Building A World Of Difference Through MERAH PUTIH – Jakarta, 25 Nov 2013| BRIEFING DOCUMENT
George Gruber
George Gruber has 39 years of process engineering experience in plant operations, process development, and EPC project execution. He started his career with DuPont as a process engineer at the Victoria, Texas Petrochemicals Plant and at the New Johnsonville, Tennessee Pigments Plant. George was a process development engineer for Occidental Oil Shale where he designed and operated ancillary facilities for modified in-situ oil shale retorting. He was a process engineering supervisor at the Great Plains Synfuels Plant in Beulah, North Dakota from 1982 to 2001 during plant construction, startup, and the first five years of commercial operation. The Great Plains Synfuels Plant gasifies lignite to produce SNG and ammonia. Since 2001, George has been employed by Black & Veatch in the Gas, Oil, and Chemicals Business Line. George Gruber is currently Vice President and Technology Manager for Gasification, Syngas, Synfuels, and Chemicals at Black & Veatch. George leads Black & Veatch development of projects to produce ammonia, urea, methanol, diesel, SNG and electricity from syngas produced by coal and coke gasification and by reforming natural gas.
Office Location Overland Park, Kansas City - USA Education • B.S. Chemical Engineering
Vice President and Technology Manager
GEORGE GRUBERTECHNOLOGY MANAGER
COAL GASIFICATION
grubergp@bv.com25 Novem
ber 2013
BLACK & VEATCH GASIFICATION FEEDSTOCK EXPERIENCE
•Coal
• Lignite
• Sub‐bituminous
•Waste Coal
•Petroleum Coke
•Biomass
•MSW
PLN Gasification | 25 November 2013
2
25 November 2013PLN Gasification |
BLACK & VEATCH GASIFICATIONCOMMERCIAL GASIFIER EXPERIENCE
• Fixed or Moving Bed: BGL, Lurgi
• Fluid Bed: Lurgi, U‐Gas‐Carbona/SES, Winkler
• Entrained Flow
•Dry Feed: Shell, Siemens (GSP), MHI, Uhde Prenflo
• Slurry Feed: GE, E‐Gas
•Underground Coal Gasification: Ergo Exergy
3
25 November 2013PLN Gasification |
Project ScopeBGLSouth Heart Energy Dev. – Lignite to H2 for IGCC 175 MW net
and 90% CO2 Capture Pre-FEED design & cost estimate
Conoco-Phillips E-GasSempra – Petroleum Coke IGCC Conceptual design & cost estimate
Leucadia – Petroleum Coke Gasification Projects – IGCC, SNG, Methanol, and FT Liquids Owner’s engineer
General Electric (Texaco)Leucadia – Petroleum Coke and Coal Gasification to IGCC,SNG
H2 , Methanol, and FT liquids ProjectsFEED & cost estimateOwners engineer
Power Holdings – Coal Gasification to SNG and Power Pre-FEED design & cost estimate
Sarlux IGCC – Visbroken Tar IGCC 450 MW + Hydrogen Owner’s engineer / lender’s engineer
Farmland - Coffeyville, Kansas – Pet Coke Gasification to NH3 FEED & EPC
REPRESENTATIVE BLACK & VEATCH EXPERIENCEWITH MAJOR GASIFICATION TECHNOLOGY SUPPLIERS
4
25 November 2013PLN Gasification |
Project ScopeShellAEP – Multiple locations - Coal IGCC 550 MW net Conceptual design & cost estimate
NRG– Multiple locations - Coal IGCC 550 MW net Conceptual design & cost estimate
Pacificorp – Rock Springs, Wyoming - Coal IGCC 650 MW Conceptual design & cost estimate
PA Energy – Western Pennsylvania – 840 MW Coal IGCC Conceptual design & cost estimate
Shell Oil – Wyoming – Coal IGCC 630 MW net Conceptual design & cost estimate
Agrium – Kenai, Alaska – Coal Gasification to H2 and IGCC Pre-FEED design & cost estimate
Baard Energy – Wellsville, Ohio – 35,000 BPD Coal to Liquids + 600MW Conceptual design & cost estimate
MHIBasin Electric Power Cooperative – Coal IGCC 660 MW net
with 65% CO2 Capture Conceptual Design Cost Estimate
Uhde PrenfloElcogas – Coal/Coke Gasification IGCC – 300 MW Startup technical support
REPRESENTATIVE BLACK & VEATCH EXPERIENCEWITH MAJOR GASIFICATION TECHNOLOGY SUPPLIERS
5
25 November 2013PLN Gasification |
Project ScopeErgo Exergy Underground Coal GasificationEskom – UCG Syngas Treatment for Gas Turbine Fuel FEED design & cost estimate
AlterNRG/Westinghouse Plasma GasifierSun Energy – New Orleans, Louisiana - Conceptual design & cost estimate
Cemex – RDF to Diesel and Methanol Conceptual design & cost estimate
InEnTec Plasma MelterLakeside Energy – Clorosilane to HCl and Syngas Investors Independent Engineer
US Renewables – MSW to Methanol and Electricity Investors Independent Engineer
Plasco PlasmaAres – MSW to Electricity Investors Independent Engineer
REPRESENTATIVE BLACK & VEATCH EXPERIENCEWITH MAJOR GASIFICATION TECHNOLOGY SUPPLIERS
6
INTEGRATED GASIFICATION COMBINED CYCLE (IGCC)
7
GasificationGas
CoolingGas
ScrubbingAcid Gas Removal
Comb. Turbines
Electric Generators
Sulfur Recovery
WastewaterTreating
Substation T&D
Steam Turbine
Air Separation
Heat Recovery Steam
Generation (HRSG)
Air
Steam or Water
Oxygen
BFW
Water
Saturated Steam
BFW Flue Gas
SuperheatedSteam
Hot TurbineExhaust Gas
Clean Fuel Gas
Salt SulfurSlag
AirExtraction Air
Nitrogen
Black & Veatch is active in all areas
Coal
25 November 2013PLN Gasification |
INDONESIAN COAL CASE STUDY
• Indonesian Coal
•3,500 kcal/kg AR Indonesian coal
•38%w AR moisture
•14%w dry ash
•Gasifier Screening Study found Shell Coal Gasification with High Temperature Heat Recovery highest efficiency and lowest cost.
•Coal dried to 12%w moisture using fluid bed drier or hot inert gas swept coal mill.
25 November 2013PLN Gasification |
INDIA GASIFICATION FACILITY COST OF SYNGAS FROM INDONESIAN COAL
Levelized costofsyngasforthedifferenttechnologyoptionsat50USD/metricton(MT)for3,500kcal/kgIndonesiancoal.
25 November 2013PLN Gasification |
9
13.04
14.59 14.8015.76
‐2
0
2
4
6
8
10
12
14
16
18
Dry Feed COP GE Quench GE Radiant
Levelized
Cost o
f Syngas, USD
/MMBtu GCV Coal
Capital Expenses
Variable O&M Expenses‐w‐ Sulfur Credit
Fixed O&M Expenses
Electricity Costs/Sales
Total Levelized Cost
INDIA GASIFICATION FACILITYCOST OF SNG FROM INDONESIAN COAL
Levelized costofSNGforthedifferenttechnologyoptionswitha50USD/metricton(MT)for3,500kcal/kgIndonesiancoal
25 November 2013PLN Gasification |
10
17.5518.08 18.28 17.73
‐4
‐2
0
2
4
6
8
10
12
14
16
18
20
22
Dry Feed COP GE Quench GE Radiant
Levelized
Cost o
f SNG, U
SD/M
MBtu GCV
Coal
Capital Expenses
Variable O&M Expenses‐w‐ Sulfur Credit
Fixed O&M Expenses
Electricity Costs/Sales
Total Levelized Cost
November 2013CAFEO31 |
COAL GASIFICATION PROCESS DESIGN FOR INDONESIAN COAL – FACTORS INFLUENCING THE SELECTION OF COAL GASIFICATION TECHNOLOGY
Coal Characteristics
The downstream product and application
Plant scale and its reliability
The capital investment (CAPEX)
The operating expenditure
(OPEX)Other related
factors
11
11
• Gasification can produce high value, clean energy products from low quality Indonesian coal.
• Removal of Indonesia subsidies for oil and electricity (forced by decreased oil and gas production) will increase the need for producing internationally competitive alternative energy in Indonesia. Coal gasification to electricity, clean fuels, and high value chemicals has the potential to mitigate this problem and invest in Indonesia.
• Black & Veatch can assist PLN evaluate options for gasifying coal to produce electricity.