PAK BENG HYDROPOWER PROJECT
Transcript of PAK BENG HYDROPOWER PROJECT
-
PAK BENG HYDROPOWER PROJECT
Engineering-Status-Report-Drawings
September 2015
-
DRAWINGS LIST OF PROJECT PLANNING
PAGE DRAWING NAME DRAWING NUMBER
1 MAP OF PAK BENG POWER STATION BASIN ( PART OF LOWER MEKONG ) ND62-KM0933-0922(E)-2-1
2 LOCATION OF PAK BENG POWER STATION ND62-KM0933-0922(E)-2-2
3 GENERALIZED SECTION OF STATION PLANNING ON MEKONG ND62-KM0933-0922(E)-2-3
-
N
N
MAP OF THE GREATERMEKONG BASINA
-
DRAWINGS LIST OF ENGINEERING GEOLOGY
SERIAL DRAWING NAME DRAWING NUMBER
1 REGIONAL GEOLOGICAL MAP ND62-KM0933-0922(E)-3-1
2 GENERALIZED GEOLOGICAL MAP OF RESERVOIR ( 1 ) ND62-KM0933-0922(E)-3-2
3 GENERALIZED GEOLOGICAL MAP OF RESERVOIR ( 2 ) ND62-KM0933-0922(E)-3-2
4 GENERALIZED GEOLOGICAL MAP OF RESERVOIR ( 3 ) ND62-KM0933-0922(E)-3-2
5 GENERALIZED GEOLOGICAL MAP OF RESERVOIR ( 4 ) ND62-KM0933-0922(E)-3-2
6 GEOLOGICAL PLAN OF UPSTREAM DAM SITE AREA ND62-KM0933-0922(E)-3-3
7 ENGINEERING GEOLOGICAL LONGITUDINAL PROFILE OF RIVER BED OF SITE AREA ND62-KM0933-0922(E)-3-4
8 ENGINEERING GEOLOGICAL PROFILE OF EXPLORATORY LINE OF SITE AREA ND62-KM0933-0922(E)-3-5
9 ENGINEERING GEOLOGICAL PROFILE OF EXPLORATORY LINE ( DAM AXIS ) OF SITE AREA ND62-KM0933-0922(E)-3-6
10 ENGINEERING GEOLOGICAL PROFILE ALONG RIGHT-BANK SHIP LOCK AND NAVIGATION APPROCH CHANNEL
AXIS OF DAM SITE AREA ND62-KM0933-0922(E)-3-7
11 ENGINEERING GEOLOGICAL PROFILE LONGIYUDINAL COFFERDAM OF DAM SITE AREA ND62-KM0933-0922(E)-3-8
12 DISTRIBUTION PLAN OF NATURAL CONSTRUCTION MATERIAL ND62-KM0933-0922(E)-3-9
13 GEOLOGICAL PLAN OF LEFT BANK ROCK BORROW AREA ND62-KM0933-0922(E)-3-10
14 GEOLOGICAL PLAN OF RIGHT BANK ROCK BORROW AREA ND62-KM0933-0922(E)-3-11
-
DRAWINGS LIST OF ENGINEERING GEOLOGY (continue)
SERIAL DRAWING NAME DRAWING NUMBER
15 GEOLOGICAL PLAN OF NANEN ADMIXTURE YARD AREA ND62-KM0933-0922(E)-3-12
16 A-AGEOLOGICAL SECTION OF LIFT BANK BORROW AREA ND62-KM0933-0922(E)-3-13
17 D-DGEOLOGICAL SECTION OF LIFT BANK BORROW AREA ND62-KM0933-0922(E)-3-14
18 B-BGEOLOGICAL SECTION OF RIGHT BANK BORROW AREA ND62-KM0933-0922(E)-3-15
19 F-FGEOLOGICAL SECTION OF RIGHT BANK BORROW AREA ND62-KM0933-0922(E)-3-16
20 A-AGEOLOGICAL SECTION OF NUNN CREEK ADMIXTURE YARD ND62-KM0933-0922(E)-3-17
21 D-DGEOLOGICAL SECTION OF NUNN CREEK ADMIXTURE YARD ND62-KM0933-0922(E)-3-18
-
C
P
T
J
N
Q
C2~T1
T2~J2
N~Q
N~Q
N~Q
T2~J2
Dimi
F1
F2
F3
T2-J2
K2
C2-T1
P
N~Q
N~Q
N~Q
T2~J2
T2~J2
C2-T1
C2-T1
C2-T1
T2~J2
C2-T1
C2-T1
T2~J2
K
C
P
T
J
N
Q
Cenozoic Erathem
Erathem
Comprehensive Geologic Column
K
System
CodeColumnar
section
Mesozoic
Erathem
Palaeozoic Erathem
N Q
T2~J2
C2~T1
K2
F1
-
C
P
T
J
N
Q
C
P
T
J
N
Q
Cenozoic Erathem
Erathem
Comprehensive Geologic Column
K
System
CodeColumnar
section
Mesozoic
Erathem
Palaeozoic Erathem
-
Legend
-
Legend
-
Legend
-
Legend
-
Legend
-
Legend
-
Legend
Mekong river
Mekong river
Mekong river
-
N
Legend
-
N
Legend
-
N
-
Legend
OF LEFT BANK BORROW AREA
-
OF LEFT BANK BORROW AREA
Legend
-
Legend
OF RIGHT BANK BORROW AREA
-
Legend
OF RIGHT BANK BORROW AREA
-
Legend
-
Legend
NUNN CREEK ADMIXTURE YARD
-
DRAWINGS LIST OF PROJECT LAYOUT AND STRUCTURES
SERIAL DRAWING NAME DRAWING NUMBER
1 PROJECT LAYOUT1/4 ND62-KM0933-0922(E)-41-1
2 PROJECT LAYOUT2/4 ND62-KM0933-0922(E)-41-2
3 PROJECT LAYOUT3/4 ND62-KM0933-0922(E)-41-3
4 PROJECT LAYOUT4/4 ND62-KM0933-0922(E)-41-4
5 DISCHARGE SLUICES LAYOUT1/3 ND62-KM0933-0922(E)-41-5
6 DISCHARGE SLUICES LAYOUT2/3 ND62-KM0933-0922(E)-41-6
7 DISCHARGE SLUICES LAYOUT3/3 ND62-KM0933-0922(E)-41-7
8 RIGHT NONOVERFLOW DAM LAYOUT ND62-KM0933-0922(E)-41-8
9 LEFT NONOVERFLOW DAM LAYOUT ND62-KM0933-0922(E)-41-9
10 SAND BARRIER LAYOUT ND62-KM0933-0922(E)-41-10
11 STRUCTURAL LAYOUT OF POWERHOUSE1/12 ND62-KM0933-0922(E)-45-1
12 STRUCTURAL LAYOUT OF POWERHOUSE2/12 ND62-KM0933-0922(E)-45-2
13 STRUCTURAL LAYOUT OF POWERHOUSE3/12 ND62-KM0933-0922(E)-45-3
14 STRUCTURAL LAYOUT OF POWERHOUSE4/12 ND62-KM0933-0922(E)-45-4
15 STRUCTURAL LAYOUT OF POWERHOUSE5/12 ND62-KM0933-0922(E)-45-5
16 STRUCTURAL LAYOUT OF POWERHOUSE6/12 ND62-KM0933-0922(E)-45-6
-
DRAWINGS LIST OF PROJECT LAYOUT AND STRUCTURES(continue)
PAGE DRAWING NAME DRAWING NUMBER
17 STRUCTURAL LAYOUT OF POWERHOUSE7/12 ND62-KM0933-0922(E)-45-7
18 STRUCTURAL LAYOUT OF POWERHOUSE8/12 ND62-KM0933-0922(E)-45-8
19 STRUCTURAL LAYOUT OF POWERHOUSE9/12 ND62-KM0933-0922(E)-45-9
20 STRUCTURAL LAYOUT OF POWERHOUSE10/12 ND62-KM0933-0922(E)-45-10
21 STRUCTURAL LAYOUT OF POWERHOUSE11/12 ND62-KM0933-0922(E)-45-11
22 STRUCTURAL LAYOUT OF POWERHOUSE12/12 ND62-KM0933-0922(E)-45-12
23 SHIP LOCK LAYOUT1/3 ND62-KM0933-0922(E)-441-1
24 SHIP LOCK LAYOUT2/3 ND62-KM0933-0922(E)-441-2
25 SHIP LOCK LAYOUT3/3 ND62-KM0933-0922(E)-441-3
26 UPSTREAM ACCESS CHANNEL LAYOUT1/2 ND62-KM0933-0922(E)-441-4
27 UPSTREAM ACCESS CHANNEL LAYOUT2/2 ND62-KM0933-0922(E)-441-5
28 DOWNSTREAM ACCESS CHANNEL LAYOUT1/3 ND62-KM0933-0922(E)-441-6
29 DOWNSTREAM ACCESS CHANNEL LAYOUT2/3 ND62-KM0933-0922(E)-441-7
30 DOWNSTREAM ACCESS CHANNEL LAYOUT3/3 ND62-KM0933-0922(E)-441-8
31 FILLING AND EMPTING SYSTEM OF LOCK1/4 ND62-KM0933-0922(E)-441-9
32 FILLING AND EMPTING SYSTEM OF LOCK2/4 ND62-KM0933-0922(E)-441-10
-
DRAWINGS LIST OF PROJECT LAYOUT AND STRUCTURES(continue)
PAGE DRAWING NAME DRAWING NUMBER
33 FILLING AND EMPTING SYSTEM OF LOCK3/4 ND62-KM0933-0922(E)-441-11
34 FILLING AND EMPTING SYSTEM OF LOCK4/4 ND62-KM0933-0922(E)-441-12
35 FISH PASSAGE LAYOUT1/2 ND62-KM0933-0922(E)-442-1
36 FISH PASSAGE LAYOUT2/2 ND62-KM0933-0922(E)-442-2
37 ACCESS LAYOUT OF LOCK1/2 ND62-KM0933-0922(E)-443-1
38 ACCESS LAYOUT OF LOCK2/2 ND62-KM0933-0922(E)-443-2
39 LAYOUT OF EXTERNAL DEFORMATION MONITORING NETWORK ND62-KM0933-0922(E)-47-01
40 LAYOUT OF INSTRUMENTATION FOR DAMPOWERHOUSE AND SHIP LOCK1/4 ND62-KM0933-0922(E)-47-02
41 LAYOUT OF INSTRUMENTATION FOR DAMPOWERHOUSE AND SHIP LOCK2/4 ND62-KM0933-0922(E)-47-03
42 LAYOUT OF INSTRUMENTATION FOR DAMPOWERHOUSE AND SHIP LOCK3/4 ND62-KM0933-0922(E)-47-04
43 LAYOUT OF INSTRUMENTATION FOR DAMPOWERHOUSE AND SHIP LOCK4/4 ND62-KM0933-0922(E)-47-05
44 LAYOUT OF INSTRUMENTATION FOR SURFACE DEFORMATION OF DAM
POWERHOUSE AND SHIP LOCK ND62-KM0933-0922(E)-47-06
45 LAYOUT OF INSTRUMENTATION FOR SEEPAGE AROUND THE DAM ND62-KM0933-0922(E)-47-07
46 LAYOUT OF INSTRUMENTATION FOR THE PROJECT SLOPE ND62-KM0933-0922(E)-47-08
47 LAYOUT OF INSTRUMENTATION FOR DAM EARTHQUAKE ND62-KM0933-0922(E)-47-09
-
4
1
1
2
A A
Ship Lock Layout
NOTES:
-
1-1
2-2
NOTES:
-
4
4
2
2
1
1
4-4
3
3
SHIP LOCK LONGITUDINAL SECTION
NOTES:
-
1
UPSTREAM ACCESS CHANNEL LAYOUT
NOTES:
LIST OF COORDINATES
-
1-1
VERTICAL VIEW OF UPSTREAMCHANNEL LEFT FLOATING GUIDE WALL
NOTES:
-
2
2 4
4
DOWNSTREAM ACCESS CHANNEL LAYOUT
LIST OF COORDINATES
NOTES:
-
1
1
1
1
2
2
3
3
4
4
VERTICAL VIEW OF DOWNSTREAM CHANNEL RIGHT WALL
VERTICAL VIEW OF DOWNSTREAM CHANNEL LEFT WALL
NOTES:
-
1-1
2-2
4-4
3-3
NOTES:
-
A
A
B
B
D D
The main parameters and indexes
-
A-A
B
B
B-B
C
C
C-C
-
EE
E-E
F
F
F-F
G
G
G-G
Detail of water inlet Detail of intersection of corridor
-
D-D
H H
H-H
Detail of delivery port
-
LAYOUT OF INSTRUMENTATION FOR
SEEPAGE AROUND THE DAM
-
LAYOUT OF INSTRUMENTATION FOR
THE PROJECT SLOPE
-
DRAWINGS LIST OF ELECTROMECHANICAL EQUIPMENT AND STEEL STRUCTURES
PAGE DRAWING NAME DRAWING NUMBER
1 SINGLE LINE DIAGRAM ND62-KM0933-0922(E)-54-1
2 SINGLE LINE SCHEME CONTRAST ND62-KM0933-0922(E)-54-2
3 POWERHOUSE CROSS SECTION ND62-KM0933-0922(E)-5-1
4 ERECTION BAY FLOOR LAYOUT ND62-KM0933-0922(E)-5-2
5 DISTRIBUTION BOARD FLOOR LAYOUT ND62-KM0933-0922(E)-5-3
6 COOLING WATER EQUIPMENT FLOOR LAYOUT ND62-KM0933-0922(E)-5-4
7 TAIL WATER FLOW-CHANNEL FLOOR LAYOUT ND62-KM0933-0922(E)-5-5
8 BUSBAR FLOOR, GIS FLOOR AND OUTGOING LINE FLOOR LAYOUT ND62-KM0933-0922(E)-5-6
9 POWERHOUSE LONGITUDINAL SECTION ND62-KM0933-0922(E)-5-7
-
T3
11kV 11kV
G1 G2
T4 T9T1 T2
GNEGNE GNE
T5 T6 T7 T8
GCB1 GCB2
11kV
G3
GNE
GCB3 GCB4
GNE
11kV
G5
GNE
GCB5 GCB6
GNE
11kV
G7
GNE
GCB7 GCB8
GNE
11kV
G9
GNE
GCB9 GCB10
GNE
11kV
G11
GNE
GCB11 GCB12
GNE
11kV
G13
GNE
GCB13 GCB14
GNE
11kV
G15
GNE
GCB15 GCB16
G4 G6 G8 G10 G12 G14 G16
CEB
CEB CEB CEB CEB CEB CEBCEB CEB CEB CEB CEB CEB CEB
CEB
CEB
IPBCEB CEB
IPB
CT11
IPB IPB IPB IPB IPB IPB
-
Main transformertransportation road
350.400 RoofOutgoingLineElevation
335.800GIS
330.800 GILGILandCableRoad
5800 26002000 6200
6500
11200 9800
200t/50t/10t Crane
11000
14500
550kV GIS
500kV GIL
344.000 TailwaterPlateform
321.300 MainTransformerElevarion
313.800 GeneratingEquipmentElevation
308.800 CoolingWaterEquipmentElevation
294.500 TailwaterBottomPlate
292.750 InflowBottomPlate
346.000 DamCrest
343.810 (P=0.05%)CheckFloodLevel
341.340 (P=0.2%)DesignFloodLevel 340.000
NormalHighWaterLevel
335.340 DeadWaterLevel
300.000 InstallElevation
3300 10200 4800
376.000 500kV
37001800
3283
2217
338.300CraneRailElevation
342.940 (P=0.05%)PeakFloodDownsreamLevel
340.520 (P=0.2%)DesignFloodDownstreamLevel
320.588 (16)NormalTailwaterLevel
311.918(6)
307.500 LowestTailwaterLevel
384.000 500kV
5500
R>4550
R>4550
R>4550
GeneratingEquipment Floor
Cooling WaterEquipment Room
350.400 RoofOutgoingLineElevation
335.800GIS
330.800 GILGILandCableRoad
344.000 TailwaterPlateform
321.300 MainTransformerElevarion
313.800 GeneratingEquipmentElevation
308.800 CoolingWaterEquipmentElevation
294.500 TailwaterBottomPlate
292.750 InflowBottomPlate
346.000 DamCrest
338.300
300.000 InstallElevation
338.300 CraneRailElevation
372.500 230KV
230KV GIS
230KV GIL and Cable Road
GeneratingEquipment Floor
Cooling WaterEquipment Room
10200 4800
11000
377.000 230kV
4000 4000 4000
R>1800
R>1800
230KV GIL
Main TransformerTranspotation Road
230kV POWERHOUSE CROSS SECTION
3
/NOTES
1.mmm
550kV POWERHOUSE CROSS SECTION 230kV 550kV
All elevations are given in meter(m),
other dimensions are in millimeter(mm).
ND62-KM0933-0922(E)-5-
PAGE
2015.9
COUNTERPART SIGNTURE DATE D.C No.
CERTIFICATED
DRAWN
DESIGNED
CHECKED
EXAMINED
VERIFIED
APPROVED
A153000839
MOHURD,PRC
DRAWING No.
SCALE SEE DRAWING DATE
PAK BENG PROJECTELECTRICAL & MACHINERY SECTION
FEASIBILITY STUDY STAGE
POWERHOUSE CROSS SECTION
1
-
12001200
A B C
a b c T91300
12001200 12001200 12001200
A B C
a b c
A B C
a b c1300
7000
A B C
a b c
A B C
a b c1300
7000
A B C
a b c
A B C
a b c1300
T8 T7 T6 T5 T4 T3 T2 T1
800
abc
A B C
abc
A B C
41000 41000 41000 4100041000 328000 41000
Turbine Oil Tank Room
9000
13500
11200
9800
2700
15600
8500
2000
7120 12860
2000 4000
Governer Oil Unit Device
Governer OilTank
9000
14200
2800
5800
4600
6200
1600
9000
14200
1600
4600
5800
2800
6200
9000
14200
1600
4600
5800
2800
6200
9000
14200
1600
4600
5800
2800
6200
9000
14200
2300
4600
5800
6200
Runner
Lift
GeneratorLifting Hole
HydroturbineLifting Hole
3800
5500
7000
5600
5500
3800
5600
5500
3800
6200
5600
5500
3800
8700
321.300
321.300 321.300 321.300321.300
321.300 321.300 321.300321.300
321.300
2217
3700
1800 3287
7000
7000
1800 3287
2217
3700 50t
200t
50t
200t
50t
200t
50t
200t
41010 41000 41000 40980
40980 9910 21200 21200 19800 21200 19800 21200 19800 21200 19800 21200 19800 21200 9890 41000
8700
2200
2500
3500
2200
2500
3500
20890 10200 9910 20890 10200 9910 20890 10200 9910 20890 10200 9910 20890 10200 9910 20890 10200 9910 20690 10400 9910 9890 12500 10860
2100
0
5500
7750
2900
2900
62002200
5500
321.300
StatorRotor
50t Hook Limit Line
200t Hook Limit Line
50t Hook Limit Line
200t Hook Limit Line
Main Axis
VerticalTransportation Road
Diesel Generator Shelter
Main Transformer Transportation Road
Oil DisposalEquipment Room
HydroturbineLifting Hole
GeneratorLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
50t Hook Limit Line
200t Hook Limit Line
50t Hook Limit Line
200t Hook Limit Line
VerticalTransportation Road
StatorRotor
Main Axis
Runner
Intake AirRoom
Lift
Mai
n Tra
nsformer
Tra
nsportat
ion Rail
Intake AirRoom
Main Transformer Transportation Road Main Transformer Transportation Road Main Transformer Transportation Road Main Transformer Transportation Road
Governer Oil Unit Device
Governer OilTank
Governer Oil Unit Device
Governer OilTank
Governer Oil Unit Device
Governer OilTank
Governer Oil Unit Device
Governer OilTank
Governer Oil Unit Device
Governer OilTank
Governer Oil Unit Device
Governer OilTank
Governer Oil Unit Device
Governer OilTank
ERECTION BAY FLOOR EL.321.30m
4
EL.321.30m
/NOTES
1.mmm
All elevations are given in meter(m),
other dimensions are in millimeter(mm).
PAGE
ND62-KM0933-0922(E)-5-
2015.9
COUNTERPART SIGNTURE DATE D.C No.
CERTIFICATED
DRAWN
DESIGNED
CHECKED
EXAMINED
VERIFIED
APPROVED
A153000839
MOHURD,PRC
DRAWING No.
SCALE SEE DRAWING DATE
PAK BENG PROJECTELECTRICAL & MACHINERY SECTION
FEASIBILITY STUDY STAGE
ERECTION BAY FLOOR LAYOUT
2
-
8600
G15G16
11kVV
8500 4500
G13G14
400V5
3500
8500
3000
2200
3250
G11G12
400V4
8500
3250
8000
3250
8600
G9G10
3250
8000
3250
G7G8
11kVIII
3250
8000
3250
8600
G5G6
3250
8000
3250
G3G4
400V2
3250
8000
3250
11kVI
G1G2
3250
4500
8500
8500 4500
400V1
8500 4500
3250
3250
3250
3250
3250
3250
11450
9000
41000 41000 41000 205000
410000
Air Pressure Room
Midium air compressor
Medium PressureGas Storage
Low air compressor
Low PressureGas Storage
Leak Drainage Well
Repair Drainage Well
7500
6800
3000
3700
14200
9000
5800
6200
1500
8000
9000
2800
5800
2600
2000
6200
1500 14200
2800
5800
2600
2000
6200
1500 14200
4500
3700
86008600
2300
9000
4100041000
313.800
313.800
313.800
313.800
313.800
313.800313.800
313.800
313.800 313.800313.800
313.800
313.800
3700
2800 6800
3700
2900
3700
2800
2900
3700
6800
3700
2800
2900
3700
3700
6800 11300
3700
2900
2900
3700
3700
2800
2900
3700
6800
3700
2300
2900
2900
3700
2220
03300
15000
40980 9910 21200 21200 19800 21200 19800 21200 19800 21200 19800 21200 19800 21200
313.800
313.800
9910 40980
11kVII 400V3 11kVIV
2000
2600
ST6 ST5 ST4
I
ST1ST2
ST3
II
8600
2800
Local Control Cubicle
Section of 11kV Distribution Board
G1&G2 Sub-Distribution Board Section 1 of 400V Common Distribution BoardSection of 11kV Distribution Board
G3&G4 Sub-Distribution Board
Section 2 of 400V Common Distribution BoardBattery Room
Section of Lighting Distribution Board
G5&G6 Sub-Distribution Board
Section of 11kV Distribution Board
G7&G8 Sub-Distribution BoardG9&G10 Sub-Distribution Board
Section 3 of 400V Common Distribution BoardSection of Lighting Distribution BoardSection 4 of 400V Common Distribution Board
G11&G12 Sub-Distribution BoardG13&G14 Sub-Distribution Board
Section 5 of 400V Common Distribution Board Section of 11kV Distribution BoardSection of 11kV Distribution Board
G15&G16 Sub-Distribution Board
Battery Room
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Co
ntrol Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
Local Control Cubicle
GeneratorLifting Hole
HydroturbineLifting Hole
Mechanical WorkshopGeneratorLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
DISTRIBUTION BOARD FLOOR EL.313.80m
5
/NOTES
1.mmm
All elevations are given in meter(m),
other dimensions are in millimeter(mm).
EL.313.80mPAGE
ND62-KM0933-0922(E)-5-
2015.9
COUNTERPART SIGNTURE DATE D.C No.
CERTIFICATED
DRAWN
DESIGNED
CHECKED
EXAMINED
VERIFIED
APPROVED
A153000839
MOHURD,PRC
DRAWING No.
SCALE SEE DRAWING DATE
PAK BENG PROJECTELECTRICAL & MACHINERY SECTION
FEASIBILITY STUDY STAGE
DISTRIBUTION BOARD FLOORLAYOUT
3
-
1500
6200
5800
9000
14200
1500
6200
20002600
5800
9000
14200
6200
20002600
5800
9000
14200
Leakage Pit
Dewatering Pit
6000
9500
2000
9500
6000
19800 21200 19800 21200 19800 21200 19800 21200 19800 21200 19800 21200 19800 21200 9900
12950
15150308.800 308.800 308.800 308.800 308.800 308.800 308.800 308.800
282.800
282.800
212009910
2600
2000
Cooling Water Equipment RoomCooling Water Equipment RoomCooling Water Equipment RoomCooling Water Equipment RoomCooling Water Equipment RoomCooling Water Equipment RoomCooling Water Equipment RoomCooling Water Equipment Room
GeneratorLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
GeneratorLifting Hole
HydroturbineLifting Hole
COOLING WATER EQUIPMENT FLOOR EL.308.80m
6
/NOTES
1.mmm
All elevations are given in meter(m),
other dimensions are in millimeter(mm).
EL.308.80mPAGE
ND62-KM0933-0922(E)-5-
2015.9
COUNTERPART SIGNTURE DATE D.C No.
CERTIFICATED
DRAWN
DESIGNED
CHECKED
EXAMINED
VERIFIED
APPROVED
A153000839
MOHURD,PRC
DRAWING No.
SCALE SEE DRAWING DATE
PAK BENG PROJECTELECTRICAL & MACHINERY SECTION
FEASIBILITY STUDY STAGE
COOLING WATER EQUIPMENTFLOOR LAYOUT
4
-
13800
13800
9900 21200 19800 21200 19800 21200 19800 21200 19800 21200 19800 21200 19800 21200 19800 21200 9900
13800
13800
13800
13800
6000
9500
2000
9500
6000
282.800
282.800
292.750 292.750
294.500294.500
290.500290.500 Leakage Pit
Dewatering Pit
TAIL WATER FLOW-CHANNEL FLOOR
7
/NOTES
1.mmm
All elevations are given in meter(m),
other dimensions are in millimeter(mm).
PAGE
ND62-KM0933-0922(E)-5-
2015.9
COUNTERPART SIGNTURE DATE D.C No.
CERTIFICATED
DRAWN
DESIGNED
CHECKED
EXAMINED
VERIFIED
APPROVED
A153000839
MOHURD,PRC
DRAWING No.
SCALE SEE DRAWING DATE
PAK BENG PROJECTELECTRICAL & MACHINERY SECTION
FEASIBILITY STUDY STAGE
TAIL WATER FLOW-CHANNELFLOOR LAYOUT
5
-
4900
41000 18500 31500 3200041000 4100041000
SF6
335.800
335.800 335.800
335.800
335.800
17469 23531 4900
6.5mx3m
41000 41000 41000 40993 41007 41000 19000 13300
41000 41000 41000 41000 41000 41000
T9A T9B T9C
T8A T8B T8C
T7A T7B T7C T6A T6B T6C T5A T5B T5C T4A T4B T4C T3A T3B T3C
T2A T2B T2C T1A T1B T1C
800
15000
3000
31100 18600
3000
15000
800
13300
330.800
330.800330.800330.800330.800
330.800330.800330.800
40990 41000
A B C A B C A B C A B C A B C A B C A B C
LA LB LC
WT WT WT
CVT CVT CVT
SA SA SA
LA LB LC
WT
CVT
SA
WT WT
CVT CVT
SA SA2500 8000 8000 8000 8000
10004000 4000 4000 4000
4600
4000
4000
400014
00
6500
41000 41000 41000123000
350.400
350.400
341.800335.800
4500
5501
1399
LIFT
41010
2900
2600
2600
2600
2600
5x800
WashroomMeeting RoomCoatRoom
Commulation Room Anti-static floor 400mm
800
335.800
335.800
41000
7250
17006X80014007X8001700
Barrery Room
Relay Protection Board Room
Central Control Room
Washroom
Storage Room
400mm
LIFT
GIS(EL.335.800m)
(EL.330.800m)
(EL.350.400m)
8
/NOTES
1.mmm
All elevations are given in meter(m),
other dimensions are in millimeter(mm).
BUSBAR FLOOR LAYOUT(EL.330.800m)
GIS FLOOR LAYOUT(EL.335.800m)
ROOF OUTGONG LINE FLOOR LAYOUT(EL.350.400m)
PAGE
ND62-KM0933-0922(E)-5-
2015.9
COUNTERPART SIGNTURE DATE D.C No.
CERTIFICATED
DRAWN
DESIGNED
CHECKED
EXAMINED
VERIFIED
APPROVED
A153000839
MOHURD,PRC
DRAWING No.
SCALE SEE DRAWING DATE
PAK BENG PROJECTELECTRICAL & MACHINERY SECTION
FEASIBILITY STUDY STAGE
BUSBAR FLOOR, GIS FLOOR ANDOUTGOING LINE FLOOR LAYOUT
6
-
40990 989020 21200 19800 1980021200 21200 19800 21200 19800 21200 19800 21200 19800 21200 19800 21200 9890 20
1500 6000 1500
40990
321.300ErectionBayElevation
313.800 EquipmentElevation
313.800 EquipmentElevation
308.800CoolingWaterEquipmentElevation
308.800 CoolingWaterEquipmentElevation
300.000 InstallElevation
300.000 InstallElevation
282.800Water-collectingWellBottomPlate
282.800 Water-collectingWellBottomPlate
350.400OutgoingLineElevation
200t/50t/10t Crane 200t/50t/10t Crane 338.300 CraneRailElevation
338.300CraneRailElevation
9890 21200
9
/NOTES
1.mmm
All elevations are given in meter(m),
other dimensions are in millimeter(mm).
POWERHOUSE LONGITUDINAL SECTION LAYOUT
PAGE
ND62-KM0933-0922(E)-5-
2015.9
COUNTERPART SIGNTURE DATE D.C No.
CERTIFICATED
DRAWN
DESIGNED
CHECKED
EXAMINED
VERIFIED
APPROVED
A153000839
MOHURD,PRC
DRAWING No.
SCALE SEE DRAWING DATE
PAK BENG PROJECTELECTRICAL & MACHINERY SECTION
FEASIBILITY STUDY STAGE
POWERHOUSE LONGITUDINALSECTION
7
-
DRAWINGS LIST OF CONSTRUCTION PLAN AND SCHEDULING
PAGE DRAWING NAME DRAWING NUMBER
1 MAP OF TRANSPORTATION OUTSIDE ND62-KM0933-0922(E)-63-01
2 LAYOUT OF RIVE DIVERSION1/5 ND62-KM0933-0922(E)-61-01
3 LAYOUT OF RIVE DIVERSION2/5 ND62-KM0933-0922(E)-61-02
4 LAYOUT OF RIVE DIVERSION3/5 ND62-KM0933-0922(E)-61-03
5 LAYOUT OF RIVE DIVERSION4/5 ND62-KM0933-0922(E)-61-04
6 LAYOUT OF RIVE DIVERSION5/5 ND62-KM0933-0922(E)-61-05
7 GENERAL CONSTRUCTION LAYOUT ND62-KM0933-0922(E)-62-01
8 GENERAL CONSTRUCTION SCHEDULE ND62-KM0933-0922(E)-62-02
-
1.COVER2.PROJECT PLANNING0123
3.ENGINEERING GEOLOGY3DRAWINGS LIST OF ENGINEERING GEOLOGYDRAWINGS LIST OF ENGINEERING GEOLOGY (continue)
01.20080805-Model02.20080722(5w-1)-Model03.20080722(5w-2)-Model04.20080722(5w-3)-Model05.20080722(5w-4)-Model06.20100331-Model07.20080715-Model08.20080715-Model09.()201003-Model10.xiugaizhong-Model11.20080708-Model12.201004-Model13.-Model14.-Model15.-Model16.(A-A')-Model17.(D-D')-Model18.B-B-Model19.F-F-Model20.(A-A')-Model21.(D-D')-Model
4.PROJECT LAYPUT AND STRUCTURES0.DRAWINGS LIST OF PROJECT LAYOUT AND STRUCTURESDRAWINGS LIST OF PROJECT LAYOUT AND STRUCTURES(continue)DRAWINGS LIST OF PROJECT LAYOUT AND STRUCTURES(continue)
1.-12.-23.-34.-45.-56.-67.-78.-89.-910.-1011.45-01112.45-02213.45-03314.45-04415.45-05516.45-06617.45-07718.45-08819.45-09920.45-101021.45-111122.45-121223.-Model24.-Model25.-Model26.-Model27.-Model28.-Model29.-Model30.-Model31.-Model32.-Model33.-Model34.-Model35.1-Model36.2-Model37.1-Model38.2-Model39.47-01 LAYOUT OF EXTERNAL DEFORMATION MONITORING NETWORK-Model40.47-02 LAYOUT OF INSTRUMENTATION FOR DAMPOWERHOUSE AND SHIP LOCK-Model41.47-03 LAYOUT OF INSTRUMENTATION FOR DAMPOWERHOUSE AND SHIP LOCK-Model42.47-04 LAYOUT OF INSTRUMENTATION FOR DAMPOWERHOUSE AND SHIP LOCK-Model43.47-05 LAYOUT OF INSTRUMENTATION FOR DAMPOWERHOUSE AND SHIP LOCK-Model44.47-06 LAYOUT OF INSTRUMENTATION FOR SURFACE DEFORMATION OF DAMPOWERHOUSE AND SHIP LOCK-Model45.47-07 LAYOUT OF INSTRUMENTATION FOR SEEPAGE AROUND THE DAM-Model46.47-08 LAYOUT OF INSTRUMENTATION FOR THE PROJECT SLOPE-Model47.47-09 LAYOUT OF INSTRUMENTATION FOR DAM EARTHQUAKE-Model
5.ELECTROMECHANICAL EQUIPMENT AND STEEL STRUCTURES0DRAWINGS LIST OF ELECTROMECHANICAL EQUIPMENT AND STEEL STRUCTURES
1 SINGLE LINE DIAGRAM 2 SINGLE LINE SCHEME CONTRAST 3 POWERHOUSE CROSS SECTION4 ERECTION BAY FLOOR LAYOUT5 DISTRIBUTION BOARD FLOOR LAYOUT6 COOLING WATER EQUIPMENT FLOOR LAYOUT7 TAIL WATER FLOW-CHANNEL FLOOR LAYOUT8 BUSBAR FLOOR, GIS FLOOR AND OUTGOING LINE FLOOR LAYOUT9 POWERHOUSE LONGITUDINAL SECTION
6.CONSTRUCTION PLAN AND SCHEDULING6CONSTRUCTION PLAN AND SCHEDULING 11.0922(E)-63-01 (20151116)0922(E)-61-01 15(20151116)0922(E)-61-02 25(20151116)0922(E)-61-03 35(20151116)0922(E)-61-04 45(20151116)0922(E)-61-05 55(20151116)0922(E)-62-01 (20151116)0922(E)-62-02 (20151116)