Post on 22-Dec-2015
EV CONTAINER CORPORATION- REVOLUTIONIZING THE BEVERAGE INDUSTRY
Copyright @ EV Container Corporation
EV
EVkeg Purge & Fill for Brewers
EVKeg Purge – seal check & liner deployment
- Set up a line with a resitance valve on the coupler outlet as shown- Open the keg valve and purge the keg
Copyright @ EV Container Corporation
EVKeg Purge – seal check & liner deployment
- Shut the outlet valve. The back pressure build up will open the liner in the keg- Once the liner is deployed, pressure will rise in the keg to the regulator set pressure- Shut off the cylinder valve. If the keg holds pressure the fitment seal is functional
Copyright @ EV Container Corporation
EVKeg Purge – seal check & liner deployment
- If pressure is lost, carefully remove the handle and reset the fitment seal
Copyright @ EV Container Corporation
EVKeg Fill - Shut off the keg valve to hold the CO2 in the keg- Connect the fill coupler with a resistance valve and open the valve- Maintain a small back pressure on the outlet to ensure the liner remains deployed
during filling
Copyright @ EV Container Corporation
EVKeg Fill - When the liner is deployed and fully supported by the keg walls, the keg can be
pressurized to the full operating pressure of 45PSI.
Copyright @ EV Container Corporation
EVkeg – contact us
www.evcontainer.com
EV Container Corporation2148 Beechcraft Road
Unit 300VacavilleCA 95688
415-460-5341
Copyright @ EV Container Corporation