The El-Borma ISCCS Case Study - German Aerospace Center
Transcript of The El-Borma ISCCS Case Study - German Aerospace Center
![Page 1: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/1.jpg)
Towards a Sustainable Implementation of Solar Thermal Power Plants Technology in the MENA
www.dlr.de/enerMENA
The El-Borma ISCCS Case StudyMatthias Günther, Jürgen Dersch, Thomas Fend, (DLR)
The Joint German-Jordanian Workshop 2012Amman February 27th – 29th
![Page 2: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/2.jpg)
Slide 2 www.dlr.de/enerMENA
Outline
1. The El Borma Oil-Field and its Current Power Supply
3. Methodology
2. The Future Concept
4. Results
5. Conclusions
![Page 3: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/3.jpg)
Slide 3 www.dlr.de/enerMENA
The El Borma Oilfield
‐ utilization since 1966 (peak extraction 1985: 70 Tb/d, today: 10 Tb/d)
‐ 2010 concession extended to 2043
‐ binational oilfield in Tunisia and Algeria
‐ biggest one in Tunisia
‐ electricity supply with own power station
‐ secondary extraction
![Page 4: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/4.jpg)
Slide 4 www.dlr.de/enerMENA
The El Borma Oilfield
![Page 5: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/5.jpg)
Slide 5 www.dlr.de/enerMENA
Stakeholders
STEG (Société Tunisienne d’Electricité et du Gaz)
national utility
STEG ER (STEG Energies Renouvelables)
SITEP (Société Italo‐Tunisienne d’Exploitation Pétrolière)
Founded in May 2010, co‐ordinates the Tunisian Solar
Plan
operating company, belongs to ENI and the state of
Tunisia
ENI
Italian Oil and Gas enterprise
![Page 6: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/6.jpg)
Slide 6 www.dlr.de/enerMENA
The Existing Power Supply
‐ commissioning: 1979/1980 (Fiat)
‐ 3 gas turbines à 13,5 MW(2 in operation, 1 in stand‐by)
‐ efficiency: 20‐21%
11 kV‐Grid with 114 km total length
![Page 7: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/7.jpg)
oil pumps55%
water injectionpumps28%
STEG (gas‐conditioning and ‐transport) 8%
misc. (lightning, AC, kitchens etc.) 8,5%
other companies0,5%
Slide 7 www.dlr.de/enerMENA
Consumers (2009)
![Page 8: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/8.jpg)
Slide 8 www.dlr.de/enerMENA
Load Distribution (2009)
‐ low seasonal differences
‐ low daily variation
0
5000
10000
15000
20000
1 2 3 4 5 6 7 8 9 10 11 12Monat
Gasverbrauch [1000 Nm3]
elektrische Energie [MWh]
mittlere Leistung [kW]
gaselectricityaverage power
![Page 9: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/9.jpg)
Slide 9 www.dlr.de/enerMENA
1. The El Borma Oil-Field and its Current Power Supply
3. Methodology
2. The Future Concept
4. Results
5. Conclusions
![Page 10: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/10.jpg)
Slide 10 www.dlr.de/enerMENA
Future Plans for the El Borma Electricity Supply
good DNI conditions
32 year old plant
possible costs for future gas consumption
low efficiency
interest for modernization of the plant
economic powerful actors
El Borma plant joins Tunisian Solar Plan as a CSP‐reference project
Overall objective of the Tunisian Government to force the development of RE and to ncrease the efficiency (Tunisian Solar Plan)
good site for CSP‐project
![Page 11: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/11.jpg)
Slide 11 www.dlr.de/enerMENA
The ISCCS El Borma as part of the Tunisian Solar Plan
40 Projects in 5 groups:
1. Solar Energy (17)
2. Wind Energy (3)
3. Energy efficiency (7)
4. others (7)
5. Studies and realization
of the TSP (6)
TSP:
![Page 12: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/12.jpg)
Slide 12 www.dlr.de/enerMENA
Future Power Requirements
present maximum load of the El Borma Oil field
additional demand STEG (expansion of the gas‐pipeline capacities)
ENI‘s additional demand for a second oil‐field
22 MW
+ 8 MW
+ 13 MW
43 MW
![Page 13: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/13.jpg)
1. The El Borma Oil-Field and its Current Power Supply
3. Methodology
2. The Future Concept
4. Results
5. Conclusions
![Page 14: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/14.jpg)
Slide 14 www.dlr.de/enerMENA
Parabolic Trough or Solar Tower?
‐ total power: 43 MW
‐maximum solar contribution: 5 MWel
Calculation of the fuel savings by the generation of solar heat and
solar generated electricity
Preconditions:‐ ISCCS with solar input into steam cycle
comparison of tower or trough solution
![Page 15: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/15.jpg)
Slide 15 www.dlr.de/enerMENA
ISCCS‐Configurationsolare backing of the evaporator parallel solar generation of live steam
solar superheating needs high temperatures
point focussing systems, direct steam generating parabolic trough or trough with salt as a HTM
![Page 16: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/16.jpg)
Slide 16 www.dlr.de/enerMENA
ISCCS‐Configuration
El Borma: solar evaporation and
superheating
parallel solar generation of live steam
solar superheating needs high temperatures
point focussing systems, direct steam generating parabolic trough or trough with salt as a HTM
![Page 17: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/17.jpg)
Slide 17 www.dlr.de/enerMENA
‐ solar tower with open
volumetric air receiver
‐ direct steam trough
steam parameter:
‐ 440°C
‐ 45 bar
Slide 17 www.dlr.de/enerMENA
ISCCS‐Configurationparallel solar generation of live steam
solar superheating needs high temperatures
point focussing systems, direct steam generating parabolic trough or trough with salt as a HTM
El Borma: solar evaporation and
superheating
![Page 18: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/18.jpg)
Methodology
• comparison of the annual fuel consumptions 43 kW ISCCS trough43 kW ISCCS tower43 kW CC conventional
• calculation of Fuel Save in the two ISCC• solar electricty = output of reference CC with saved fuel• time resolution: 1h
![Page 19: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/19.jpg)
Slide 19 www.dlr.de/enerMENA
‐ annual calculation in Greenius (DLR)
‐modeling of the CC with Ebsilon Professional‐ calculation of operating points ‐ interpolation for use in Greenius
‐meteoroloical data by Meteonorm
‐ lay‐out of the solar fields + receivers ‐maximum solar thermal power: 20 MWth ‐ energ dumping 5% of solar thermal power)
Methodology
![Page 20: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/20.jpg)
Slide 20 www.dlr.de/enerMENA
Meteo data: DNI
DNI: 1814 kWh/m2/y
![Page 21: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/21.jpg)
Slide 21 www.dlr.de/enerMENA
Power Plant Flow Chart (Ebsilon)
![Page 22: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/22.jpg)
Slide 22 www.dlr.de/enerMENA
Calculation of the Operating Points (Ebsilon)
opertaing points defined by: ‐ ambient temperatur
‐ solar field thermal power
‐ plant power
paramters calculated:
‐ GT load
‐ solar electrical power
‐ auxiliaries
- fuel consumption‐ feed water return
temperatur (to solar
field)
![Page 23: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/23.jpg)
Slide 23 www.dlr.de/enerMENA
Lay‐Out of the Solar Field: Parabolic Trough
solar field maximum thermal power: 20 MWth
data of Eurotrough II collector used
14 Loops
![Page 24: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/24.jpg)
Slide 24 www.dlr.de/enerMENA
interpolation within implemented field models (dependent on thermal power and geographical lattitude)
Lay‐Out of the Solar Field: Heliostats
solar field maximum thermal power: 20 MWth
![Page 25: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/25.jpg)
Slide 25 www.dlr.de/enerMENA
field‐intercept 31,3 MW
Receiver‐Intercept 26,6 MW
air outlet temperatur: 500°C
Lay‐Out of the Solar Field: Heliostats
solar field maximum thermal power: 20 MWth
![Page 26: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/26.jpg)
Slide 26 www.dlr.de/enerMENA
1. The El Borma Oil-Field and its Current Power Supply
3. Methodology
2. The Future Concept
4. Results
5. Conclusions
![Page 27: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/27.jpg)
Slide 27 www.dlr.de/enerMENA
Results I
trough tower
fuelsave MWhth 21883 21935
t 1575 1579
% 2,72 2,72
trough tower
solargeneratedelectricity
MWhel 10250 10273
% 2,72 2,73
![Page 28: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/28.jpg)
Slide 28 www.dlr.de/enerMENA
Results II
trough tower deviationtroughvs.tower
aperturearea m2 45780 46862 2,36%
mirrorarea m2 50458 46862 ‐7,13%
solarheatMWhth 39376 39036 ‐0,86%
fossilheatMWhth 783490 783439 ‐0,006%
dumping MWh 2001 2047 2,30%
groundareasolarfield ha 16 23 44%
![Page 29: The El-Borma ISCCS Case Study - German Aerospace Center](https://reader031.fdocuments.in/reader031/viewer/2022012103/61dbe41eaa0031485707cc40/html5/thumbnails/29.jpg)
Slide 29 www.dlr.de/enerMENA
Conclusions
‐ no significant differnces tower/trough(fuel save, solar generated electricity)
‐ economic criteria, reliability and experience
‐ economic comparison difficult (small, young and discontinous cspmarkets)
‐ trough technology more mature but not with direct steam (one new commercial plant in Thailand + one test plant, Spain)
‐ significant difference: solar field size (not of major interest at this site)