© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 2
• The eSTORAGE project context
• Smart Dispatch for var-speed PSP
• Demonstration
• Q&A
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 3
The eSTORAGE WBS
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 4
WP2 - Smart Energy Network & IT Tools
WP2 objectives:
• Implement new market rules and associated incentives schemes related to
storage in a context of large renewable resources integration – T2.1 and T2.2
• Demonstrate the criticality of IT tools in enabling the deployment and efficient
use of storage systems in the framework of Smart Energy Networks – T2.3
Task 2.3 - Smart Dispatch Storage PSP
The intent within this task is to use smarter scheduling and dispatch techniques to
take advantage of variable-speed PSP assets, with the objective of providing as
much balancing flexibility as possible while meeting the main energy storage target
(i.e. energy transfer target)
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 5
• The eSTORAGE project context
• Smart Dispatch for var-speed PSP
• Demonstration
• Q&A
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 6
From day-ahead to real-time…
BRP Energy Balance
Automatic
Generation
Control
time
BRP
deviations
time
MW
Unit
commitment
& scheduling
Intraday Plant &
Storage Optimization
MW
Assets minute-
based
trajectories
Realization
time
MW
NOW
TSO
time
MW
NOW
Secondary
Regulation
S
C
A
D
A
telemetry
controls
Entities
scheduling
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 7
Very-short term optimization IPSO/AGC for real-time generation management
SCADA processes the measurements 2 sec
AGC calculates & sends Generation Targets 4 sec
(conf)
5 min
(conf) IPSO defines minute-based schedules
Time Framework
Look-ahead scheduling for a better anticipation
Reacting quickly to real-time situation
Using latest generation plan
Using latest energy market calls
Using latest AS market contracts
Using latest intermittent generation forecast
Using real-time unit position and status
Using actual imbalance position
Using actual secondary regulation call
IPSO
AGC
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 8
Intraday Plant and Storage Optimisation
Specifically designed to meet trading period
balancing requirements (5, 10, 15, … minutes)
Defines the least-cost strategy on a minute
basis to balance generation and load over each
trading period
Avoids imbalances in the trading period
Deals with ancillary services obligation
Keep room for regulation/reserve when
contracted
Deals with unit technical constraints
Enforces technical limits, ramp rate, forbidden
zones, …
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 9
Main Unit Technical Constraints
time
MW
Pmin
Pmax
Forbidden zone
Ramp rate constraint
Min switch time
constraint
Pmin
Forbidden zone
Pmax
Generation
Pumping
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 10
• The eSTORAGE project context
• Smart Dispatch for var-speed PSP
• Demonstration
• Q&A
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 11
DEMO Part 1 – Base Case
Available Power Units
• 2 var-speed PSP
Demand of +/- 20 MW of regulation (Frequency
Restauration Reserve)
Schedule including generation to pump switch in unit 1
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 12
DEMO Part 2.1 – Wind curtailment
Available Power Units
• 1 Wind park
• 1 Gaz Turbine
• 1 fixed speed PSP
Demand of +/- 20 MW of regulation (Frequency
Restauration Reserve)
Wind forecast error of 43 MWh (net) in 4 hours
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 13
DEMO Part 2.2 – Wind curtailment
Available Power Units
• 1 Wind park
• 1 Gaz Turbine
• 1 fixed speed PSP
Demand of +/- 20 MW of regulation (Frequency
Restauration Reserve)
Wind forecast error of 393 MWh (net) in 4 hours
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 14
DEMO Part 2.3 – Wind curtailment
Available Power Units
• 1 Wind park
• 1 Gaz Turbine
• 1 var-speed PSP
Demand of +/- 20 MW of regulation (Frequency
Restauration Reserve)
Wind forecast error of 393 MWh (net) in 4 hours
© ALSTOM 2014. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.
Network Management Solutions - 22-Oct-14 – P 15
• The eSTORAGE project context
• Smart Dispatch for var-speed PSP
• Demonstration
• Q&A
www.alstom.com