Dundas West / Bloor Mobility Hub Study - Transit TorontoMar 23, 2011 · Dundas West-Bloor Mobility...
Transcript of Dundas West / Bloor Mobility Hub Study - Transit TorontoMar 23, 2011 · Dundas West-Bloor Mobility...
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Dundas West / Bloor Mobility Hub Study
Leslie Woo, Vice President, Policy and Planning, MetrolinxAnne McIlroy, Principal, Brook McIlroy
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Presentation Outline
1. Mobility Hubs
2. Background
3. Dundas West - Bloor Mobility Hub Study: Overview of Primary Zone Design Concepts and Phasing
4. Timeline and Next Steps
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
A Bold Plan
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
9 Big Moves
1 A fast, frequent and expanded regional rapid transit network
2 High-order transit connectivity to the Pearson Airport District from all directions
3 An expanded Union Station - the heart of the GTHA’s transportation system.
4 A complete walking and cycling network with bike-sharing programs
5 An information system for travellers, where and when they need it
6 A region-wide integrated transit fare system
8 A comprehensive strategy for goods movement
9 An Investment Strategy to provide stable and predictable funding
7 A system of interconnected mobility hubs
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Mobility Hubs: More than just a transit station…
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
51Mobility
Hubs(26 with GO Facilities – Existing or Planned)
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Metrolinx Roles in Mobility Hubs
Lead design and implementation for key hubs
Lever Metrolinx investments to implement the mobility hub concept (e.g., Dundas West/Bloor, Kipling)
• Pursue joint development opportunities at GO stations (e.g., Port Credit)
Partnership with municipalities for planning and implementation (e.g., Cooksville)
Provide advice and guidance on hub concept to inform planning decisions (e.g., Richmond Hill-Langstaff)
Mobility hub analysis and policy development
Expand the range of and ways of providing customer services
Innovation in operations
Other
Dundas West-Bloor Mobility Hub Open House - March 23, 20118
Critical Function of Mobility Hubs
Generate transit-supportive densities and destinations that support sustainable regional growth
Provide multi-modal access and seamless transfers to the regional rapid transit system
Improve customer experience
Catalyze effective implementation of regional rapid transit projects
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Background
City of Toronto Avenue Studies Provides community framework and urban design guidelines to direct redevelopment of major avenues throughout the city.
• Bloor-Lansdowne (2000 – 2003)• Comprehensive plan for Bloor site• Recommended connections between GO & TTC
• Bloor-Dundas (2008-09)• OMB Decision on the Giraffe (at 27 storeys) was in favour of the City
Georgetown South Environmental Assessment Approved October 2009
Dundas West – Bloor Mobility Hub Study Initiated Spring 2010Metrolinx
• Policy and Planning (Study Lead)• Corporate Infrastructure (Georgetown South)
• City of Toronto• Community Planning• Transportation Planning
• TTC• Service Planning• Property Development
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Dundas West – Bloor Mobility Hub: Existing Conditions
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Existing Conditions
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Existing Conditions
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Existing Predominant Land Uses
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Station Area: Existing Design Issues
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
800m radiusMobility Hub
Secondary Zone
Primary Zone
Primary, Secondary and Tertiary Zones
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
The Primary Zone
Area 1: GO/ARL entrance
Area 2: TTC & GO/ARL Connection
Area 3: Northwest corner of Bloor-Dundas & TTC Station
Area 4: SE corner Bloor-Dundas& Bloor St. W. frontage
Area-wide improvements & additional active transportation connections
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area One: Existing Conditions
existing entrance to platforms
platform
platform
Bloor St. W.
Pert
h A
ve.
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area One: Bloor Street Looking East
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area One: Bloor Street Looking South
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area One: Bloor Street Looking North/West
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area One: Looking South from Platform
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area One: Looking South from Platform
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area Two: Existing Conditions
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area Two: Existing Conditions
Key Issues include:• Lack of street-oriented
development.• Limited access
between transportation modes.
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One
Public Realm & Access• Creation of a “Station” along Bloor St. West • Pedestrian tunnel to connect TTC subway, GO Rail, Air Rail Link, West
Toronto Rail Path and Bloor St. West • Streetscape improvements along Bloor St. West between Dundas & Perth• Improved cycling facilities
Transit• Air Rail Link service• Enhanced Georgetown corridor peak and mid day off-peak train service
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One - Cross Section at Bloor
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One – Underground Pedestrian Tunnel
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase One – Pedestrian Tunnel
CROSS SECTION
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Future Phases - Area 2
PPUDO
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area 3
Key Issues include:• Inhospitable pedestrian
environment • Inefficient circulation.• Fragmented built form.
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Future Phases - Area 3
Recommendations include:• A landmark corner
building.• A realigned streetcar track
and signalized intersection.• A community garden or
open space.
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Future Phases - Design Concepts| Area 3
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Area 4
Key Issues include:• Lack of permeability.• Poor definition of the
public realm.
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Future Phases - Area 4
Recommendations include:• A comprehensive site plan
based on the Bloor-Dundas Avenue Study.
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Existing Phase 1 – 2015
1
2
3
4
1 – TTC/GO/ARL Connection
2 – Bloor Station
3 – At-grade connection
4 – The Crossways/Bloor Street
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Phase 2 – Post 2015 Phase 3 – Long Term
Area 2
Area 3
Area 4
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Next Steps
Spring 2011
• Incorporate Open House Comments and Finalize Mobility Hub Study
Summer 2011 to Summer 2012
• Detailed Design (Phase 1)
• Fall 2012 to Spring 2014 Construction (Phase 1)
In Service • Bloor GO (Summer 2014)
• Enhanced GO Georgetown corridor peak and midday off-peak train service (2015)
• Air Rail Link (2015)
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
Discussion Groups
To participate in the discussion groups, please:
• Break into smaller groups at one of the threefacilitated discussion groups: Rotate to next group after 20 minutes
• Provide your comments directly with the group
and/or• Fill out the comment sheet
provided• Write your comments on a
Post-it Note and place it on the Board
Dundas West-Bloor Mobility Hub Open House - March 23, 2011
www.metrolinx.com