Driving Real
Productivity Improvements
at Container Terminals
Frederik Stork
Sr. Director, Optimization and Analytics Services at Navis
© Navis, LLC. All other trademarks are the property of their respective owners.
Camp 1
15 GMPH
Peak Performance
35-40 MPH
Camp 2
20 GMPH
Camp 3
25 GMPH
Camp 4
30 GMPH
Key Influencers:
• Yard Utilization
• Quantity of staff and equipment
• Quality of staff and equipment
© Navis, LLC. All other trademarks are the property of their respective owners. 3
Container Management
Q1 2018
© Navis, LLC. All other trademarks are the property of their respective owners.
TCP - company that manages the Container Terminal of Paranaguá, recorded the best
productivity indexes in its history. In addition to breaking records on all equipment
individually, with 30.0 MPH, we closed the month with 97.2 MPH (berth productivity).
Vessel planner coaching
Prime Route / Dispatcher Coaching
Control Room Role Adjustments
to drive pro-activeness
Yard Strategy and Expert Decking
Implementation
© Navis, LLC. All other trademarks are the property of their respective owners.5
© Navis, LLC. All other trademarks are the property of their respective owners.6
© Navis, LLC. All other trademarks are the property of their respective owners.7
© Navis, LLC. All other trademarks are the property of their respective owners.
Iterative Improvement Process
8
Month 11 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 25 26
Month 2 Month 3 Month 4 Month 5 Month 6 Month 7
Analysis
work-
shop
Improvement #2
Improvement # 3
Improvement # 1
Improvement # 4
Improvement # 5
Improvement # 6
Analysis work-shop
• Recurring intense analysis workshops every 3-5 months
• Improvement deployments in between workshops by either terminal and/or Navis
Terminal’s KPIs and Analytics
Analysis work-shop
Remote review
Ops Shadow
Data Ops Analysis
Prioriti-zation
Remote review
Ops Shadow
Data Ops Analysis
Prioriti-zation
© Navis, LLC. All other trademarks are the property of their respective owners.
Cost of a Software Defect
9
Time detected
Co
st t
o f
ix
1x 3x5x
10x
50x and more
Requirements Design Construction System Test In Production
© Navis, LLC. All other trademarks are the property of their respective owners.
Cost of a Delayed Move
10
Time detected
Co
st t
o f
ix
1x 3x5x
10x
50x and more
Requirements Design Construction System Test In Production
ReactiveProactive
-60 min -30 min -15 min -10 min 0 min
© Navis, LLC. All other trademarks are the property of their respective owners.
• work queues that need activation
• reefers that needs to be
unplugged
• undispatchedmoves whose
successor in the
queue is already
dispatched
Notify the Control Room Staff on …
11
© Navis, LLC. All other trademarks are the property of their respective owners. 12
In Summary
N4 Implementations
Expert Decking and Prime Route
Productivity Improvement Programs
Innovation
© Navis, LLC. All other trademarks are the property of their respective owners. 13
ZIM CHICAGO – December 3, 2017 – 39.6 MPH
1,785 moves (load and discharge)Vessel productivity: 196.5 MPH
© Navis, LLC. All other trademarks are the property of their respective owners.
TWITTER@naviscargo
NCCcollaboration.navis.com
WEBSITEwww.navis.com
FACEBOOKfacebook.com/naviscargo
LINKEDINlinkedin.com/company/navis
Thank you!