Footer Text
A Tool for EnvironmentalScheduling, Accountability andPerformance Measurement
TxECOS
Footer Text
Table of Contents
2
What is TxECOS?
How are things documented in the system?
System Architecture
How was TxECOS built?
Demo
1
2
3
4
5
Training6
Where we’re going7
Questions?8
Footer Text
What is TxECOS?
3
Official File of Record
Project Documentation
Project Decisions
NEPA
Approval
Footer Text
How are things documented in the system?
4
• Tracks, who , when , howTask
• Collects data of technical analysis and reviewsForms
• TxDOT’s environmental commitments to follow pre, during, and post construction EPICs
• Communication and approval with external and internal resource agency approvals.Coordination's
• Allows to store all documents associated to the project digitally in one location Documents
Footer Text
System Architecture
5
Integration links to SQL Replicated Databases
Texas ECOS Application
External Web Server•Middleware
•DOT Java File
•JSP Files
•Java Beans
•Business Logic
Oracle Database Server• DBMS
•Tables
•Packages
•Types
Desktop or Laptop Computers•Internet Browser > URL to Texas ECOS
Internal Server•Data Management
DBMS
Footer Text
Database Interface Diagram
6
Footer Text
Application Architecture
7
Footer Text
How was the system built?
8
Footer Text
TxECOS - Business Analysis Team
9
Footer Text
Demonstration of TXECOS: Login
10
Footer Text
Screen Capture: Communication
11
Footer Text
Screen Capture: Reports
12
Footer Text
Screen Capture: Administration
13
Footer Text
Screen Capture: Search
14
Footer Text
Screen Capture: Projects
15
Footer Text
Screen Capture: Project Definition
16
Footer Text
Screen Capture: Project Definition
17
Footer Text
Screen Capture: Project Definition
18
Footer Text
Screen Capture: Project Definition
19
Footer Text
Screen Capture: Project Definition – Project Associations
20
Footer Text
Screen Capture: Project Summary
21
Footer Text
Screen Capture: Tasks
22
Footer Text
Screen Capture: Forms
23
Footer Text
Screen Capture: Coordination
24
Footer Text
Screen Capture: EPICs
25
Footer Text
Screen Capture: Documents
26
Footer Text
Screen Capture: Journal
27
Footer Text
Training
28
Footer Text
Where are we going?
29
• Update reports to reflect new CE classification types.
• Creating a 8 to 5 work space environment.
• Improved overall performance.
Portability and StandardizationTechnical Functionality & Reporting
Scope Development
• Retire older screening forms and develop a single project level scope form.
• Automate the CE checklist and include new business rules.
• Documents Approval times.
• Measures review times for document clearances.
Portability and StandardizationNew Forms
• Develop GIS viewer to aide in technical analysis.
• Viewer includes agency related tools for analysis – Storm Water, Natural Diversity Database.
• Consume layers and map services from external agencies.
GIS Interface
• Early risk identification.
• Automation of scope development.
• Reduce redundant data entry.
Footer Text
Questions?
30
Footer Text
Contact Information
31
Michael RhodesEnvironmental Specialist,Environmental Affairs DivisionTexas Department of TransportationEmail: [email protected](254) 867-2739 Sai Kolla, PMP®
Business Analyst,Environmental Affairs DivisionTexas Department of TransportationEmail: [email protected] (512) 416-2774
Troy D. SykesBusiness Analyst,Environmental Affairs DivisionTexas Department of TransportationEmail: [email protected](512) 416-2571