Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Dundas West / Bloor Mobility Hub Study

Leslie Woo, Vice President, Policy and Planning, MetrolinxAnne McIlroy, Principal, Brook McIlroy

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Presentation Outline

1. Mobility Hubs

2. Background

3. Dundas West - Bloor Mobility Hub Study: Overview of Primary Zone Design Concepts and Phasing

4. Timeline and Next Steps

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

A Bold Plan

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

9 Big Moves

1 A fast, frequent and expanded regional rapid transit network

2 High-order transit connectivity to the Pearson Airport District from all directions

3 An expanded Union Station - the heart of the GTHA’s transportation system.

4 A complete walking and cycling network with bike-sharing programs

5 An information system for travellers, where and when they need it

6 A region-wide integrated transit fare system

8 A comprehensive strategy for goods movement

9 An Investment Strategy to provide stable and predictable funding

7 A system of interconnected mobility hubs

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Mobility Hubs: More than just a transit station…

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

51Mobility

Hubs(26 with GO Facilities – Existing or Planned)

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Metrolinx Roles in Mobility Hubs

Lead design and implementation for key hubs

Lever Metrolinx investments to implement the mobility hub concept (e.g., Dundas West/Bloor, Kipling)

• Pursue joint development opportunities at GO stations (e.g., Port Credit)

Partnership with municipalities for planning and implementation (e.g., Cooksville)

Provide advice and guidance on hub concept to inform planning decisions (e.g., Richmond Hill-Langstaff)

Mobility hub analysis and policy development

Expand the range of and ways of providing customer services

Innovation in operations

Other

Dundas West-Bloor Mobility Hub Open House - March 23, 20118

Critical Function of Mobility Hubs

Generate transit-supportive densities and destinations that support sustainable regional growth

Provide multi-modal access and seamless transfers to the regional rapid transit system

Improve customer experience

Catalyze effective implementation of regional rapid transit projects

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Background

City of Toronto Avenue Studies Provides community framework and urban design guidelines to direct redevelopment of major avenues throughout the city.

• Bloor-Lansdowne (2000 – 2003)• Comprehensive plan for Bloor site• Recommended connections between GO & TTC

• Bloor-Dundas (2008-09)• OMB Decision on the Giraffe (at 27 storeys) was in favour of the City

Georgetown South Environmental Assessment Approved October 2009

Dundas West – Bloor Mobility Hub Study Initiated Spring 2010Metrolinx

• Policy and Planning (Study Lead)• Corporate Infrastructure (Georgetown South)

• City of Toronto• Community Planning• Transportation Planning

• TTC• Service Planning• Property Development

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Dundas West – Bloor Mobility Hub: Existing Conditions

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Existing Conditions

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Existing Conditions

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Existing Predominant Land Uses

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Station Area: Existing Design Issues

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

800m radiusMobility Hub

Secondary Zone

Primary Zone

Primary, Secondary and Tertiary Zones

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

The Primary Zone

Area 1: GO/ARL entrance

Area 2: TTC & GO/ARL Connection

Area 3: Northwest corner of Bloor-Dundas & TTC Station

Area 4: SE corner Bloor-Dundas& Bloor St. W. frontage

Area-wide improvements & additional active transportation connections

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area One: Existing Conditions

existing entrance to platforms

platform

platform

Bloor St. W.

Pert

h A

ve.

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area One: Bloor Street Looking East

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area One: Bloor Street Looking South

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area One: Bloor Street Looking North/West

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area One: Looking South from Platform

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area One: Looking South from Platform

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area Two: Existing Conditions

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area Two: Existing Conditions

Key Issues include:• Lack of street-oriented

development.• Limited access

between transportation modes.

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One

Public Realm & Access• Creation of a “Station” along Bloor St. West • Pedestrian tunnel to connect TTC subway, GO Rail, Air Rail Link, West

Toronto Rail Path and Bloor St. West • Streetscape improvements along Bloor St. West between Dundas & Perth• Improved cycling facilities

Transit• Air Rail Link service• Enhanced Georgetown corridor peak and mid day off-peak train service

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One - Cross Section at Bloor

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One – Underground Pedestrian Tunnel

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase One – Pedestrian Tunnel

CROSS SECTION

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Future Phases - Area 2

PPUDO

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area 3

Key Issues include:• Inhospitable pedestrian

environment • Inefficient circulation.• Fragmented built form.

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Future Phases - Area 3

Recommendations include:• A landmark corner

building.• A realigned streetcar track

and signalized intersection.• A community garden or

open space.

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Future Phases - Design Concepts| Area 3

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Area 4

Key Issues include:• Lack of permeability.• Poor definition of the

public realm.

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Future Phases - Area 4

Recommendations include:• A comprehensive site plan

based on the Bloor-Dundas Avenue Study.

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Existing Phase 1 – 2015

1

2

3

4

1 – TTC/GO/ARL Connection

2 – Bloor Station

3 – At-grade connection

4 – The Crossways/Bloor Street

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Phase 2 – Post 2015 Phase 3 – Long Term

Area 2

Area 3

Area 4

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Next Steps

Spring 2011

• Incorporate Open House Comments and Finalize Mobility Hub Study

Summer 2011 to Summer 2012

• Detailed Design (Phase 1)

• Fall 2012 to Spring 2014 Construction (Phase 1)

In Service • Bloor GO (Summer 2014)

• Enhanced GO Georgetown corridor peak and midday off-peak train service (2015)

• Air Rail Link (2015)

Dundas West-Bloor Mobility Hub Open House - March 23, 2011

Discussion Groups

To participate in the discussion groups, please:

• Break into smaller groups at one of the threefacilitated discussion groups: Rotate to next group after 20 minutes

• Provide your comments directly with the group

and/or• Fill out the comment sheet

provided• Write your comments on a

Post-it Note and place it on the Board

Dundas West-Bloor Mobility Hub Open House - March 23, 2011