EQUIPMENT SELECTION
1
CONTENTS:
INTRODUCTION
PURCHASE SPECIFICATIONS
EQUIPMENT SELECTION
CLEANING
MAINTENANCE
2
INTRODUCTION:
CONCEPT OF 5 “M” MEN METHOD
MATERIAL MONEY MACHINERY
“EQUIPMENT USED IN MANUFACTURING, PROCESSING,PACKAGING OR HOLDING PRODUCT SHALL BE OF APPROPRIATE DESIGN, ADEQUATE SIZE & SUITABLY LOCATED TO FACILITATE OPERATION FOR IT’S INTENDED USE & FOR IT’S CLEANING & MAINTENANCE”
3
PURCHASE SPECIFICATIONS:
i. OPERATING CRITERIA
ii. AVAILABILITY OF SPARES & SERVICING
iii. MAINTENANCE
iv. ENVIRONMENTAL ISSUES
v. CONSTRUCTION MATERIAL & DESIGN
vi. SPECIAL FEATURES
vii. COST
4
EQUIPMENT SELECTION
HARDWARE REQUIREMENT
SOFTWARE REQUIREMENT
5
HARDWARE REQUIREMENTS:
1. PRINCIPLE OF OPERATION
2. MATERIAL OF CONSTRUCTION
3. EQUIPMENT CONFIGURATION
4. BATTERY LIMITS
5. UTILITIES & SERVICES
6
SOFTWARE REQUIREMENTS:
1.TRAINING
2.MAINTENANCE
3.VALIDATION & QUALIFICATION REQUIREMENTS
4.PERFORMANCE GURANTEE
5.DOCUMENTATION
7
COMMON STEPS INVOLVED FOR CLEANING
REMOVE THE LABLESWITH THE HELP OFBRUSH & REMOVEPRODUCT RESIDUE
DISASSEMBLE & CLEANDISASSEMBLE PARTSWITH BRUSH
WASH WITH SOAP &CLEAN WATER
DRAIN OUT WATER &DRY IN CLEAN AREA
IF NECESSARY STERALIZE WITH70% ALCOHOL ORWITH SUITABLE DISINFECTANT
AFTER DRYING ASSENBLE THE EQUIPMENT
8
MAINTENANCE:EQUIPMENTASSESSMENT
NEW EQUIPMENT INPUT TO SYSTEM
PREVENTIVE MAINTENANCE ORCORRECTIVE MAINTENANCE
ABNORMAL CONDITION
RECORD MAINTENANCE INFORMATIONAND ADD TO HISTORY
NOTIFICATION REPORT
YES
NO
9