Field Development
Competencies & Services
Technip Germany GmbH
2
Contents
I. Technip Germany
II. Field Development
3
I. Technip Germany
4
Technip Germany Offices
Project Meeting Rooms
TASK FORCEBuildingTECHNIP GERMANY GmbH
Theodorstrasse 9040472 DüsseldorfGermany
5
TPGY Overall Organization
6
TECHNIP GERMANY – Product Portfolio
PROCESS PLANTS MATERIAL HANDLING DISTRIBUTION
• Refining plants• Chemical plants• Petrochemical plants• Gas Oil Separation Plants• Re-injection units
• Sulphur handling• Coke Calcining• Direct reduction iron• Aluminium fluoride
• Pipeline systems• Flow lines• Pressure boosting stations• Gas storages• Field development• Tank farms
SUPPORT TO THE POWER INDUSTRY
• Lifetime monitoring system• Surge analysis• Fluid dynamics• Vibration equalizer• Damage analysis
7
TECHNIP GERMANY – Scope of Services
Studies and Conceptual Design Basic & Detail Design
EPC Implementation
Process optimisation and conceptual engineeringEconomic and financial viability analysisCost - benefit analysisCost estimation and assets evaluationRehabilitation and rationalisation programs
Project managementFEED verification / endorsementDetail designHSE responsibilityProcurement of all materials and equipmentConstruction management
Value engineeringProcess simulationSystem design and hydraulic simulationsCost estimating and tariff calculationOperation and maintenance philosophies
Commissioning & Start-up
Commissioning planning and supervisionCoordination of vendor representativesLoop checksTraining HSE responsibilityAs-build documentationHand over
8
Global Procurement NetworkEPC internet-based procurement system
HoustonLos Angeles
Kuala Lumpur
Aberdeen
ParisRome
Rio de Janeiro
DüsseldorfRegional
Procurement Manager
GlobalProcurement
Officer
Commodity Family
Managers
A worldwide network for increased flexibility and competitiveness
9
II. Field Development
10
Overview
► Field Development and Underground Storage Projects are very similar• Field Development
– In-field lines (multiphase)– Process plant, a real challenge– Export pipelines (gas, oil, condensate, others …)– Re-injection lines (gas and/or water)
• Underground Storage– Withdraw (multiphase, but only gas and water)– Process plant, drying and compression are the main units – Import / Export pipeline (gas)– Injection (gas)
► Very suitable projects for TPGy• TPGy is the pipeline and underground storage
competence center of the TP Group• Process excellence of all TP offices
11
Typical Process Plant for Field Development
12
Underground Gas Storage FacilitiesStorage – Site, above ground installation
13
Underground Gas Storage FacilitiesStorage - Characteristic
Compressor Unit
►Type of Compressor• Turbo compressor• Reciprocating compressor• Centrifugal and axial compressor• Rotary screw compressor
►Arrangement of Engines• Serial• Parallel
►Operation pressure• Inlet: 40 to 80 bar• Outlet: 100 to 220 bar
14
Underground Gas Storage FacilitiesStorage - Characteristic
Drying Unit
►Types of Drying Processes• LTS-system• Molecular sieves• Glycol unit• Vortex technology
►Selection criteria• Impurity of gas• Pressure range at withdrawal
►Dew Points (average)• Water: -8 °C at 70 bar• HC: -2 °C at 70 bar
Adsorption
Twister
Glycol
15
Scope of Services of Technip Germany
16
Technip Germany Expertise and Scope of Services for FD Facilities
• Basic engineering and dehydration studies
• Compressor capacity optimisation
• EPC and EPCM execution models
• Project financing in liaison with EIB, WB, ADB, etc.
• Technip Group global procurement network
• Close relationship to a leading material research institute (MFI)
• Close relationship to gas storage operators
• Preferred access to construction equipment through Maats equipment pool
17
FD References of Technip Germany
18
Field Development (FD) & Underground Storage (UGS)Country Client Type of Contract Product Year
Germany EKB (BP/DONG/ZMB) EPCM UGS 2009 – 2011
Austria OMV FEED UGS 2009
Germany EDF FEED / EPCM UGS 2009 - 2011
France GDF EPCM UGS 2008 – 2014
Belgium Fluxxys Consultancy UGS 2008 - 2010
Iran STATOIL / HYDRO (ANARAN) FEED FD 2007 - 2008
Libya HAROUGE (VEBA OIL) (AMAL) EPC FD 2005 - 2008
Iran HYDRO (AZAR) FEED FD 2006 - 2007
Germany IVG (ETZEL) Conceptual UGS 2006
UAE ADCO (NEB) EPC FD 2003 - 2006
Turkey LURGI (MARMARA) Detail (part) UGS 2004 - 2006
Libya WINTERSHALL (JAKHIRA) EPC (I and II) FD 1998 - 2004
Iran HYDRO (KUSK-HOSSEINIEH) Conceptual FD 2004
UAE ADCO (NEB) FEED FD 2002
Turkmenistan TURKMENNEFTEGAS EPC FD 1997 - 1998
(KAMYSHLDSHA)
Romania ROMGAZ Feasibility UGS 1997
Germany STATOIL (ETZEL) EPC UGS 1991 - 1994
Germany SW SINGEN (SINGEN) EPC UGS 1994
Germany SGW AHAUS (EPE) EPC UGS 1987 - 1990
Germany SW BRETTEN (BRETTEN) EPC UGS 1989
19
Technip References in Field Development
ROZENBURGNetherlands
STEIPERNorway
PARENTISFrance
VAL D’AGRIItaly
HEIMDAL N.SEANorway
MORECAMBEIrish Sea
FRIGGNorth Sea UK
GARUPABrazil
NEUQUENArgentina
JUSEPINVenezuela
HIDRAArgentina
HOBBSNew Mexico
STEELMANCanada
WEST PEMBINACanada
KEG RIVERCanada
SOUTH RAINBOWCanada
BATTLE LAKECanada
MISTOregon
GILBYCanada
WHITECOURTCanada
LUMUTBrunei
MANNAPADIndia
MALAMPAYAPhilippines
TERRENGANUMalaysia
PORT HEDLANDAustralia
BINTULU Sarawak
LABUANMalaysiaMANGISTU
Kazakhstan
ASTRAKHAN 1Russia
ORENBURG 3Russia
ORENBURG 2Russia
ORENBURG 1Russia
FYODOROVSKRussia
SAMOTLORRussia
ASTRAKHAN 2Russia
CabindaAngola
WAMBA NUMBIAngola
WAFA MELITAHLibya
SKIKDAAlgeria
BONNY ISLANDNigeria
EL BORMATunisia
ARZEWAlgeria
COBO PAMBIAngola
N’KOSSACongo
ZAKUMAbu Dhabi
ASABAbu Dhabi
EL ISBASyria
KHALDA WEST Egypt
NORTH FIELD 2Qatar
AHMADHIKuwait
ZIRKUAbu Dhabi
KHABAZIraq
HABSHANAbu Dhabi
SOUTH PARSIran
MESSAIEEDQatar
BURGANKuwait
NORTH FIELD 1Qatar
HARADHSaudi Arabia
SHAH FIELDAbu Dhabi
ABU EL BUKHOSHlAbu Dhabi
ASSALUYEHIran
WEST QURMAIraq
OVER 100REFERENCES
OVER 100REFERENCES
20
Field Development - FEED - Iran ANARAN - Field Development Project
► Contract Award:• August 2007
► Completion Date:• May 2008
► Client:• STATOIL HYDRO, Norway
► Contract Value:• Approx. 5 mio. €
► Scope of Work: FEED• Phase A Reimbursable Rates
Phase B Lump Sum• FEED for an Oil and Gas Field Development
in Iran, including In-field Lines, GOSP, Export Pipelines and Cost estimation +/-10%.
21
Field Development - FEED - Iran AZAR - Oil and Gas Field Development
► Contract Award:• June 2006
► Completion Date:• February 2007
► Client:• HYDRO, Norway
► Contract Value:• Approx. 5 mio. €
► Scope of Work: LSTK – FEED• FEED including Familiarization Phase for an
Oil and Gas Field Development in Iran, including In-field Lines, GOSP and Export Pipelines.
22
Field Development - Study - Algeria HOGGAR - Oil and Gas Field Development
► Contract Award:• August 2006
► Completion Date:• September 2006
► Client:• EON
► Scope of Work:• Pre-feasibility Study including CAPEX
Calculation for an Oil and Gas Field Development in Algeria, including In-field Lines, GOSP and Export Pipelines.
23
Field Development - EPC - Libya AMAL - Produced Water Treatment & Injection Plant
► Contract Award:• 2005
► Completion Date:• PAC 2008
► Client:• Harouge Oil Operations (formerly Veba Oil
Operations) / Libya • Bonatti / Italy
► Contract Value:• 30 mio. €
► Scope of Work: LSTK – EPC:• Produced Water Treatment Plant / Low and
High Pressure System including Induced Gas Flotation, Filtration, Transfer and High Pressure Pumps and P/L (24,000 BPD Water Stream) in Libya.
• 41 km; 6” - 10”; Grade B - X52
24
Field Development - EPC - UAE NEB - North East BAB - Oil Field Development (Phase 1)
► Contract Award:• May 2003
► Completion Date:• Mechanical Completion December 2005
► Client:• Abu Dhabi Company for Onshore Oil
Operations (ADCO), UAE
► Contract Value:• 153 mio. US $
► Scope of Work: LSTK – EPC• Oil Production from two Fields, Al Dabb‘iya
(Offshore) Shallow Water / Sabkhat and Rumaitha (Onshore) Desert Area includingnew Central Processing Plants (CPP) in UAETechnip Germany Scope:Pipelines / Flowlines (~530 km / 3”-20” Off-/ Onshore), Electrical Works along the Pipe Route
25
Field Development - EPC - LybiaJAKHIRA - Gas Utilization Plant
► Contract Award:• Phase 1: 1998• Phase 2: 2002
► Completion Date:• Phase 1: 2001• Phase 2: 2004
► Client:• Wintershall AG, Germany
► Contract Value:• 130 mio. DM
► Scope of Work: LSTK - EPC• Gas Separation Plant / Ethane Separation
including Compression Stabilization, Dehydration, Fractionation and Export (125,000 Nm³ Feed Gas Stream).