BUILDING STRONG®

Slide 1

Mark Woodward, PEJehu Johnson, EI

Geotechnical Branch

New Orleans District

28 April 2010

35th Southwest GeotechnicalEngineering Conference

Geotechnical Challenges –

New Orleans USACE

BUILDING STRONG®

Slide 2

BATONROUGE

LAFAYETTE

VENICE

NEWORLEANS

Beneficial Use ofDredged Material

Acquisitions

Freshwater DiversionStructure

Saltwater Barrier

Lock

New OrleansDistrict

HOUMA

MORGAN CITY

LAKE CHARLES

Bank Protection

Control Structure

Pumping Station

New Orleans DistrictBoundary

Gulf IntracoastalWaterway

Mississippi River andTributaries Levee

Hurricane ProtectionLevee

Deep Draft Waterway

Slide 2

BUILDING STRONG®

Slide 3

West Bank Polder

East Bank Polder

New Orleans AreaHurricane & Storm Damage Risk Reduction System

Slide 3

BUILDING STRONG®

Slide 4

BUILDING STRONG®

Slide 5Slide 5

BUILDING STRONG®

Slide 6Slide 6

BUILDING STRONG®

Slide 7

Berm

Circular Soil Sample

cut into 4 Quadrants

with 3 samples tested

(trimmed circular)

1

23

5” Diameter Soil Boring

4th

Quadrant

retained for

future use

Toe

Boring

Toe

Boring

BoringCL

Typical Levee Section

5” Diameter Undisturbed Soil Borings

& CPT (Cone Penetrometer Tests)

alternating at 500’ o.c.

LeveeCL

Typical Levee Section

& Geotechnical Field Investigation

BUILDING STRONG®

Slide 8

Subsurface Explorations 500’ OC

BUILDING STRONG®

Slide 9

BUILDING STRONG®

Slide 10

BUILDING STRONG®

Slide 11

Current Geotechnical Levee Criteria

HSDRRS CriteriaDesign Still Water Elevation

(90% assurance)

for Hurricane ConditionMethod of Failure: Global Stability

Method of Analysis: Spencer

F.O.S.= 1.5

Protected Side

Failure Plane

BUILDING STRONG®

Slide 12

P.S.F.S.

EXIST. LEVEE EL.

90% (2057) SWL EL

LEVEE

SHEET

PILE

2057 1% DESIGN EL.’

CONCRETE

or Steel H-

PILE (TYP)

T-WALL

BUILDING STRONG®

Slide 13

Seepage Concerns on Mississippi

River Levees

BUILDING STRONG®

Slide 14

HIGH WATER EFFECTSON FLOOD CONTROL

PROJECTS

• Overtopping

• Sand Boils

• Seepage

• Sloughing

• Wave Wash

• Erosion

US Army Corpsof Engineers

BUILDING STRONG®

Slide 15

BUILDING STRONG®

Slide 16

Underlying Clays and Silts

NATURAL BLANKET

STABILITYBERM

STABILITYBERM

LEVEE CENTERLINE

RIVERWARD LANDWARD

FOUNDATION SAND

RIVERSIDE ENLG’TIMPERVIOUS

ZONE

Original Levee of Impervious Clays &

Silts

BUILDING STRONG®

Slide 17

UNDERLYING CLAY AND SILT

NATURAL BLANKET

LEVEE CENTERLINE

RIVERWARD LANDWARD

FOUNDATION SAND

RANDOMZONE

SAND BOIL

IMPERVIOUSZONE

BUILDING STRONG®

Slide 18

EFFECTS OF SANDBOILS

• Development of pipe under the leveeThe pipe develops from the landside toward the flood side.

Material is ejected in a cone shape around a spring head. The

levee crest may be noticed to sag.

• Sloughing of landside levee slope near

the toe

• Development of a landside shear or slide

US Army Corpsof Engineers

BUILDING STRONG®

Slide 19

RIVERSIDELANDSIDE

SUBSIDENCE OF CROWN

SEEPAGE PATH

PIPE UNDER LEVEE

SEEPAGE PATH

RIVERSIDE

SLOUGHING OF SLOPE

LANDSIDE

SEEPAGE PATH

RIVERSIDELANDSIDE

SLIDING SURFACE

DEVELOPMEMENT OF PIPE UNDER LEVEEFIG. 1

SLOUGHING OF LANDSLIDE SLOPE DUE TORAVELLING AND UNDERCUTTING OF TOE

FIG. 2

DEVELOPMENT OF SHEAR SLIDEFIG. 3

EFFECTS OF SAND BOILS

ON LEVEE

REDUCTION IN SHEARINGSTRENGTH IN THIS ZONE

BUILDING STRONG®

Slide 20

Underlying Clays and Silts

NATURAL BLANKET

LEVEE CENTERLINE

RIVERWARD LANDWARD

FOUNDATION SAND

UNDER SEEPAGE BERM

BUILDING STRONG®

Slide 21

Underlying Clays & Silts

NATURAL BLANKET

LEVEE CENTERLINE

RIVERWARD LANDWARD

FOUNDATION SAND

PONDED SEEPAGELook for Sand Boils

Under Seepage Event with Leakage at Levee

Toe

Piezometric Head

BUILDING STRONG®

Slide 22

BUILDING STRONG®

Slide 23

Open System Piezometers

BUILDING STRONG®

Slide 24

BUILDING STRONG®

Slide 25

BUILDING STRONG®

Slide 26

IMPERVIOUS CLAY AND SILT

NATURAL BLANKET

For K=1.0x 10-2 cm/sec, a drop of water can travel 235’ in 8.5 days

RIVERWARD LANDWARD

FOUNDATION SAND

RANDOMZONE

SAND BOIL

IMPERVIOUSZONE

10’

1 on 4 1 on 5

235’

25’

BUILDING STRONG®

Slide 27

BUILDING STRONG®

Slide 28

BUILDING STRONG®

Slide 29

BUILDING STRONG®

Slide 30

BUILDING STRONG®

Slide 31

BUILDING STRONG®

Slide 32

BUILDING STRONG®

Slide 33

BUILDING STRONG®

Slide 34

BUILDING STRONG®

Slide 35

BUILDING STRONG®

Slide 36

BUILDING STRONG®

Slide 37

BUILDING STRONG®

Slide 38

BUILDING STRONG®

Slide 39

Underlying Clays and Silts

NATURAL BLANKET

LEVEE CENTERLINE

RIVERWARD LANDWARD

FOUNDATION SAND

Original Levee ofImpervious Clays and Silts

LINE OFRELIEF WELLS

RiversideEnlargement

BUILDING STRONG®

Slide 40

Underlying Clays & Silts

NATURAL BLANKET

LEVEE CENTERLINE

RIVERWARD LANDWARD

FOUNDATION SAND

Original Levee of Impervious Clays & Silts

RIVERSIDE ENLG”T>IMPERVIOUS

ZONE

PONDED SEEPAGELook for Sand Boils

Under Seepage Event with Leakage at Levee

Toe

Piezometric Head

BUILDING STRONG®

Slide 41

BUILDING STRONG®

Slide 42

BUILDING STRONG®

Slide 43

BUILDING STRONG®

Slide 44

BUILDING STRONG®

Slide 45

BUILDING STRONG®

Slide 46

Open barrel used

to control sandboils

BUILDING STRONG®

Slide 47

BUILDING STRONG®

Slide 48

BUILDING STRONG®

Slide 49

BUILDING STRONG®

Slide 50

BUILDING STRONG®

Slide 51

BUILDING STRONG®

Slide 52

BUILDING STRONG®

Slide 53

BUILDING STRONG®

Slide 54

Deep Soil Mixing

BUILDING STRONG®

Slide 55

Deep Soil Mixing

Inject lime, cement, slag, fly ash, etc. into

soil

Mix thoroughly

Creates a pozzolanic reaction in the

soil/cement mass

BUILDING STRONG®

Slide 56

Deep Mixing Design Parameters

WET MIXING

Water/binder ratio

Binder load

Number of shafts to suit application

Spoil disposal

WET METHOD

Excellent overlap

Adaptable to multiple augers

High strength

Spoil disposal

DRY MIXING

Binder load

Mixing energy

Rate of penetration

Soil moisture

DRY METHOD

No spoil

No water needed

Medium to high strength

BUILDING STRONG®

Slide 57

Design for the purpose

Stability and support – strength, array, length,

uniformity

Seepage cutoff – continuity, overlap, length,

permeability

Seismic retrofit – All of the above

BUILDING STRONG®

Slide 58

Three DM Applications

Resist deflection of major structures

Buttress existing floodwalls

Reinforce new embankments

BUILDING STRONG®

Slide 59

Major Structures -17th Street & Orleans Avenue Canals

Interim Closure Structures (2006)

BUILDING STRONG®

Slide 60

17th Street Canal

Interim Closure Structure (2006)

BUILDING STRONG®

Slide 61

17th Street Canal

Interim Closure Structure (2006)

BUILDING STRONG®

Slide 62

17th Street Canal

Interim Closure Structure (2006)

BUILDING STRONG®

Slide 63

BUILDING STRONG®

Slide 64

Orleans Avenue Canal

Interim Closure Structure (2006)

BUILDING STRONG®

Slide 65

Orleans Avenue Canal

BUILDING STRONG®

Slide 66

Orleans Avenue Canal

Interim Closure Structure (2006)

BUILDING STRONG®

Slide 67

Orleans Avenue Canal Interim

Closure Structure (2006)

BUILDING STRONG®

Slide 68

Gainard Woods Pump Station

Plaquemines Parish

Gainard Woods Pump Station

BUILDING STRONG®

Slide 69

Floodwalls –Gainard Woods Pump Station (2006)

BUILDING STRONG®

Slide 70

Gainard Woods T-Wall (2006)

BUILDING STRONG®

Slide 71

Floodwalls –Gainard Woods Pump Station (2006)

-40 -20 0 20 40 60 80 100

Distance (ft)

-100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

Ele

va

tio

n (

ft)

w

-40 -20 0 20 40 60 80 100

Distance (ft)

-100

-90

-80

-70

-60

-50

-40

-30

-20

-10

0

10

20

Ele

va

tio

n (

ft)

w

BUILDING STRONG®

Slide 72

Floodwalls –Inner Harbor Navigation Canal (2009)

BUILDING STRONG®

Slide 73

IHNC Floodwall Reinforcement

(May 2009)

BUILDING STRONG®

Slide 74

IHNC Floodwall Reinforcement

(May 2009)

BUILDING STRONG®

Slide 75

Homeplace Levee Enlargement

Plaquemines Parish

Homeplace Levee Enlargement

BUILDING STRONG®

Slide 76

Levees –

Homeplace Levee Enlargement (P24)

(2006)

BUILDING STRONG®

Slide 77

Berm needed to achieve safety

factor of 1.30

+2

+17

BUILDING STRONG®

Slide 78

+2

+17

-402,300 psf

To achieve SF = 1.30; Foundation

improved from 270 psf to 2300 psf

BUILDING STRONG®

Slide 79

Homeplace Levee Enlargement (P24)

(2006)

BUILDING STRONG®

Slide 80

Homeplace Levee Enlargement (P24)

(2006)

FIG 4a. Shallow Surface (FS=1.33)

100% Efficiency of Joints

FIG 4b. Deep Surface (FS=1.51)

100% Efficiency of Joints

FIG 4c. Shallow Surface (FS=1.29)

0% Efficiency, 5 Vertical JointsFIG 4d. Deep Surface (FS=1.37)

0% Efficiency, 5 Vertical Joints

BUILDING STRONG®

Slide 81

Construction of DMM Shear Walls

BUILDING STRONG®

Slide 82

Unconfined Compressive Strength Test Results

for P24 DMM Cores

Number of Tests: 2081

Mean UCS: 2145 kN/m2 (311 psi)

Standard Deviation: 1259 kN/m2 (183 psi)

Coefficient of Variation: 0.59

UCS = 690 kN/m2 (100 psi) was used for

design

BUILDING STRONG®

Slide 83

P-24 Final Section

BUILDING STRONG®

Slide 84

Design Guide for Levees and Floodwall

Stability Using DM Shear Walls

• Limit equilibrium analysis

• Combines sliding,

overturning and internal

shear analyses

• Uses reliability factors for

material and stability

safety factors

• Uses CDIT 2002 as basis

for analysis

DESIGN GUIDE

FOR

LEVEE AND FLOODWALL

STABILITY USING DEEP-

MIXED WALLS

by

George Filz and Eddie Templeton

February 10, 2009

BUILDING STRONG®

Slide 85

QA/QC Testing

Reverse Column Pentetration Testing

Pressuremeter

Cone Penetrometer Testing

Borehole Camera

Exhumation (Exposure, Excavation)

Sonic Drilling

Coring and Compressive Strength Testing

BUILDING STRONG®

Slide 86

BUILDING STRONG®

Slide 87

BUILDING STRONG®

Slide 88

Pressuremeter

Use to great success during 2003 Test Section

Utilized for Q/A and Q/C in 2008

Can be used to determine limit pressure, which

can be obtain shear strength

Limit pressure is assumed to occur when volume

is doubled

Poisson’s ratio assumed to be 0.33

Column Modulus can also be determined

BUILDING STRONG®

Slide 89

IHNC CPT Data

0

5

10

15

20

25

30

35

40

45

0 10 20 30 40 50 60 70

Shear Strength (psi)

De

pth

(ft

.)

t = 30 min. t = 3 hrs. t = 6 hrs.

BUILDING STRONG®

Slide 90

BUILDING STRONG®

Slide 91

BUILDING STRONG®

Slide 92

BUILDING STRONG®

Slide 93

Column Exhumation

BUILDING STRONG®

Slide 94

BUILDING STRONG®

Slide 95

BUILDING STRONG®

Slide 96

BUILDING STRONG®

Slide 97

Sonic Drilling Rig

BUILDING STRONG®

Slide 98

Sonic Drilling Cores

BUILDING STRONG®

Slide 99

Wet Grab Sampling

BUILDING STRONG®

Slide 100

LPV – 111

BUILDING STRONG®

Slide 101

LPV - 111

Largest Deep Soil Mixing Project in the

World

1.7 million cubic yards of soil will be

treated.

5.3 miles of Levee will be raised from 17

feet to 28 feet

Soil mixing extends to -67 ft deep and

varies in width from 54 ft to 98 ft

BUILDING STRONG®

Slide 102

BUILDING STRONG®

Slide 103

BUILDING STRONG®

Slide 104

BUILDING STRONG®

Slide 105

BUILDING STRONG®

Slide 106

BUILDING STRONG®

Slide 107

BUILDING STRONG®

Slide 108

BUILDING STRONG®

Slide 109

BUILDING STRONG®

Slide 110

BUILDING STRONG®

Slide 111

BUILDING STRONG®

Slide 112

Large Hurricane Risk

Reduction Structures

BUILDING STRONG®

Slide 113

IHNC SURGE BARRIER

GIWWMRGO

20 March 2010

BUILDING STRONG®

Slide 114

Lake Borgne– Project Alignment

GIWW & Barge Gates

Floodwall

Bayou Bienvenue Gate

MRGO

Closure

North Access Bridge

Transition T-Walls

BUILDING STRONG®

Slide 115

BUILDING STRONG®

Slide 116

Barrier Flood Wall

BUILDING STRONG®

Slide 117

GIWW Barge / Sector Gate (Conceptual)

BUILDING STRONG®

Slide 118

Bayou Bienvenue Vertical Lift Gate (Conceptual)

BUILDING STRONG®

Slide 119

Boring Locations

BUILDING STRONG®

Slide 120

Geologic Profile

GIWW

-200’

-150’

-100’

-50’

0’

20+00 60+00 100+00

BBMRGO

BUILDING STRONG®

Slide 121

Design Investigations

Pile Load Test

Lateral Load Test

Non-linear Incremental Structural Analysis (NISA)

Physical Model – GIWW Sector Gate

Physical Model – Barrier Wall

Navigation Simulation – Gate Width Study

Approach Wall Vessel Impact Analysis

Navigation Physical Guidewall Model

USCG Navigation Risk Assessment

Long-term Instrumentation Plan

BUILDING STRONG®

Slide 122

Soldier Pile Placement –

Complete!

1271 piles – Completed October 21, 2009

Weeks 526 Rig

144 Feet Long

66” Diameter, 94 tons

BUILDING STRONG®

Slide 123

MRGO Section

BUILDING STRONG®

Slide 124

Sand Fill at MRGO

GIW

W

BUILDING STRONG®

Slide 125

EL -130’

EL -55’TIP OF JET

GROUT COLUMN

EL -15’mud line

EL 26’

66” spun cast pileJET GROUT

18” concrete closure piles

12’ concrete cap

protected side flood side

EL -190’

36” steel batter pile

BUILDING STRONG®

Slide 126

Spin Casting

BUILDING STRONG®

Slide 127

Spun Cast Piles

BUILDING STRONG®

Slide 128

Soldier Piles

BUILDING STRONG®

Slide 129

Post Tensioning

BUILDING STRONG®

Slide 130

BUILDING STRONG®

Slide 131

Pile Load Test

BUILDING STRONG®

Slide 132

18” Closure Piles & Jet Grouting

2504 piles – Completed February 11, 2010

BUILDING STRONG®

Slide 133

Soldier, Closure, Batter Piles

Closure Piles

Temporary Trestle

36” Batter

Piles

Soldier Piles

Interstitial Space

BUILDING STRONG®

Slide 134

66” Concrete

Pile Clean Out

Drill bit removes the mud

from inside the pile

BUILDING STRONG®

Slide 135

Grout bag infill

Grout Bag Placement

BUILDING STRONG®

Slide 136

Batter Piles

BUILDING STRONG®

Slide 137

Precast Caps17 Feet Long, 96 Tons

BUILDING STRONG®

Slide 138

Parapet

BUILDING STRONG®

Slide 139

Interesting Quantity Facts

The IHNC Project Involves:

160 miles of piles- approx. 20 miles more than from

Cleveland to Columbus

The weight of 8 Eiffel Towers of Steel

Enough Concrete to fill a football field 94 feet deep

BUILDING STRONG®

Slide 140

BUILDING STRONG®

Slide 141

GIWW –Western Closure Complex

(WCC)

BUILDING STRONG®

Slide 142

WCC

BUILDING STRONG®

Slide 143

Project Features:

• 19,140 cfs Drainage Pumping

Station (11 x 1740 cfs vertical

“Flower Pot” pumps)

• 225-foot primary navigation gate

• Sluice gates (5 – 16’ x 16’)

• T-wall along edge of Bayou aux

Carpes CWA 404(c) wetlands (4200’ X 100’ construction corridor)

• Water Control Structure

• Levee and East Bayou Road

Realignment

• Environmental Mitigation and

Augmentations

• Foreshore Protection

• Algiers Canal dredging

GIWW - West Closure Complex

Levee and Road Realignment

Water control

structure

T-Wall with berm

Bayou aux Carpes

404(c) area

Combi-wall

225’ Navigation gate

Sluice gates

19140 cfs

Pump Station

BUILDING STRONG®

Slide 144

WCC Cofferdam Piles

BUILDING STRONG®

Slide 145

Dewatered Cofferdam

BUILDING STRONG®

Slide 146

Dewatered Cofferdam

BUILDING STRONG®

Slide 147

Pump Station Piles

BUILDING STRONG®

Slide 148

Pile Load Test

BUILDING STRONG®

Slide 149

Pile Load Test

BUILDING STRONG®

Slide 150

Pile Load Test

BUILDING STRONG®

Slide 151

Heave Test Section

BUILDING STRONG®

Slide 152

WCCEarthen Material Processing

BUILDING STRONG®

Slide 153

New Levee Construction

BUILDING STRONG®

Slide 154

New Levee Construction

BUILDING STRONG®

Slide 155

East T-wall

BUILDING STRONG®

Slide 156

East T-wall Preload

BUILDING STRONG®

Slide 157

Questions?