Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2a.

Post on 12-Dec-2015

215 views 2 download

Transcript of Fast Timing Workshop Krakow, Nov 29 - Dec 1 st 2010 Part 2a.

Fast Timing WorkshopKrakow, Nov 29 - Dec 1st 2010

Part 2a

2

Gary Varner

3

Gary Varner

4

ANITA

• RF Transient (impulsive) Events (200‐1200 MHz) (200 1200 MHz) • 324 chan. @ 2.6GSa/s • Completely solar powered Completely solar powered (tight demands on power, few hundred W total) • Need full waveforms

Gary Varner

5

Gary Varner

6

Gary Varner Design Choices

• Input coupling – Differential versus single-ended input – Needed analog bandwidth – Gain needed?

• Sampling Options – On‐chip PLL/DLL – External DLL – Analog transfer vs interrogate in situ

• ADC and readout options • ADC and readout options – Sequential output select vs random access – On‐chip vs. off‐chip ADC – Serial, parallel, massively parallel

7

Gary Varner Constraints

- Analog Bandwidth - Switching noise- Leakage current- Deeper sampling

Extensive radio array for UHE neutrinos- Super B Factory

PID Upgrade – precision timing

8

Gary Varner

Design Choices

- Input coupling: diff-s ended, ABW, Gain ?- Sampling options: On-chip PLL/DLL, analog transfer decision

ADC and readout options: On/off-chip, serial/parallel

ABW: C sampling is killing (typ (50 fF x 4k=50pF=10 ns)kT/C noise: 78 fF = 12 bitsLeakage current: Increase C or reduce conversion time: fA → nANDR: even worse in Deep Sub-Micron

Sampling depth: application dependent

ANITA-I

9

Gary VarnerANITA

10

Gary Varner

11

Gary Varner

12

Gary Varner

13

Gary Varner

14

Gary Varner

15

Gary Varner

16

Gary Varner IRS/Blab3 chips

17

Gary Varner

18

Gary Varner Blab 1

19

Gary Varner Blab1 chip

20

Gary Varner (IRS chip)

21

Gary Varner (Belle2 Upgrade)

22

Gary Varner HPK SL10

23

Gary Varner

24

Gary Varner

25

Miroslav Firlej, Jakub Moron, Marek IdzikAGH University, Poland

(University for Mining)

Development of fast transceivers for serialcommunication and general purpose PLLblock

Possible applications :

– Fast data transmission for the luminosity detector readout at the ILC

Multiplexed readout of multi-channel ADC PLL or DLL based timing for HEP experiments CMOS 350nm

26

Miroslav Firlej, Jakub Moron, Marek Idzik

27

Miroslav Firlej, Jakub Moron, Marek Idzik

• Second order Phase Locked Loop • “Current starved” VCO

PLL: 1st PLL: – 120MHz, 240MHz, 480MHz and 960MHz 2nd PLL: – One mode (~1GHz), wide frequency range

Low power ~4 mW

Clock and Data Recovery Burst mode CDR (two extra VCO steered by data signal

levels) Every change on data signal line restarts clock generation

with fixed phase shift Data recovery – removes noise and sharpens data slopes

Simple decision circuit with D flip- flop

28

Miroslav Firlej, Jakub Moron, Marek Idzik

29

Miroslav Firlej, Jakub Moron, Marek Idzik

• Short term plans:

– DLL based transmitter for multichannel ADC in AMS 0.35 μm

– Low power fast (about 1GHz) transceiver in AMS 0.35 μm for

LumiCal data transmission

• Longer term plans:

30

Gary Varner, Kurtis Nishimura, Matt AndrewFirst detector and DAQ test results from

the Univ Hawaii picosecond xray beamline

FEL = very tight bunch specs ~ 1ps timing probe

31

Gary Varner, Kurtis Nishimura, Matt Andrew

32

Gary Varner, Kurtis Nishimura, Matt Andrew

Summary

Access to multi‐project infrastructure (radio‐neutrino, FEL x‐rays, Super KEKB upgrade...) • Test beamline in Watanabe Hall commissioned Fall 2010 • intense flux ~1ps timing • Run ~ 8hrs/week, very easy access • Very nice facilities for • GHz ASIC input coupling, toward 1ps timing studies • ps vacuum, solid‐state detector studies • Integrated (~100 GB/s sustained, TB/s inst.) readout • Fast feature/processing/histogramming • Very easy “Experiment Proposal” procedure...

33

Gary Varner, Kurtis Nishimura, Matt Andrew

34

Gary Varner, Kurtis Nishimura, Matt Andrew

Phase II:Tunable, mono‐chromatic x‐ray Source

Stabilized optical storage cavity

Tests of new detectors: 3D, new chips

35

Gary Varner, Kurtis Nishimura, Matt Andrew

36

Gary Varner, Kurtis Nishimura, Matt Andrew

IRS input couplingPilas pulsed laser, gain with a mini-circuit amp, 20 GS/sTek digital scopeTest HPK SL10 MCP + baseCrosstalk tests

37

Gary Varner, Kurtis Nishimura, Matt Andrew

38

Gary Varner, Kurtis Nishimura, Matt Andrew