Alexandre Neto

22/10/2014

eSTORAGE - WP2_T2.3: PSP Dispatching Solution Workshop

London

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 2

• The eSTORAGE project context

• Smart Dispatch for var-speed PSP

• Demonstration

• Q&A

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 3

The eSTORAGE WBS

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 4

WP2 - Smart Energy Network & IT Tools

WP2 objectives:

• Implement new market rules and associated incentives schemes related to

storage in a context of large renewable resources integration – T2.1 and T2.2

• Demonstrate the criticality of IT tools in enabling the deployment and efficient

use of storage systems in the framework of Smart Energy Networks – T2.3

Task 2.3 - Smart Dispatch Storage PSP

The intent within this task is to use smarter scheduling and dispatch techniques to

take advantage of variable-speed PSP assets, with the objective of providing as

much balancing flexibility as possible while meeting the main energy storage target

(i.e. energy transfer target)

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 5

• The eSTORAGE project context

• Smart Dispatch for var-speed PSP

• Demonstration

• Q&A

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 6

From day-ahead to real-time…

BRP Energy Balance

Automatic

Generation

Control

time

BRP

deviations

time

MW

Unit

commitment

& scheduling

Intraday Plant &

Storage Optimization

MW

Assets minute-

based

trajectories

Realization

time

MW

NOW

TSO

time

MW

NOW

Secondary

Regulation

S

C

A

D

A

telemetry

controls

Entities

scheduling

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 7

Very-short term optimization IPSO/AGC for real-time generation management

SCADA processes the measurements 2 sec

AGC calculates & sends Generation Targets 4 sec

(conf)

5 min

(conf) IPSO defines minute-based schedules

Time Framework

Look-ahead scheduling for a better anticipation

Reacting quickly to real-time situation

Using latest generation plan

Using latest energy market calls

Using latest AS market contracts

Using latest intermittent generation forecast

Using real-time unit position and status

Using actual imbalance position

Using actual secondary regulation call

IPSO

AGC

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 8

Intraday Plant and Storage Optimisation

Specifically designed to meet trading period

balancing requirements (5, 10, 15, … minutes)

Defines the least-cost strategy on a minute

basis to balance generation and load over each

trading period

Avoids imbalances in the trading period

Deals with ancillary services obligation

Keep room for regulation/reserve when

contracted

Deals with unit technical constraints

Enforces technical limits, ramp rate, forbidden

zones, …

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 9

Main Unit Technical Constraints

time

MW

Pmin

Pmax

Forbidden zone

Ramp rate constraint

Min switch time

constraint

Pmin

Forbidden zone

Pmax

Generation

Pumping

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 10

• The eSTORAGE project context

• Smart Dispatch for var-speed PSP

• Demonstration

• Q&A

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 11

DEMO Part 1 – Base Case

Available Power Units

• 2 var-speed PSP

Demand of +/- 20 MW of regulation (Frequency

Restauration Reserve)

Schedule including generation to pump switch in unit 1

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 12

DEMO Part 2.1 – Wind curtailment

Available Power Units

• 1 Wind park

• 1 Gaz Turbine

• 1 fixed speed PSP

Demand of +/- 20 MW of regulation (Frequency

Restauration Reserve)

Wind forecast error of 43 MWh (net) in 4 hours

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 13

DEMO Part 2.2 – Wind curtailment

Available Power Units

• 1 Wind park

• 1 Gaz Turbine

• 1 fixed speed PSP

Demand of +/- 20 MW of regulation (Frequency

Restauration Reserve)

Wind forecast error of 393 MWh (net) in 4 hours

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 14

DEMO Part 2.3 – Wind curtailment

Available Power Units

• 1 Wind park

• 1 Gaz Turbine

• 1 var-speed PSP

Demand of +/- 20 MW of regulation (Frequency

Restauration Reserve)

Wind forecast error of 393 MWh (net) in 4 hours

© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

Network Management Solutions - 22-Oct-14 – P 15

• The eSTORAGE project context

• Smart Dispatch for var-speed PSP

• Demonstration

• Q&A