TECHNICAL SITE SURVEY TECHNICAL SITE SURVEY REPORT CONTENT: i. TECHNICAL SITE SURVEY REPORT SITE IDENTIFICATION DETAILS Site Name DUTWA Site ID TZ 0693 Site Address DUTWA/BARIADI LOCATION BARIADI VISIT DATE 16/10/2012 TIME 08.30 Page 1 of Date: Site ID: 7100-Q-REP-0005 (RevA) Technical Site Survey Report

Transcript of DUTWA.docx

Page 1: DUTWA.docx

TECHNICAL SITE SURVEY

TECHNICAL SITE SURVEY REPORT

CONTENT: i. TECHNICAL SITE SURVEY REPORT

SITE IDENTIFICATION DETAILS

Site Name DUTWASite ID TZ 0693Site Address DUTWA/BARIADILOCATION BARIADIVISIT DATE 16/10/2012TIME 08.30

Page 1 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 2: DUTWA.docx

TECHNICAL SITE SURVEY

1. General Site Details

1.1 Owner and Site DetailsSite ID TZ 0693 Site Name DUTWA

Property owner

Address

Contact Telephone No.

AIRTEL/TANZANIA

BARIADI

0784 670032

Notice for Access

If Yes, specify time / details?

+ Yes No

TIME 08.30 DATE 16/10/2012

Constructional Access Yes No

Site Area/Location

Education Institute. Gov’t. Est.

Private Est. Health Institute.

+ Mountain Area Commercial Bldg

Industrial Bldg. Residential Bldg.

Roadside Agricultural Area

Others:

Site Type New Greenfield New Rooftop + Ex. Greenfield Ex. Rooftop

Antenna Support + Tower Poles

Tower / Pole Manufacturer N/A

Tower / Pole Type TRINGLE

Tower / Pole Height (m) New + Existing 50 MT

Aviation Lamp Height distance from ground to Aviation light.

30 MT 50 MT

Equipment Housing Shelter +Outdoor Building

Shelter/Building size (m x m x m) H………. W……….L……….

Power Source Gridpower + Generator Others

GPS Surveyed Latitude (WGS84) 02 28 17.0 S ……. Deg

GPS Surveyed Longitude (WGS84) 033 57 06.6 E …….. Deg

GPS Surveyed Altitude ..........Meters

Road Mark

Distance from Road Mark to Site

Other Information/Site direction DWG:

Page 2 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 3: DUTWA.docx

TECHNICAL SITE SURVEY

1.2Telecom site details

BTS Information Measured

Cabinet #

ManufacturerIn Operation

Type Config. Cooling Amp VDC Watt

4 HUAWEI YES 3900A.WCDMA 48 32

Total BTS 48 1536

Transmission Information Measured

Cabinet #

Manufacturer Installed in Cab #

Type Config. Qty Amp VDC Watt

1 HUAWEI YES TMC 11H 1 3 48 32

Total Transmission 48 1536

Amp VDC Watt

Total Power consumption Telecom 3 48 3072

Page 3 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 4: DUTWA.docx

TECHNICAL SITE SURVEY

1.3Additional Load Information

Additional Load Information

Description Manufacturer Type Qty Watt/Unit Amp/Unit VAC VDC

Working Light: N/A 4FT 4 160 0.3 230

Security Light: N/A 4FT 4 160 0.3 230

Air-condition : N/A

Air-condition : N/A

Air-condition: N/A

Aviation light: 4 240 1.5 230

Electric fence: NEMTEK DRUID 1 230 12

Other:

Other:

Total Power Consumption V AC 400

Total Power Consumption V DC

1.4Power Survey General Information

Power Survey General Information

Available Power Source

Gridpower Sub-Station Transmission Line

Power Room / Box Street Light + Generator

Private Network Others:      

Power Source Reference No.

Power Source distance to Site ……. Meters

Available Existing MDB + Yes No

Page 4 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 5: DUTWA.docx

TECHNICAL SITE SURVEY

1.5Generator Information

Generator

Manufacturer Type Serial No.Condition

ACFuse

Runhours

kVANo of

PhasesVAC

Bat. VDC

SOUTH AFRICA

YANMAH N/A GOOD 63 N/A 13 3P 400 12

AMF / Remote Panel

Manufacturer Type Serial No. ConditionRemote

start /stopAlarm 1 Alarm 2 Alarm 3

INTEL LITESOUTH AFRICA

AMF 25 GOOD MANUAL

1.6ATS Information

Existing ATS

Manufacturer Type Serial no. Condition In operationBuild in

AMFStand alone AMF

INTELI LITE AMF 25 N/A GOOD YES

Other information:

1.7 Existing Hybrid solution Information

Existing Solar / Wind solution / Hybrid

Manufacturer Type Serial no. Condition Qty W/panel Total W

Emerson N/A N/A N/A N/A N/A N/A

Page 5 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 6: DUTWA.docx

TECHNICAL SITE SURVEY

2 Map/DWG’s

2.1Site locationMap

2.2Site Layout

Page 6 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 7: DUTWA.docx

TECHNICAL SITE SURVEY

3 Site Bill of Quantity

Description

Windturbine Unit Qty

Rigging and installation of Windturbine EAInstallation of Topmount EA

Installation of AWL and Power Cable m

Installation of Connection box and connection of cables EA

Installation of AWL x 3 EA

Solar panels Unit Qty

Installation of Solar panels 12 panels EA

Installation of Solar panels 2 x 10 panels or 2 x 8 EA

Installation of Solar stand EA

Installation and connection of control box EA

Battery Installation Unit Qty

Installation of batteries in cabinet per string ( string has 4 ) EA

Termination per string EA

Generator + Fuel tank Installation Unit Qty

Placement of generator on plinth EA

Placement of fuel tank on plinth EA

Connecting all cables to existing gen-set EA

Enclosure installation Unit Qty

Installation of 2 bay outdoor cabinet EA

Installation of 3 bay outdoor cabinet EA

Installation of cooling system existing shelters Unit Qty

Installation of Free aircooling EA

Installation of Heat exchanger EA

Installation of Air Conditioner EA

Supply & install of PVC Trunking for shelter 75 mm x 75 mm m

Supply & install of PVC Trunking for shelter 50 mm x 50 mm m

Page 7 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 8: DUTWA.docx

TECHNICAL SITE SURVEY

Description

Foundations Unit Qty

Basic foundations m3

Foundation for Outdoor cabinet type2, 2000x900x200mm EA

Foundation for Genset EA

Foundation for Solar panel Shed 300x300x300mm EA

Optional items Unit Qty

Installation of LED light for existing shelter EA

Supply and install 100mm ducting on site for cables including all cable installation m

Installation of Flood light EA

Installation of 48/24VDC PSU EA

Transport of material to site Site

Crane hire h

Structural analysis of existing towers EA

Distances Unit Qty

From proposed location of Cabinet to Gen-set mFrom proposed location of Cabinet to Solar Panel mFrom proposed location of Cabinet to Telecom outdoor cabinet mFrom proposed location of Cabinet to Telecom Shelter mFrom proposed location of Cabinet to middle Aviation Lights mFrom proposed location of Cabinet to top Aviation Lights mFrom proposed location of Cabinet to Flood light mFrom proposed location of Cabinet to Security light m

Page 8 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 9: DUTWA.docx

TECHNICAL SITE SURVEY

4 Other information

3.1 PermitsEnvironmental or Cultural problems?Permit required?

Yes No

Yes No

Any Aviation concerns?

Any additional Permit for windturbine ?

Yes No +

Yes No

Any Military or Security concerns?

Permit required?

Yes No +

Yes No

Other Information:

3.2Rooftop/building information if applicable

Height of the Building ( Ave. Ground to Roof level ) Meters

Height of Penthouse from Roof level Meters

Height of the Parapet wall from Roof level Meters

Elevator available ( size, capacity, etc ) Yes:       No:

Describe roof cover

Describe horizontal load bearing structure (e.g. concrete slab, beams etc)

Describe wall cover (e.g. render, bricks etc)

Describe vertical load bearing structure (e.g. bearing walls, columns etc)

Access for crane Yes No

Type of building/structure

Condition of building (1 to 5) 1-bad, 5-good

Other information:

Page 9 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 10: DUTWA.docx

TECHNICAL SITE SURVEY

3.3Greenfield information

General topography and soil/pavement type

New road required (length, width, gradient)

Access for crane +Yes NO

Area size (meter x meter)

Other information:

3.4Space availabity

Location Area m x m

Space for Solar panels

Space for cabinet

Can Cabinet be located under the solar panel? + Yes No

Other information:

3.5Operating room detailsDimensions Height (m): Length (m): Width (m):Restriction in space in the clear of mounting area: Yes No Wall type:Floor Type :Ceiling Type :Lighting :

Page 10 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 11: DUTWA.docx

TECHNICAL SITE SURVEY

3.6Obstruction

DESCRIBE ALL Obstruction of Height Equal or Higher than the Site.# AZIMUTH DISTANCE FROM TOWER HEIGHT DESCRIPTION1 W 35 MT AIR TEL2 N 35 MT AIR TEL3 50 MT GSM ANTENA456789101112

Other information:

Page 11 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 12: DUTWA.docx

TECHNICAL SITE SURVEY

4 Power DB

4.1BatteriesBattery Type Model Number Qty Battery/Rack Qty of RacksN/A N/A 24 1 1

4.2Rectifier/Converter information# Type Model Number Input

voltageOutput voltage

Number of

Modules

Number of slots

kW/module

Output breaker

size

Measured Amp

1 EPW30-48 A EPW30–48 A 48 48 5 8 63 46234

4.3 DC Distribution BoxesDoes DC DB have fuses or circuit breakerssupply cable to DC DBSize of incoming power cables 25

mm²Colour BLUE/BLACK

Number of incoming cables

# Type of DC Current rating Equipment Supplying Conductor Size Qty1 48 4823456789101112

4.4 Cable RoutingDoes the runway extend to the proposed position of the new equipment:Is there sufficient space for new cables:

Page 12 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report

Page 13: DUTWA.docx

TECHNICAL SITE SURVEY

Height of cable tray runway :

Trunking Dimensions Grid span Dimensions Positioning and fastening Qty

Routing Diagram

4.5 Earthing systemEarthing system suitable Yes+ No Total earth resistance (<5 Ohms required)New earth system to be provided Yes No + Material of earth barSpare positions on earth bar Yes + No

Page 13 of Date:

Site ID:

7100-Q-REP-0005 (RevA) Technical Site Survey Report