Post on 01-Nov-2014
TECHNICAL SITE SURVEY
TECHNICAL SITE SURVEY REPORT
CONTENT: i. TECHNICAL SITE SURVEY REPORT
SITE IDENTIFICATION DETAILS
Site Name DUTWASite ID TZ 0693Site Address DUTWA/BARIADILOCATION BARIADIVISIT DATE 16/10/2012TIME 08.30
Page 1 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
1. General Site Details
1.1 Owner and Site DetailsSite ID TZ 0693 Site Name DUTWA
Property owner
Address
Contact Telephone No.
AIRTEL/TANZANIA
BARIADI
0784 670032
Notice for Access
If Yes, specify time / details?
+ Yes No
TIME 08.30 DATE 16/10/2012
Constructional Access Yes No
Site Area/Location
Education Institute. Gov’t. Est.
Private Est. Health Institute.
+ Mountain Area Commercial Bldg
Industrial Bldg. Residential Bldg.
Roadside Agricultural Area
Others:
Site Type New Greenfield New Rooftop + Ex. Greenfield Ex. Rooftop
Antenna Support + Tower Poles
Tower / Pole Manufacturer N/A
Tower / Pole Type TRINGLE
Tower / Pole Height (m) New + Existing 50 MT
Aviation Lamp Height distance from ground to Aviation light.
30 MT 50 MT
Equipment Housing Shelter +Outdoor Building
Shelter/Building size (m x m x m) H………. W……….L……….
Power Source Gridpower + Generator Others
GPS Surveyed Latitude (WGS84) 02 28 17.0 S ……. Deg
GPS Surveyed Longitude (WGS84) 033 57 06.6 E …….. Deg
GPS Surveyed Altitude ..........Meters
Road Mark
Distance from Road Mark to Site
Other Information/Site direction DWG:
Page 2 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
1.2Telecom site details
BTS Information Measured
Cabinet #
ManufacturerIn Operation
Type Config. Cooling Amp VDC Watt
4 HUAWEI YES 3900A.WCDMA 48 32
Total BTS 48 1536
Transmission Information Measured
Cabinet #
Manufacturer Installed in Cab #
Type Config. Qty Amp VDC Watt
1 HUAWEI YES TMC 11H 1 3 48 32
Total Transmission 48 1536
Amp VDC Watt
Total Power consumption Telecom 3 48 3072
Page 3 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
1.3Additional Load Information
Additional Load Information
Description Manufacturer Type Qty Watt/Unit Amp/Unit VAC VDC
Working Light: N/A 4FT 4 160 0.3 230
Security Light: N/A 4FT 4 160 0.3 230
Air-condition : N/A
Air-condition : N/A
Air-condition: N/A
Aviation light: 4 240 1.5 230
Electric fence: NEMTEK DRUID 1 230 12
Other:
Other:
Total Power Consumption V AC 400
Total Power Consumption V DC
1.4Power Survey General Information
Power Survey General Information
Available Power Source
Gridpower Sub-Station Transmission Line
Power Room / Box Street Light + Generator
Private Network Others:
Power Source Reference No.
Power Source distance to Site ……. Meters
Available Existing MDB + Yes No
Page 4 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
1.5Generator Information
Generator
Manufacturer Type Serial No.Condition
ACFuse
Runhours
kVANo of
PhasesVAC
Bat. VDC
SOUTH AFRICA
YANMAH N/A GOOD 63 N/A 13 3P 400 12
AMF / Remote Panel
Manufacturer Type Serial No. ConditionRemote
start /stopAlarm 1 Alarm 2 Alarm 3
INTEL LITESOUTH AFRICA
AMF 25 GOOD MANUAL
1.6ATS Information
Existing ATS
Manufacturer Type Serial no. Condition In operationBuild in
AMFStand alone AMF
INTELI LITE AMF 25 N/A GOOD YES
Other information:
1.7 Existing Hybrid solution Information
Existing Solar / Wind solution / Hybrid
Manufacturer Type Serial no. Condition Qty W/panel Total W
Emerson N/A N/A N/A N/A N/A N/A
Page 5 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
2 Map/DWG’s
2.1Site locationMap
2.2Site Layout
Page 6 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
3 Site Bill of Quantity
Description
Windturbine Unit Qty
Rigging and installation of Windturbine EAInstallation of Topmount EA
Installation of AWL and Power Cable m
Installation of Connection box and connection of cables EA
Installation of AWL x 3 EA
Solar panels Unit Qty
Installation of Solar panels 12 panels EA
Installation of Solar panels 2 x 10 panels or 2 x 8 EA
Installation of Solar stand EA
Installation and connection of control box EA
Battery Installation Unit Qty
Installation of batteries in cabinet per string ( string has 4 ) EA
Termination per string EA
Generator + Fuel tank Installation Unit Qty
Placement of generator on plinth EA
Placement of fuel tank on plinth EA
Connecting all cables to existing gen-set EA
Enclosure installation Unit Qty
Installation of 2 bay outdoor cabinet EA
Installation of 3 bay outdoor cabinet EA
Installation of cooling system existing shelters Unit Qty
Installation of Free aircooling EA
Installation of Heat exchanger EA
Installation of Air Conditioner EA
Supply & install of PVC Trunking for shelter 75 mm x 75 mm m
Supply & install of PVC Trunking for shelter 50 mm x 50 mm m
Page 7 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
Description
Foundations Unit Qty
Basic foundations m3
Foundation for Outdoor cabinet type2, 2000x900x200mm EA
Foundation for Genset EA
Foundation for Solar panel Shed 300x300x300mm EA
Optional items Unit Qty
Installation of LED light for existing shelter EA
Supply and install 100mm ducting on site for cables including all cable installation m
Installation of Flood light EA
Installation of 48/24VDC PSU EA
Transport of material to site Site
Crane hire h
Structural analysis of existing towers EA
Distances Unit Qty
From proposed location of Cabinet to Gen-set mFrom proposed location of Cabinet to Solar Panel mFrom proposed location of Cabinet to Telecom outdoor cabinet mFrom proposed location of Cabinet to Telecom Shelter mFrom proposed location of Cabinet to middle Aviation Lights mFrom proposed location of Cabinet to top Aviation Lights mFrom proposed location of Cabinet to Flood light mFrom proposed location of Cabinet to Security light m
Page 8 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
4 Other information
3.1 PermitsEnvironmental or Cultural problems?Permit required?
Yes No
Yes No
Any Aviation concerns?
Any additional Permit for windturbine ?
Yes No +
Yes No
Any Military or Security concerns?
Permit required?
Yes No +
Yes No
Other Information:
3.2Rooftop/building information if applicable
Height of the Building ( Ave. Ground to Roof level ) Meters
Height of Penthouse from Roof level Meters
Height of the Parapet wall from Roof level Meters
Elevator available ( size, capacity, etc ) Yes: No:
Describe roof cover
Describe horizontal load bearing structure (e.g. concrete slab, beams etc)
Describe wall cover (e.g. render, bricks etc)
Describe vertical load bearing structure (e.g. bearing walls, columns etc)
Access for crane Yes No
Type of building/structure
Condition of building (1 to 5) 1-bad, 5-good
Other information:
Page 9 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
3.3Greenfield information
General topography and soil/pavement type
New road required (length, width, gradient)
Access for crane +Yes NO
Area size (meter x meter)
Other information:
3.4Space availabity
Location Area m x m
Space for Solar panels
Space for cabinet
Can Cabinet be located under the solar panel? + Yes No
Other information:
3.5Operating room detailsDimensions Height (m): Length (m): Width (m):Restriction in space in the clear of mounting area: Yes No Wall type:Floor Type :Ceiling Type :Lighting :
Page 10 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
3.6Obstruction
DESCRIBE ALL Obstruction of Height Equal or Higher than the Site.# AZIMUTH DISTANCE FROM TOWER HEIGHT DESCRIPTION1 W 35 MT AIR TEL2 N 35 MT AIR TEL3 50 MT GSM ANTENA456789101112
Other information:
Page 11 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
4 Power DB
4.1BatteriesBattery Type Model Number Qty Battery/Rack Qty of RacksN/A N/A 24 1 1
4.2Rectifier/Converter information# Type Model Number Input
voltageOutput voltage
Number of
Modules
Number of slots
kW/module
Output breaker
size
Measured Amp
1 EPW30-48 A EPW30–48 A 48 48 5 8 63 46234
4.3 DC Distribution BoxesDoes DC DB have fuses or circuit breakerssupply cable to DC DBSize of incoming power cables 25
mm²Colour BLUE/BLACK
Number of incoming cables
# Type of DC Current rating Equipment Supplying Conductor Size Qty1 48 4823456789101112
4.4 Cable RoutingDoes the runway extend to the proposed position of the new equipment:Is there sufficient space for new cables:
Page 12 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report
TECHNICAL SITE SURVEY
Height of cable tray runway :
Trunking Dimensions Grid span Dimensions Positioning and fastening Qty
Routing Diagram
4.5 Earthing systemEarthing system suitable Yes+ No Total earth resistance (<5 Ohms required)New earth system to be provided Yes No + Material of earth barSpare positions on earth bar Yes + No
Page 13 of Date:
Site ID:
7100-Q-REP-0005 (RevA) Technical Site Survey Report