6/18/2011 1 ENABLING STRUCTURES ENABLING STRUCTURES INNOVATIVE SOLUTIONS INNOVATIVE SOLUTIONS FOR FOR COMPLEX CONSTRUCTION PROBLEMS COMPLEX CONSTRUCTION PROBLEMS BY BY ER. A.B. KARNIK ER. A.B. KARNIK CONSULTING ENGINEER CONSULTING ENGINEER EXCITING WORLD OF STEEL STRUCTURES

Transcript of ENABLING STRUCTURES - Technoesistechnoesis.co.in/downloadfile/L10-EnablingStructures.pdf ·...

6/18/2011

1

ENABLING STRUCTURESENABLING STRUCTURES

INNOVATIVE SOLUTIONSINNOVATIVE SOLUTIONSFORFOR

COMPLEX CONSTRUCTION PROBLEMSCOMPLEX CONSTRUCTION PROBLEMS

BYBY

ER. A.B. KARNIKER. A.B. KARNIKCONSULTING ENGINEERCONSULTING ENGINEER

EXCITING WORLD OF STEEL STRUCTURES

6/18/2011

2

PART 1- INTRODUCTION

PART 2 - CASE STUDIES FOR ENABLING STRUCTURES

PART 3 - SPECIAL STRUCTURES

DO NOT FORGET NEWTON!!!!

PART 1

WHAT IS ENABLING STRUCTURE ?

HOW TO ARRIVE AT DESIGN LOADS ?

INFORMATION FROM CLIENT THRO’SEARCHING QUESTIONS.

SEGREGATION OF INFORMATION.

IF INFORMATION NOT AVAILABLE HOW TO APPROXIMATE ?

6/18/2011

3

DETERMINATION OF FACTOR OF SAFETY.

• SERVICEABILITY REQUIREMENT MORE PREDOMINANT.

• F.S. JUST SUFFICIENT TO CATER FOR STRENGTH.

• D.L AND L.L NEED NOT BE AS PER IS CODES.

STRUCTURAL SCHEME

• SAFETY.

• ECONOMY WRT MATERIAL CONSUMPTION.

• EASE OF EXECUTION OF GIVEN SCHEME.

• ECONOMY WRT TIME FOR ERECTION AND ACTUAL OPERATION.

6/18/2011

4

TYPES OF STRUCTURES

MARINE AND RIVER CONSTRUCTION

SUB STRUCTURE SUPER STRUCTURE

UNDERGROUND

UNDER WATER

PORTS JETTIES BRIDGES

CASE STUDY 1

50 MET LONG FLOATING WALKWAY BRIDGE

6/18/2011

5

SALIENT POINTS

1. ACCESS TO WORK SITE.

2. DEPTH OF WATER MORE THAN 5.0 MET.

3. PRINCIPLES OF HYDRAULICS AND STABILITY.

6/18/2011

6

6/18/2011

7

CASE STUDY 2

JACKUP PLATFORM

NO ACCESS AVILABLE.WHAT IS THE SOLUTION ?

MOORING DOLPHINSMOORING DOLPHINSFORFOR

WESTERN INDIA SHIPYARD,WESTERN INDIA SHIPYARD,GOAGOA

6/18/2011

8

�JACK-UP PLATFORM DESIGNED FOR 3 NUMBERS. 1200 MM DIA. PILE.

�PROVIDED WITH OVER HEAD FACILITY TO INSTALL PILING PULLIES IN THE REQUIRED LOCATION

6/18/2011

9

JACK UP PLATFORM FOR SOIL EXPLORATION AT JOGESHWAR DEAHEJ FOR IPCL

PILING FOR JETTIES• PILING WORK-- ONSHORE

OFFSHORE• PILES -- PRECAST

INSITU

• CHALLENGES IN OFF SHORE PILING.

• RANGE OF PILE DIAMETER.

•SPEED OF CONSTRUCTION .

• QUALITY OF CONSTRUCTION.

6/18/2011

10

CASE STUDY 3

MARINE JETTYMARINE JETTYATAT

DAHEJDAHEJFORFOR

BIRLA COPPER, GUJARATBIRLA COPPER, GUJARAT

6/18/2011

11

THE JETTY . . .THE JETTY . . .

� 1152 M LONG IN APPROACH, 208 M LONG ON BERTHING FACE.

� JETTY CONSTRUCTION FROM LAND- END ON METHOD

PILINGPILING

�6 PILES IN 5 DAYS

�FRONT CANTILEVER 24 M�SUPPORTED SPAN 24 M

�30 M REAR CANTILEVER

6/18/2011

12

WATER CURRENTS OF 3 TO 4 M/ SEC

6/18/2011

13

15 T CAPACITY UNDER SLUNG CRANE FOR

MATERIAL HANDLING

6/18/2011

14

6/18/2011

15

ROLLING BRACING IN PLAN

MARINE JETTYMARINE JETTYATAT

DAHEJDAHEJFORFOR

GUJARAT CHEMICAL PORT, GUJARAT CHEMICAL PORT, GUJARATGUJARAT

6/18/2011

16

THE JETTY . . .THE JETTY . . .

�THE JETTY IS MORE THAN 1000 M LONG

PILING . . .PILING . . .

� PILING GANTRY CONSTUCTED PILES UPTO ABOUT 1000M IN LENGTH IN 10 MONTHS WITH FOUR PILES FROM FRONT CANTILEVER OF 24M & TWO PILES FROM SIDE CANTILEVER OF 8M.

� THIS GANTRY ALSO HAD 30M REAR CANTILEVER FOR 20T CAPACITY UNDER SLUNG CRANE.

6/18/2011

17

PILING . . .PILING . . .

� TAILOR MADE ERECTION GANTRY WAS ALSO DESIGNED FOR HANDLING OF PRECAST CONCRETE UNITS.

� REST OF THE GANTRY WAS DONE UP WITH STEEL PILES HAVING VERTICAL & RAKER PILES IN COMBINATION.

6/18/2011

18

NOTE- THE BRACKET ON SIDE FOR ROLLING THE GANTRY

6/18/2011

19

PRECAST CONCRETE ERECTION GANTRY

MARINE JETTY MARINE JETTY FORFOR

THERMAL POWERSTATION THERMAL POWERSTATION AT AT

TUTICORIN,TAMILNADUTUTICORIN,TAMILNADU

6/18/2011

20

THE JETTY . . .THE JETTY . . .

�THE JETTY WAS ABOUT 1000 M LONG WITH TWIN PILE BENTS

SPACED AT 20 M C/C.

THE GANTRY . . .THE GANTRY . . .

�THE GANTRY HAD 20 M LEFT CANTILEVER, 10 M SUPPORTED SPAN AND 30 M RIGHT CANTILEVER.

�50 M LONG FLOATING BRIDGE WAS ALSO DESIGNED FOR BREAK WATER TO JETTY SITE APPROACH .

6/18/2011

21

6/18/2011

22

BRACING THE PILES

6/18/2011

23

PILING GANTRY FOR JETTY AT PILING GANTRY FOR JETTY AT AGATTI AGATTI

LAKSHADWEEPLAKSHADWEEPJETTY HEAD JETTY HEAD

AT AN ANGLE OF 104 DEGREESAT AN ANGLE OF 104 DEGREES

6/18/2011

24

6/18/2011

25

ASH DISPOSAL ASH DISPOSAL PIPE LINE BRIDGE PIPE LINE BRIDGE

FOR FOR THERMAL POWERSTATION THERMAL POWERSTATION

ATATDAHANU,DAHANU,

MAHARASHTRAMAHARASHTRA

�JACK-UP PLATFORM DESIGNED FOR 3 NOs.600 MM DIA. PILE.

�MOVING RIG ON PLARFORM & SUSPENDED PILING PULLEY ADJUSTABLE IN REQUIRED LOCATION

�PILE GROUPS SPACED AT 30M C/C TO SUPPORT STEEL GIRDERS

6/18/2011

26

JACK UP PLATFORM FOR ASH DISPOSAL PIPE LINE BRIDGE PILING FOR THERMAL POWER STATION, DAHANU

6/18/2011

27

CASE STUDY 4

SUPER STRUCTURE

BRIDGE ON MAHANANDA BRIDGE ON MAHANANDA RIVERRIVER

ATATDALKHOLA DALKHOLA

WEST BENGALWEST BENGAL

6/18/2011

28

THE BRIDGE . . .THE BRIDGE . . .� P.S.C. BOX GIRDER BRIDGE� 12 SPANS OF 52.80 M, SUPPORTED ON

WELLS-PIERS.� 1200 T BOX GIRDER TRAVELLING

STAGING� TEMPORARY 3 PILE GROUPS ON EACH

SIDE TO BREAK THE SPAN TO 13.2M FOR SUSPENSION OF SHUTTERING ABOVE DECK SLAB

� TIME CYCLE OF 100 DAYS REDUCED TO 60 DAYS

6/18/2011

29

6/18/2011

30

6/18/2011

31

NOTE THE SUSPENDERS FOR CAPACITY 60 T

6/18/2011

32

BRIDGE ON SOMESHWAR BRIDGE ON SOMESHWAR CREEKCREEK

AT AT RATNAGIRI MAHARASHTRARATNAGIRI MAHARASHTRA

6/18/2011

33

�THE BRIDGE IS 58 M LONG HAVING ONE SPAN OF 40 M BETWEEN ABUTMENT & CENTRAL WELL PIER.

�REST OF THE LENGTH CANTILEVERED.

�CENTERING BOX GIRDER TO SUPPORT P.S.C. BOX GIRDER –WEIGHING ABOUT 500 T.

�CENTERING BOX OF 39 M LENGTH WAS LAUNCHED FROM ABUTMENT OVER TEMPORARY PAIR OF COLUMNS AT 13 M C/C SPACING.

�CENTER BOX WAS LOWERED TO REQUIRED LEVEL

6/18/2011

34

1/3RD LENGTH OF CANTILEVER

6/18/2011

35

PART 3

SPECIAL STRUCTURES

LIMESTONE STOCK PILE LIMESTONE STOCK PILE SHEDSHEDFORFOR

CLINKER PLANTCLINKER PLANTAT JAFARABADAT JAFARABAD

FORFORNARMADA CEMENT NARMADA CEMENT

COMPANY LTD.COMPANY LTD.

6/18/2011

36

�COVERING THE LIME STOCK WAS NECESSARY WHILE THE PLANT WAS IN OPERATION

�THE SHED WAS TO BE ERECTED IN PARTS OF 53 M WIDTH X 20 M LENGTH, 30 M AWAY AND ROLLING IN POSITION .

� TOTAL LENGTH – 200 M

� TWO PORTALS 10M APART & TRIANGULAR PURLINS IN ROOF ALONG WITH SIDE CLADING CANTILEVERING 5M, CONNECTED IN TANDEN & ROLLED ON RAILS WITH TROLLEYS ATTACHED TO THEIR SHOE.

6/18/2011

37

6/18/2011

38

6/18/2011

39

6/18/2011

40

SPECIAL DETAIL FOR HINGE

BRIDGE ON BRIDGE ON RAILWAY LINERAILWAY LINENEAR ITARASINEAR ITARASI

MADHYA PRADESH.MADHYA PRADESH.

6/18/2011

41

�THE BRIDGE HAS 45 DEGREES SKEW SPAN OF 40M

�6 PSC GIRDERS WEIGHING 140T EACH CONSTRUCTED ON ELEVATED STAGING

� WINCHED & SIDE SHIFTED TO REQUIRED POSITION

�IN-SITU DECK SLAB WITH SUSPENDED SHUTTERING

�WEB SHUTTER OF 6M HANDLED WITH OVERHEAD MONORAI

�HINGED AT BOTTOM EDGE OF STAGING FACILITATED THE ROTATION FROM VERTICAL TO HORIZONTAL POSITION. IT ACTED AS A WORKING PLATFORM ALSO.

6/18/2011

42

6/18/2011

43

TWO FOLD USE OF SHUTTERING ON HINGE ACTS AS

WORKING PLATFORM FOR REINF ASSEMBLEY

MOORING DOLPHINMOORING DOLPHINFORFOR

OIL JETTY OIL JETTY ATAT

MANGALOREMANGALORE

6/18/2011

44

� MAXIMUM HORIZONTALPULL 230T.

� FREE WATER DEPTH 18M

� ALLOWABLE DEFLECTION 6MM

� ALTERNATIVE I - VERTICAL PILES WOULD HAVE RESULTED IN LARGE DEFLECTIONS; 1200 MM DIA. PILES IN LARGE No. – COSTLY

� ALTERNATIVE II – RAKER PILES CONNECTED ALONG OUTER EDGE OF 8X8M PILE CAP – UNACCEPTABLE DEFLECTIONS & SEVERE BM & AXIAL FORCE

� ALTERNATIVE III – 4 INDIVIDUAL PILE GROUPS OF 3-800 DIA AT 1:4 RAKE. PILE CENTER LINE MEETING IN PILE CAP & TRIPOD FORMATION AT EACH CORNER . THIS RESULTED IN REDUCED DEFLECTION & BM.

6/18/2011

45

ALTENATIVE II

ALTENATIVE III

MORE EFFICIENT

ALTENATIVE I

6/18/2011

46

CENTERING FOR 125T CENTERING FOR 125T FENDER BLOCKFENDER BLOCK

FORFORCONTAINER BERTHCONTAINER BERTH

ATATADANI PORTADANI PORT

6/18/2011

47

�HORIZONTAL BEAM SPANING 13M – COSTLY

� INVERTED TRIANGLE IN STEEL USED TO TRANSFER THE FORCE. UTILISING FULL CAPACITY IN TENSION.

CRADDLE FOR 125 T FENDER BLOCK

6/18/2011

48

CRANE FOR ERECTION OF CRANE FOR ERECTION OF LARGE SPAN SHED OVER LARGE SPAN SHED OVER

WATERWATER

�ERECTION CRANE DESIGNED TO ERECT THE LARGE SPAN SHED IN A RECORD TIME

�SHED – 41M WIDE, 130M LONG & 30M HIGH

6/18/2011

49

CRANE DESIGNED TO ERECT SHED OVER WATERCRANE DESIGNED TO ERECT SHED OVER WATER

CRANE OUT/OUT 48 M x 34 M HIGH x 24 M BASE WIDTHCRANE OUT/OUT 48 M x 34 M HIGH x 24 M BASE WIDTH

6/18/2011

50

6/18/2011

51

FLOATING PONTOON FOR BANDFLOATING PONTOON FOR BAND--DRAIN WORK FOR SOIL DRAIN WORK FOR SOIL

CONSOLIDATION AT DEEP WATER CONSOLIDATION AT DEEP WATER PORT PORT

ATATKAKINADAKAKINADA

PONTOONPONTOON

� WHY BAND- DRAINS ARE REQUIRED ?� TAILOR-MADE UNIQUE PONTOON WAS

DESIGNED� ACHIEVED A WORLD RECORD OF

2200 BAND- DRAINS IN A DAY FOR VERY SOFT CLAY CONSOLIDATION FOR BREAK WATER

6/18/2011

52

TYPICAL SECTION

KEY PLAN SHOWING CONCRETE TRACK

6/18/2011

53

6/18/2011

54

REMOVABLE STEEL REMOVABLE STEEL COFFERDAM FORCOFFERDAM FORINTAKE CHANNEL INTAKE CHANNEL

7M WIDE X 12M HIGH7M WIDE X 12M HIGH

6/18/2011

55

6/18/2011

56

SPEEDY CONSTRUCTION OF SPEEDY CONSTRUCTION OF 12M HIGH RCC WALL WITH 12M HIGH RCC WALL WITH

BUTTRESSESBUTTRESSES

6/18/2011

57

6/18/2011

58

6/18/2011

59

17 M HIGH RCC WALL ON 17 M HIGH RCC WALL ON HILL SLOPEHILL SLOPE

FOR FOR BUNGALOWBUNGALOW

6/18/2011

60

6/18/2011

61

6/18/2011

62

THANK