Post on 19-Jun-2015
description
Werner Sprung
Dirk Muschalla
Elisabeth Sprung
Austria
GIS BASED SEWER MAINTENANCE
SEWER SYSTEMS
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 2
SEWER SYSTEMS
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 3
SEWER MAINTENANCE• Bild Spülfahrzeug
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 4
FORMER PRACTICE• Bild Tafeln Betrieb Abwasser
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 5
WHY CHANGE THE FORMER PRACTICE?• Objection: Increasing the sewers live span
• Method: Calculate dynamic maintenance intervals by a damage forecast model
• Material: Maintenance data are needed a GIS based application is installed
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 6
STRUCUTURE OF THE APPLICATION
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 7
DAMAGE FORECAST MODEL
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 8
• Markov chain
GIS BASED APPLICATION• Digital Work Report
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 9
GIS BASED APPLICATION• Digital Work Report
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 10
WHY MAPWINDOWS• Free
• Fast
• Easy
• Edit shape files
• Effective and simple tools
• VB.net and C#
• Good tutorial for newbie‘s
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 11
STRUCTURE
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 12
Base
STRUCTURE
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 13
Base
DB GIS
S
Html
DB
Shape
Shape
S
S
DB
Shape
S
DB
Shape
S
DB
Shape
DIGITAL WORK REPORT• The Application
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 14
DIGITAL WORK REPORT• The Application
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 15
DIGITAL WORK REPORT• Team
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 16
DIGITAL WORK REPORT• Selection
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 17
DIGITAL WORK REPORT• Conduits
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 18
DIGITAL WORK REPORT• Private sewers
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 19
DIGITAL WORK REPORT• Gully
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 20
DIGITAL WORK REPORT• Work report
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 21
PRACTICE
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 22
OPTIMIZATION TOOLIt includes:
•Work reports
•Operational requirements
•Hydrological requirements
•Company requirements
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 23
BENEFIT• Maintenance dependent on requirements
• Information for planning about sand and gravel deposits in sewers
• Information for planning about operational time and effort for each conduit
• Master data list for each conduit
• Effective work report
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 24
HYDRODYNAMIC MODEL
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 25
POLLUTING LOAD SIMULATION
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 26
CONCLUSION
• MapWindow based applications help to optimize sewer maintenance. Those tools increase the sewers live span and reduce the pollution in our rivers.
INGENIEURBÜRO DIPL.-ING. WERNER SPRUNG MWCONFERENCE 2014 27
Werner Sprung
Dirk Muschalla
Elisabeth Sprung
Austria
THANK YOU