1 EE Marketing Meeting, Munich, 26-27.07.2007
EE AREA MEETINGBIG Project
2 EE Marketing Meeting, Munich, 26-27.07.2007
BIG Project
BIG platform project is a strategic project for the group working on all 100 – 150 – 200 L wall
hung and 200 – 250 – 300 L floor standing electric water heaters. Factories concerned by
the project are Namur, Valence, Chartres
Unification and standardization are the first main goal of the project in view to reduce
complexity and cost of products. But more than cost reduction or standardization, other
main objective is to define the ideal segmentation and value proposition of the products
for the markets
The Project
3 EE Marketing Meeting, Munich, 26-27.07.2007
New Big Project
The Range
Immersed Heater Dry Heater Titanium +Protech
Larger inspection flange (110mm)
Top Packaging
Magnesium Anode
Anti-scale heating element
Heating light
Front Temp. Regulation
BEST Electronic
Visual Display
Multipower 3kW
50-200 V / 200-300 FS 50-200 V / 200-300 FS 100-200 V / 300 FS75-200 V / 200-300 FS
Forced tank protection system with tension supply
Very long tank life
4 EE Marketing Meeting, Munich, 26-27.07.2007
New Big Project
The Range
Immersed Heater
Dry Heater
Titanium +
Protech
5 EE Marketing Meeting, Munich, 26-27.07.2007
Ariston Offer – Wall Hung
Immersed Heater Dry Heater Protech
6 EE Marketing Meeting, Munich, 26-27.07.2007
Ariston Offer – Wall Hung
Value proposition: ECO mode (patented MTS)
ENERGY SAVING by:
1. ECO DELAY: optimization of the night charge period
2. ECO SETPOINT: record of the customer way of use and optimization of the set-point temperatures to save energy
SAVE of 30% thermal heat losses
Value proposition: ECO mode (patented MTS)
ENERGY SAVING by:
1. ECO DELAY: optimization of the night charge period
2. ECO SETPOINT: record of the customer way of use and optimization of the set-point temperatures to save energy
SAVE of 30% thermal heat losses
Titanium +
7 EE Marketing Meeting, Munich, 26-27.07.2007
Ariston Offer – Floor Standing
Immersed Heater Dry Heater Protech
8 EE Marketing Meeting, Munich, 26-27.07.2007
Ariston Offer – Floor Standing
Titanium +
Value proposition: Titanium + ECO mode (patented MTS)
1. ECO DELAY: optimization of the night charge period
2. ECO SETPOINT: record of the customer way of use and optimization of the set-point temperatures to save energy
SAVE of 30% thermal heat losses
Value proposition: Titanium + ECO mode (patented MTS)
1. ECO DELAY: optimization of the night charge period
2. ECO SETPOINT: record of the customer way of use and optimization of the set-point temperatures to save energy
SAVE of 30% thermal heat losses
9 EE Marketing Meeting, Munich, 26-27.07.2007
Floor Standing – New Supports
D 505D 505
Mod. pavimentoMod. pavimento
Mod. muraliMod. murali
D 560D 560
Mod. pavimentoMod. pavimentoMod. muraliMod. murali
D 505D 505
Mod. pavimentoMod. pavimento
Mod. muraliMod. murali
D 560D 560
Mod. pavimentoMod. pavimentoMod. muraliMod. murali
10 EE Marketing Meeting, Munich, 26-27.07.2007
EE AREA MEETINGBIG Project
Thanks