Goran Tesevic Civil and Structural Engineer

Transcript of Goran Tesevic

Page 1: Goran Tesevic

Goran Tesevic Civil and Structural Engineer

Page 2: Goran Tesevic

Key Projects:1. Reconstruction of reinforced concrete highway bridge

L=12+29.50+12 m……………………………………………………......3-8

2. Reconstruction of concrete beam bridge L=8.50 m…………… .9-103. Reconstruction of concrete beam bridge L=9.0 m……………..11-144. Reconstruction of concrete beam bridge L=7.0 m……………..15-165. Reconstruction of concrete beam bridge L=7.5 m…………………176. Demolition and removal of old expansion joints and construction

of new ones…………………………………………………………….18-207. Production of reinforced T beams……………………………….........21

Page 3: Goran Tesevic

1. Reconstruction of reinforced concrete highway bridge L=12+29.50+12 m.

Replacement of damaged post-tensioning beam

Installation of highway safety traffic barriers

Page 4: Goran Tesevic

Setting load of 150 KN in order to preserve the existing deflection

Installation of a temporary support

Page 5: Goran Tesevic

Isolation of pre-stressed T beam New pre-stressed T beam

Page 6: Goran Tesevic

Replacement of damaged pre-stressed T beam

Page 7: Goran Tesevic

New longitudinal connection between the top of flanges

Detail during work

Page 8: Goran Tesevic

Repairing cracks in concrete by injecting epoxy resin

Repair and rehabilitation of cracks

Page 9: Goran Tesevic

2. Reconstruction of concrete beam bridge L=8.50 m

Removing of damaged precast concrete deck modules and laying reinforced concrete T beams

Page 10: Goran Tesevic

Concreting Installation waterproofing membranes

Page 11: Goran Tesevic

3. Reconstruction of concrete beam bridge L=9.0 m

Damaged precast concrete deck modules

Page 12: Goran Tesevic

Start removing of damaged precast concrete deck modules and new deck slab

Page 13: Goran Tesevic

Concreting Detail between two concrete T beams

Page 14: Goran Tesevic

Ready for installation waterproofing membrane A new bridge safety fence and guardrail barriers

Page 15: Goran Tesevic

4. Reconstruction of concrete beam bridge L=7.0 m

Expanding of bridge sidewalks

Page 16: Goran Tesevic

New sidewalk with a safety fence

Page 17: Goran Tesevic

5. Reconstruction of concrete beam bridge L=7.0 m

Expanding of bridge sidewalks New sidewalks with a safety fences

Page 18: Goran Tesevic

Bridge 1 Preparing for extension joint replacement

Page 19: Goran Tesevic

New extension joint

Page 20: Goran Tesevic

Bridge 2 Expansion joint during installation

Page 21: Goran Tesevic

Production of reinforced T beams