EPA Consent Decree HRSD Commission Briefing January 25, 2011€¦ · EPA Consent Decree Annual...

Post on 18-Oct-2020

0 views 0 download

Transcript of EPA Consent Decree HRSD Commission Briefing January 25, 2011€¦ · EPA Consent Decree Annual...

EPA Consent DecreeAnnual Information Meeting

Regional Wet Weather Management Plan

January 25, 2011

Requirements of the Consent Decree• “…after providing reasonable notice on its

webpage and in a newspaper of general circulation”

• “…shall hold an annual informational meeting open to the Localities and the public”

• “HRSD shall convey information on the status of the RWWMP, HRSD – Locality cooperation and steps citizens within the Localities can take to protect the receiving waters”

Annual Public Meeting

2

3

Objective of the Consent Decree

• “HRSD, working in coordination with the Localities, to fulfill the objectives of the Clean Water Act with a goal of eliminating Sanitary Sewer Overflows (SSOs)”

• The Regional Wet Weather Management Plan (RWWMP) will establish the Level of Service for elimination of SSOs

4

HRSD and the Regional Sewer System

• Regional Network– 1.6 million served– 5,800 miles of gravity sewer– 1,500 pump stations– 1,200 miles of force main

• HRSD System– ~ 430 miles of large

diameter force main– ~ 50 miles of gravity sewer– 81 pump stations– 13 treatment plants

• Localities in State Order– Chesapeake– Hampton– Newport News– Poquoson– Portsmouth– Suffolk– Virginia Beach– Norfolk– Williamsburg– Gloucester– Isle of Wight– York– James City Service Authority– Smithfield

5

Regional Sanitary Sewer System

HRSDTreatment Plant

CityPumpStation

Manhole

City CollectionSystem

HRSD InterceptorSystem

HRSD Pump Station

• Participants include EPA, DEQ and localities• Twice per year in quarters when annual or

semiannual reports are not due (July and January)

• Second briefing held on January 19, 2011

Quarterly Briefing

6

• Region is in compliance with DEQ Special Order by Consent

• Federal Consent Decree was entered with the court on February 23, 2010

• All Consent Decree required submittals have been on time

Overall Regulatory Status

7

• Flow, Pressure and Rainfall Monitoring• Regional Hydraulic Model and Assessment• Condition Assessment Plan• Interim System Improvements• Management, Operations and Maintenance

(MOM)• RWWMP• Post RWWMP Implementation Monitoring

and Performance Assessment

Major Consent Decree Compliance Requirements

8

State Consent Order Overview

9

Data Collection and Flow

Monitoring

• SSO characterization• Use of existing

information• System mapping• Flow monitoring

procedures• Rainfall monitoring• Sewer flow

evaluation• Flow evaluation

reporting

SSES Planning

• SSES Basin criteria• Prioritization

Hydraulic Performance Assessment

• Guidelines for development and application of hydraulic model

• Procedures and standards for calibration and verification

Condition Assessment of

Sewers and Pump Stations

• Guidelines for condition assessment

• Assessment standards

• Reporting requirements

• Find and fix guidelines

Rehabilitation Planning

• Rehabilitation resulting from SSES work

• Evaluation of effectiveness of rehabilitation on I/I reduction

Regional Wet Weather

Management Plan Development

• Capacity assessment• Level of service

selection• Capacity

enhancement solutions

• Affordability

• Extensive Flow, Pressure and Rainfall Network (greater than 360 measurement instruments) operational since March 12, 2010

• Data Quality Assurance Program is in place• Interim Flow Monitoring Report was

submitted on September 12, 2010 for first five months of data

Regional Data Collection Efforts

10

• Initial Regional Hydraulic Model Report submitted to EPA/DEQ on November 30, 2010

• Calibration is using rain events from March, May and September

• Regional Hydraulic Model Report due July 31, 2011

• Intensive coordination with localities on model inputs

Regional Hydraulic Model

11

• Preliminary Condition Assessment Report approved by EPA

• Program is well underway – four inspection and repair contracts awarded with total value of $10.8 million

• Gravity main inspection is on schedule and nearing completion

• Force main inspection is underway, some challenges to date

• Prompt Repair contract is in place to address severe defects

Condition Assessment Program

12

• Consent Decree includes requirement to complete 33 CIP projects totaling $140 million by February 23, 2018. Current status:– 4 complete $ 9 million– 7 under construction $39 million– 15 under design $89 million– 2 in study phase $4.6 million– 5 not started $23 million

Interim System Improvements

13

• Response to latest comments is due February 5, 2011

• Implementation of enhancements to existing programs has begun

• Performance Measures are starting to be tracked to evaluate the effectiveness of the programs

MOM Program

14

• Extensive coordination will be necessary with localities

• RWWMP will establish the projects, costs and schedule to address capacity challenges to a selected level of service

• Approved RWWMP will be incorporated into the Consent Decree by reference

• RWWMP Development schedule is very tight

RWWMP

15

• Regional Hydraulic Model undergoing final calibration

• Pilot storage project under design• Extensive locality coordination is ongoing on

facility data, wet weather flow parameters, modeling approaches and rehabilitation planning

RWWMP Status

16

2010 2011 2012 2013 2014Flow Monitoring

Initial Model Calibration Submitted to Localities and EPA/DEQ with 6 months of data November 30, 2010

Complete Model Calibration and Model Report

System Evaluation/Capacity Analysis

Level of Service Analysis

Locality Rehab Plans/Peak Flow Commitments

Regional Consensus Level of Service Selection

Alternatives Analysis Regional Capacity Enhancements

Prepare RWWMP

Consent Decree Submittal SOC Submittal

Regional Wet Weather

Management Plan

July 31, 2012

November 26, 2012

November 26, 2013

July 31, 2011

17

Consent Decree RWWMP Development Schedule

• Purpose of the Plan is to identify how to get the most capacity out of the existing system

• Final EPA/DEQ comments are being addressed

Short Term Wet Weather Operational Plan

18

• Purpose of the plan is to document SSO response, reporting, recordkeeping and resolution practices

• Revised Plan approved by EPA/DEQ

SSO Response Plan

19

• Ongoing meetings of Capacity Team, Locality Team, Private Property I/I Abatement Committee, Model Users Group and Locality Modeling Committee

• Ad hoc committees with HRSD and locality representatives are reviewing key SOC deliverables

• HRSD providing GIS, flow, pressure and rainfall data to localities

Coordination with Localities

20

• Annual newsletter (first due out before February 23, 2011)

• Annual public informational meeting with public notice (January 25, 2011)

• Public outreach regarding overflows– “…a public outreach program to inform the public

of any SSO Outfalls within the Regional SS System, the possible health and environmental effects of SSOs and that recreational activities, such as swimming, should be limited as a result of such SSOs.”

Public Participation

21

• First annual report was submitted November 1, 2010 for period through June 30, 2010

• Semi annual report is due May 1, 2011 for period of July 1, 2010 through December 31, 2010

Reporting Requirements

22

• Report Sanitary Sewer Overflows – Call your local utility department

• Inspect home, yard and sewer service pipes to ensure separation between storm and sanitary systems

• Practice proper disposal of pharmaceuticals, food wastes and kitchen grease – minimize use or eliminate garbage disposal

• Reduce stormwater runoff by using rain barrels, rain gardens and establishing a buffer

Steps Citizens Can Take to Protect Receiving Waters

23

• Improve water quality by raising oysters• Limit synthetic fertilizer and other lawn

chemical applications – use natural products like Nutri-Green®

• Pick up animal waste• Avoid feeding wildlife• Support “No Dumping” and use boater pump

out facilities

Steps Citizens Can Take to Protect Receiving Waters (Cont.)

24

Questions?

25