Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS.

Post on 30-Dec-2015

214 views 1 download

Tags:

Transcript of Footer Text A Tool for Environmental Scheduling, Accountability and Performance Measurement TxECOS.

Footer Text

A Tool for EnvironmentalScheduling, Accountability andPerformance Measurement

TxECOS

Footer Text

Table of Contents

2

What is TxECOS?

How are things documented in the system?

System Architecture

How was TxECOS built?

Demo

1

2

3

4

5

Training6

Where we’re going7

Questions?8

Footer Text

What is TxECOS?

3

Official File of Record

Project Documentation

Project Decisions

NEPA

Approval

Footer Text

How are things documented in the system?

4

• Tracks, who , when , howTask

• Collects data of technical analysis and reviewsForms

• TxDOT’s environmental commitments to follow pre, during, and post construction EPICs

• Communication and approval with external and internal resource agency approvals.Coordination's

• Allows to store all documents associated to the project digitally in one location Documents

Footer Text

System Architecture

5

Integration links to SQL Replicated Databases

Texas ECOS Application

External Web Server•Middleware

•DOT Java File

•JSP Files

•Java Beans

•Business Logic

Oracle Database Server• DBMS

•Tables

•Packages

•Types

Desktop or Laptop Computers•Internet Browser > URL to Texas ECOS

Internal Server•Data Management

DBMS

Footer Text

Database Interface Diagram

6

Footer Text

Application Architecture

7

Footer Text

How was the system built?

8

Footer Text

TxECOS - Business Analysis Team

9

Footer Text

Demonstration of TXECOS: Login

10

Footer Text

Screen Capture: Communication

11

Footer Text

Screen Capture: Reports

12

Footer Text

Screen Capture: Administration

13

Footer Text

Screen Capture: Search

14

Footer Text

Screen Capture: Projects

15

Footer Text

Screen Capture: Project Definition

16

Footer Text

Screen Capture: Project Definition

17

Footer Text

Screen Capture: Project Definition

18

Footer Text

Screen Capture: Project Definition

19

Footer Text

Screen Capture: Project Definition – Project Associations

20

Footer Text

Screen Capture: Project Summary

21

Footer Text

Screen Capture: Tasks

22

Footer Text

Screen Capture: Forms

23

Footer Text

Screen Capture: Coordination

24

Footer Text

Screen Capture: EPICs

25

Footer Text

Screen Capture: Documents

26

Footer Text

Screen Capture: Journal

27

Footer Text

Training

28

Footer Text

Where are we going?

29

• Update reports to reflect new CE classification types.

• Creating a 8 to 5 work space environment.

• Improved overall performance.

Portability and StandardizationTechnical Functionality & Reporting

Scope Development

• Retire older screening forms and develop a single project level scope form.

• Automate the CE checklist and include new business rules.

• Documents Approval times.

• Measures review times for document clearances.

Portability and StandardizationNew Forms

• Develop GIS viewer to aide in technical analysis.

• Viewer includes agency related tools for analysis – Storm Water, Natural Diversity Database.

• Consume layers and map services from external agencies.

GIS Interface

• Early risk identification.

• Automation of scope development.

• Reduce redundant data entry.

Footer Text

Questions?

30

Footer Text

Contact Information

31

Michael RhodesEnvironmental Specialist,Environmental Affairs DivisionTexas Department of TransportationEmail: Michael.Rhodes@txdot.gov(254) 867-2739 Sai Kolla, PMP®

Business Analyst,Environmental Affairs DivisionTexas Department of TransportationEmail: Skolla-c@txdot.gov (512) 416-2774

Troy D. SykesBusiness Analyst,Environmental Affairs DivisionTexas Department of TransportationEmail: Troy.Sykes@txdot.gov(512) 416-2571