ENABLING STRUCTURESENABLING STRUCTURES

INNOVATIVE SOLUTIONSINNOVATIVE SOLUTIONSFORFOR

COMPLEX CONSTRUCTION PROBLEMSCOMPLEX CONSTRUCTION PROBLEMS

BYBY

ER. A.B. KARNIKER. A.B. KARNIKCONSULTING ENGINEERCONSULTING ENGINEER

EXCITING WORLD OF STEEL STRUCTURES

6/18/2011

2

PART 1- INTRODUCTION

PART 2 - CASE STUDIES FOR ENABLING STRUCTURES

PART 3 - SPECIAL STRUCTURES

DO NOT FORGET NEWTON!!!!

PART 1

WHAT IS ENABLING STRUCTURE ?

HOW TO ARRIVE AT DESIGN LOADS ?

INFORMATION FROM CLIENT THRO’SEARCHING QUESTIONS.

SEGREGATION OF INFORMATION.

IF INFORMATION NOT AVAILABLE HOW TO APPROXIMATE ?

6/18/2011

3

DETERMINATION OF FACTOR OF SAFETY.

• SERVICEABILITY REQUIREMENT MORE PREDOMINANT.

• F.S. JUST SUFFICIENT TO CATER FOR STRENGTH.

• D.L AND L.L NEED NOT BE AS PER IS CODES.

STRUCTURAL SCHEME

• SAFETY.

• ECONOMY WRT MATERIAL CONSUMPTION.

• EASE OF EXECUTION OF GIVEN SCHEME.

• ECONOMY WRT TIME FOR ERECTION AND ACTUAL OPERATION.

6/18/2011

4

TYPES OF STRUCTURES

MARINE AND RIVER CONSTRUCTION

SUB STRUCTURE SUPER STRUCTURE

UNDERGROUND

UNDER WATER

PORTS JETTIES BRIDGES

CASE STUDY 1

50 MET LONG FLOATING WALKWAY BRIDGE

6/18/2011

5

SALIENT POINTS

1. ACCESS TO WORK SITE.

2. DEPTH OF WATER MORE THAN 5.0 MET.

3. PRINCIPLES OF HYDRAULICS AND STABILITY.

6/18/2011

6

6/18/2011

7

CASE STUDY 2

JACKUP PLATFORM

NO ACCESS AVILABLE.WHAT IS THE SOLUTION ?

MOORING DOLPHINSMOORING DOLPHINSFORFOR

WESTERN INDIA SHIPYARD,WESTERN INDIA SHIPYARD,GOAGOA

6/18/2011

8

�JACK-UP PLATFORM DESIGNED FOR 3 NUMBERS. 1200 MM DIA. PILE.

�PROVIDED WITH OVER HEAD FACILITY TO INSTALL PILING PULLIES IN THE REQUIRED LOCATION

6/18/2011

9

JACK UP PLATFORM FOR SOIL EXPLORATION AT JOGESHWAR DEAHEJ FOR IPCL

PILING FOR JETTIES• PILING WORK-- ONSHORE

OFFSHORE• PILES -- PRECAST

INSITU

• CHALLENGES IN OFF SHORE PILING.

• RANGE OF PILE DIAMETER.

•SPEED OF CONSTRUCTION .

• QUALITY OF CONSTRUCTION.

6/18/2011

10

CASE STUDY 3

MARINE JETTYMARINE JETTYATAT

DAHEJDAHEJFORFOR

BIRLA COPPER, GUJARATBIRLA COPPER, GUJARAT

6/18/2011

11

THE JETTY . . .THE JETTY . . .

� 1152 M LONG IN APPROACH, 208 M LONG ON BERTHING FACE.

� JETTY CONSTRUCTION FROM LAND- END ON METHOD

PILINGPILING

�6 PILES IN 5 DAYS

�FRONT CANTILEVER 24 M�SUPPORTED SPAN 24 M

�30 M REAR CANTILEVER

6/18/2011

12

WATER CURRENTS OF 3 TO 4 M/ SEC

6/18/2011

13

15 T CAPACITY UNDER SLUNG CRANE FOR

MATERIAL HANDLING

6/18/2011

14

6/18/2011

15

ROLLING BRACING IN PLAN

MARINE JETTYMARINE JETTYATAT

DAHEJDAHEJFORFOR

GUJARAT CHEMICAL PORT, GUJARAT CHEMICAL PORT, GUJARATGUJARAT

6/18/2011

16

THE JETTY . . .THE JETTY . . .

�THE JETTY IS MORE THAN 1000 M LONG

PILING . . .PILING . . .

� PILING GANTRY CONSTUCTED PILES UPTO ABOUT 1000M IN LENGTH IN 10 MONTHS WITH FOUR PILES FROM FRONT CANTILEVER OF 24M & TWO PILES FROM SIDE CANTILEVER OF 8M.

� THIS GANTRY ALSO HAD 30M REAR CANTILEVER FOR 20T CAPACITY UNDER SLUNG CRANE.

6/18/2011

17

PILING . . .PILING . . .

� TAILOR MADE ERECTION GANTRY WAS ALSO DESIGNED FOR HANDLING OF PRECAST CONCRETE UNITS.

� REST OF THE GANTRY WAS DONE UP WITH STEEL PILES HAVING VERTICAL & RAKER PILES IN COMBINATION.

6/18/2011

18

NOTE- THE BRACKET ON SIDE FOR ROLLING THE GANTRY

6/18/2011

19

PRECAST CONCRETE ERECTION GANTRY

MARINE JETTY MARINE JETTY FORFOR

THERMAL POWERSTATION THERMAL POWERSTATION AT AT

TUTICORIN,TAMILNADUTUTICORIN,TAMILNADU

6/18/2011

20

THE JETTY . . .THE JETTY . . .

�THE JETTY WAS ABOUT 1000 M LONG WITH TWIN PILE BENTS

SPACED AT 20 M C/C.

THE GANTRY . . .THE GANTRY . . .

�THE GANTRY HAD 20 M LEFT CANTILEVER, 10 M SUPPORTED SPAN AND 30 M RIGHT CANTILEVER.

�50 M LONG FLOATING BRIDGE WAS ALSO DESIGNED FOR BREAK WATER TO JETTY SITE APPROACH .

6/18/2011

21

6/18/2011

22

BRACING THE PILES

6/18/2011

23

PILING GANTRY FOR JETTY AT PILING GANTRY FOR JETTY AT AGATTI AGATTI

LAKSHADWEEPLAKSHADWEEPJETTY HEAD JETTY HEAD

AT AN ANGLE OF 104 DEGREESAT AN ANGLE OF 104 DEGREES

6/18/2011

24

6/18/2011

25

ASH DISPOSAL ASH DISPOSAL PIPE LINE BRIDGE PIPE LINE BRIDGE

FOR FOR THERMAL POWERSTATION THERMAL POWERSTATION

ATATDAHANU,DAHANU,

MAHARASHTRAMAHARASHTRA

�JACK-UP PLATFORM DESIGNED FOR 3 NOs.600 MM DIA. PILE.

�MOVING RIG ON PLARFORM & SUSPENDED PILING PULLEY ADJUSTABLE IN REQUIRED LOCATION

�PILE GROUPS SPACED AT 30M C/C TO SUPPORT STEEL GIRDERS

6/18/2011

26

JACK UP PLATFORM FOR ASH DISPOSAL PIPE LINE BRIDGE PILING FOR THERMAL POWER STATION, DAHANU

6/18/2011

27

CASE STUDY 4

SUPER STRUCTURE

BRIDGE ON MAHANANDA BRIDGE ON MAHANANDA RIVERRIVER

ATATDALKHOLA DALKHOLA

WEST BENGALWEST BENGAL

6/18/2011

28

THE BRIDGE . . .THE BRIDGE . . .� P.S.C. BOX GIRDER BRIDGE� 12 SPANS OF 52.80 M, SUPPORTED ON

WELLS-PIERS.� 1200 T BOX GIRDER TRAVELLING

STAGING� TEMPORARY 3 PILE GROUPS ON EACH

SIDE TO BREAK THE SPAN TO 13.2M FOR SUSPENSION OF SHUTTERING ABOVE DECK SLAB

� TIME CYCLE OF 100 DAYS REDUCED TO 60 DAYS

6/18/2011

29

6/18/2011

30

6/18/2011

31

NOTE THE SUSPENDERS FOR CAPACITY 60 T

6/18/2011

32

BRIDGE ON SOMESHWAR BRIDGE ON SOMESHWAR CREEKCREEK

AT AT RATNAGIRI MAHARASHTRARATNAGIRI MAHARASHTRA

6/18/2011

33

�THE BRIDGE IS 58 M LONG HAVING ONE SPAN OF 40 M BETWEEN ABUTMENT & CENTRAL WELL PIER.

�REST OF THE LENGTH CANTILEVERED.

�CENTERING BOX GIRDER TO SUPPORT P.S.C. BOX GIRDER –WEIGHING ABOUT 500 T.

�CENTERING BOX OF 39 M LENGTH WAS LAUNCHED FROM ABUTMENT OVER TEMPORARY PAIR OF COLUMNS AT 13 M C/C SPACING.

�CENTER BOX WAS LOWERED TO REQUIRED LEVEL

6/18/2011

34

1/3RD LENGTH OF CANTILEVER

6/18/2011

35

PART 3

SPECIAL STRUCTURES

LIMESTONE STOCK PILE LIMESTONE STOCK PILE SHEDSHEDFORFOR

CLINKER PLANTCLINKER PLANTAT JAFARABADAT JAFARABAD

FORFORNARMADA CEMENT NARMADA CEMENT

COMPANY LTD.COMPANY LTD.

6/18/2011

36

�COVERING THE LIME STOCK WAS NECESSARY WHILE THE PLANT WAS IN OPERATION

�THE SHED WAS TO BE ERECTED IN PARTS OF 53 M WIDTH X 20 M LENGTH, 30 M AWAY AND ROLLING IN POSITION .

� TOTAL LENGTH – 200 M

� TWO PORTALS 10M APART & TRIANGULAR PURLINS IN ROOF ALONG WITH SIDE CLADING CANTILEVERING 5M, CONNECTED IN TANDEN & ROLLED ON RAILS WITH TROLLEYS ATTACHED TO THEIR SHOE.

6/18/2011

37

6/18/2011

38

6/18/2011

39

6/18/2011

40

SPECIAL DETAIL FOR HINGE

BRIDGE ON BRIDGE ON RAILWAY LINERAILWAY LINENEAR ITARASINEAR ITARASI

MADHYA PRADESH.MADHYA PRADESH.

6/18/2011

41

�THE BRIDGE HAS 45 DEGREES SKEW SPAN OF 40M

�6 PSC GIRDERS WEIGHING 140T EACH CONSTRUCTED ON ELEVATED STAGING

� WINCHED & SIDE SHIFTED TO REQUIRED POSITION

�IN-SITU DECK SLAB WITH SUSPENDED SHUTTERING

�WEB SHUTTER OF 6M HANDLED WITH OVERHEAD MONORAI

�HINGED AT BOTTOM EDGE OF STAGING FACILITATED THE ROTATION FROM VERTICAL TO HORIZONTAL POSITION. IT ACTED AS A WORKING PLATFORM ALSO.

6/18/2011

42

6/18/2011

43

TWO FOLD USE OF SHUTTERING ON HINGE ACTS AS

WORKING PLATFORM FOR REINF ASSEMBLEY

MOORING DOLPHINMOORING DOLPHINFORFOR

OIL JETTY OIL JETTY ATAT

MANGALOREMANGALORE

6/18/2011

44

� MAXIMUM HORIZONTALPULL 230T.

� FREE WATER DEPTH 18M

� ALLOWABLE DEFLECTION 6MM

� ALTERNATIVE I - VERTICAL PILES WOULD HAVE RESULTED IN LARGE DEFLECTIONS; 1200 MM DIA. PILES IN LARGE No. – COSTLY

� ALTERNATIVE II – RAKER PILES CONNECTED ALONG OUTER EDGE OF 8X8M PILE CAP – UNACCEPTABLE DEFLECTIONS & SEVERE BM & AXIAL FORCE

� ALTERNATIVE III – 4 INDIVIDUAL PILE GROUPS OF 3-800 DIA AT 1:4 RAKE. PILE CENTER LINE MEETING IN PILE CAP & TRIPOD FORMATION AT EACH CORNER . THIS RESULTED IN REDUCED DEFLECTION & BM.

6/18/2011

45

ALTENATIVE II

ALTENATIVE III

MORE EFFICIENT

ALTENATIVE I

6/18/2011

46

CENTERING FOR 125T CENTERING FOR 125T FENDER BLOCKFENDER BLOCK

FORFORCONTAINER BERTHCONTAINER BERTH

ATATADANI PORTADANI PORT

6/18/2011

47

�HORIZONTAL BEAM SPANING 13M – COSTLY

� INVERTED TRIANGLE IN STEEL USED TO TRANSFER THE FORCE. UTILISING FULL CAPACITY IN TENSION.

CRADDLE FOR 125 T FENDER BLOCK

6/18/2011

48

CRANE FOR ERECTION OF CRANE FOR ERECTION OF LARGE SPAN SHED OVER LARGE SPAN SHED OVER

WATERWATER

�ERECTION CRANE DESIGNED TO ERECT THE LARGE SPAN SHED IN A RECORD TIME

�SHED – 41M WIDE, 130M LONG & 30M HIGH

6/18/2011

49

CRANE DESIGNED TO ERECT SHED OVER WATERCRANE DESIGNED TO ERECT SHED OVER WATER

CRANE OUT/OUT 48 M x 34 M HIGH x 24 M BASE WIDTHCRANE OUT/OUT 48 M x 34 M HIGH x 24 M BASE WIDTH

6/18/2011

50

6/18/2011

51

FLOATING PONTOON FOR BANDFLOATING PONTOON FOR BAND--DRAIN WORK FOR SOIL DRAIN WORK FOR SOIL

CONSOLIDATION AT DEEP WATER CONSOLIDATION AT DEEP WATER PORT PORT

ATATKAKINADAKAKINADA

PONTOONPONTOON

� WHY BAND- DRAINS ARE REQUIRED ?� TAILOR-MADE UNIQUE PONTOON WAS

DESIGNED� ACHIEVED A WORLD RECORD OF

2200 BAND- DRAINS IN A DAY FOR VERY SOFT CLAY CONSOLIDATION FOR BREAK WATER

6/18/2011

52

TYPICAL SECTION

KEY PLAN SHOWING CONCRETE TRACK

6/18/2011

53

6/18/2011

54

REMOVABLE STEEL REMOVABLE STEEL COFFERDAM FORCOFFERDAM FORINTAKE CHANNEL INTAKE CHANNEL

7M WIDE X 12M HIGH7M WIDE X 12M HIGH

6/18/2011

55

6/18/2011

56

SPEEDY CONSTRUCTION OF SPEEDY CONSTRUCTION OF 12M HIGH RCC WALL WITH 12M HIGH RCC WALL WITH

BUTTRESSESBUTTRESSES

6/18/2011

57

6/18/2011

58

6/18/2011

59

17 M HIGH RCC WALL ON 17 M HIGH RCC WALL ON HILL SLOPEHILL SLOPE

FOR FOR BUNGALOWBUNGALOW

6/18/2011

60

6/18/2011

61

6/18/2011

62