Future vision Utilizing Australian experiences in ... · Future vision Utilizing Australian...

Post on 12-Mar-2020

3 views 0 download

Transcript of Future vision Utilizing Australian experiences in ... · Future vision Utilizing Australian...

Defining the 2nd Blueprint for Bangkok Mass Rapid Transit

Future vision

Utilizing Australian experiences in

development of mass rapid transit

network in Bangkok

David Anderson

2

�Current mass transit projects in ANZ

�Resourcing mass transit capability

�Key Challenges

Topics

3

Current Projects

4

Current Projects

Metro Tunnel

Project - Melbourne

Brisbane Cross

River Rail

Airport Rail Link

Perth

Auckland City

Rail Link

Sydney Metro

Stages 1 and 2

5

� 5 new underground

stations

� Twin 9 km rail tunnels

� High capacity signalling

� Future-proofed to cater

for growth with platforms

for longer trains in the

future.

� AJM JV

Metro Tunnel Project - Melbourne

6

Stage 1 – Northwest

� 15 km tunnels

� 4 km elevated section

� 8 new stations

� Opens 2019

Stage 2 – City and South west

Sydney Metro

� 15.5 km tunnels

� 7 new metro stations

� Upgrade to existing lines

� Opens 2024

7

� 5.9km tunnel

�One upgraded and four new underground stations

� Legislation passed end 2016

�Authority being established

Cross River Rail - Brisbane

8

� 7.5 km tunnel

�One surface and two new underground stations

�Due for completion 2020.

Forrestfield Airport Link - Perth

9

Auckland City Rail Link

10

Auckland City Rail Link

11

Resourcing

12

Resourcing

�Migration of key disciplines

13

�Expertise from overseas has worked with local

Australian knowledge

�Collaboration the key for large metro projects

�Design teams in multiple locations.

Collaboration

14

Key Challenges

15

�Meeting Demand Sustainably

�Minimising Disruption

� Integration

�Digital Engineering

Topics

16

�Melbourne is Australia’s fastest-growing city with a

population of 4.4 million expected to grow to

around 8 million people by 2051.

‒ Metro Tunnel Project Business Case

� 1.3m more people in Sydney by 2031

‒ NSW Long Term Transport Master Plan

Meeting Demand Sustainably

17

Crossrail – Key Centres

18

Crossrail

19

London Crossrail Vertical Alignment

20

Minimising Disruption

21

Enabling Works and Utilities

22

Integration

23

Crossrail Benefits

24

Digital Engineering

Follow us on

www.twitter.com/Aurecon

Join us on

www.facebook.com/Aurecon

Watch us on

www.youtube.com/user/AureconGroup

Follow us on

www.instagram.com/Aurecon

Follow us on

www.linkedin.com/company/Aurecon

Follow us on

www.slideshare.net/Aurecon