Map

Cut: 95m3/ha

Cost: $200/ha

Max Cut: 0.163m

B8&B9

optisurface.com

Mass Haul Optimisation

Iteration Cut (m3/ha)

Mass Haul (m3.m)

0 92 2.1 million1 92 1.4 million2 95 0.7 million3 97 1.0 million