Goran Tesevic Civil and Structural Engineer

Key Projects:1. Reconstruction of reinforced concrete highway bridge

L=12+29.50+12 m……………………………………………………......3-8

2. Reconstruction of concrete beam bridge L=8.50 m…………… .9-103. Reconstruction of concrete beam bridge L=9.0 m……………..11-144. Reconstruction of concrete beam bridge L=7.0 m……………..15-165. Reconstruction of concrete beam bridge L=7.5 m…………………176. Demolition and removal of old expansion joints and construction

of new ones…………………………………………………………….18-207. Production of reinforced T beams……………………………….........21

1. Reconstruction of reinforced concrete highway bridge L=12+29.50+12 m.

Replacement of damaged post-tensioning beam

Installation of highway safety traffic barriers

Setting load of 150 KN in order to preserve the existing deflection

Installation of a temporary support

Isolation of pre-stressed T beam New pre-stressed T beam

Replacement of damaged pre-stressed T beam

New longitudinal connection between the top of flanges

Detail during work

Repairing cracks in concrete by injecting epoxy resin

Repair and rehabilitation of cracks

2. Reconstruction of concrete beam bridge L=8.50 m

Removing of damaged precast concrete deck modules and laying reinforced concrete T beams

Concreting Installation waterproofing membranes

3. Reconstruction of concrete beam bridge L=9.0 m

Damaged precast concrete deck modules

Start removing of damaged precast concrete deck modules and new deck slab

Concreting Detail between two concrete T beams

Ready for installation waterproofing membrane A new bridge safety fence and guardrail barriers

4. Reconstruction of concrete beam bridge L=7.0 m

Expanding of bridge sidewalks

New sidewalk with a safety fence

5. Reconstruction of concrete beam bridge L=7.0 m

Expanding of bridge sidewalks New sidewalks with a safety fences

Bridge 1 Preparing for extension joint replacement

New extension joint

Bridge 2 Expansion joint during installation

Production of reinforced T beams