Defining the 2 nd Blueprint for Bangkok Mass Rapid Transit Future vision Utilizing Australian experiences in development of mass rapid transit network in Bangkok David Anderson

Transcript of Future vision Utilizing Australian experiences in ... · Future vision Utilizing Australian...

Defining the 2nd Blueprint for Bangkok Mass Rapid Transit

Future vision

Utilizing Australian experiences in

development of mass rapid transit

network in Bangkok

David Anderson

2

�Current mass transit projects in ANZ

�Resourcing mass transit capability

�Key Challenges

Topics

3

Current Projects

4

Current Projects

Metro Tunnel

Project - Melbourne

Brisbane Cross

River Rail

Airport Rail Link

Perth

Auckland City

Rail Link

Sydney Metro

Stages 1 and 2

5

� 5 new underground

stations

� Twin 9 km rail tunnels

� High capacity signalling

� Future-proofed to cater

for growth with platforms

for longer trains in the

future.

� AJM JV

Metro Tunnel Project - Melbourne

6

Stage 1 – Northwest

� 15 km tunnels

� 4 km elevated section

� 8 new stations

� Opens 2019

Stage 2 – City and South west

Sydney Metro

� 15.5 km tunnels

� 7 new metro stations

� Upgrade to existing lines

� Opens 2024

7

� 5.9km tunnel

�One upgraded and four new underground stations

� Legislation passed end 2016

�Authority being established

Cross River Rail - Brisbane

8

� 7.5 km tunnel

�One surface and two new underground stations

�Due for completion 2020.

Forrestfield Airport Link - Perth

9

Auckland City Rail Link

10

Auckland City Rail Link

11

Resourcing

12

Resourcing

�Migration of key disciplines

13

�Expertise from overseas has worked with local

Australian knowledge

�Collaboration the key for large metro projects

�Design teams in multiple locations.

Collaboration

14

Key Challenges

15

�Meeting Demand Sustainably

�Minimising Disruption

� Integration

�Digital Engineering

Topics

16

�Melbourne is Australia’s fastest-growing city with a

population of 4.4 million expected to grow to

around 8 million people by 2051.

‒ Metro Tunnel Project Business Case

� 1.3m more people in Sydney by 2031

‒ NSW Long Term Transport Master Plan

Meeting Demand Sustainably

17

Crossrail – Key Centres

18

Crossrail

19

London Crossrail Vertical Alignment

20

Minimising Disruption

21

Enabling Works and Utilities

22

Integration

23

Crossrail Benefits

24

Digital Engineering

Follow us on

www.twitter.com/Aurecon

Join us on

www.facebook.com/Aurecon

Watch us on

www.youtube.com/user/AureconGroup

Follow us on

www.instagram.com/Aurecon

Follow us on

www.linkedin.com/company/Aurecon

Follow us on

www.slideshare.net/Aurecon