Design of Offshore Platforms

Post on 14-Feb-2018

231 views 1 download

Transcript of Design of Offshore Platforms

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 1/67

1

Design of Offshore Platforms

Lecture 1

Introduction1

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 2/67

2

Outline

Introducing myself

Course objectives

Course syllabus

Course application

Class policies

Reference books

2

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 3/67

3

Introducing myself

PhD, The Universityof Texas at Austin

Research interests:

  OffshoreEngineering

MarineHydrodynamics

SedimentTransport

Renewable Energy

FPSO 

3

FPSO 

FPSO 

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 4/67

4

Offshore Engineering

Simulation of Platforms/Risers/Pipelines

4

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 5/67

5

Renewable energy5

Danish west coast 

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 6/67

6

Class time

Class times: Mondays, 6:00-7:30 pm

TA Class times: Tuesdays, 6:00-7:30 pm

6

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 7/67

7

Course objective:

Introduces the student to

loading,

behavior,

analysis and

design of offshore platforms

7

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 8/67

8

Description:8

This is intended as an advanced course in the

Marine Structures area.

It is assumed that the students have the basic

knowledge of the structural analysis,

marine hydrodynamics and

steel structures design The course focuses on design of fixed platforms and

it only introduces the floating platforms.

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 9/67

9

Course Evaluation:9

Term Project/Homeworks: 40%

Final Exam: 60%

Pop-up quizzes/ 5 Min. Presentation : Extra scores

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 10/67

10

Class policies10

Original homework/project must be submitted by

each student.

The assignment will be graded for solution

procedure, numerical results, clarity and appearance.

Late assignments will not be accepted.

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 11/67

11

Course Outline:11

تی

س ار ص رم و چخر  مدم

رد يوس عاوا  شآ

و

 

گژو

 

درم

 

 

رري

... و يز تث يوس رم-وش يوس رم

ز

 

ثت

 

سوي

ز تث يوس  مر ازا

ز

 

ثت

 

سوي

 

سسمي

 

رم

دسا دراوم و يز تث يوس بم و ازم

 

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 12/67

12

Course Outline:12

  س

 

برگذاري

 

فرع

ث ير:دز و هدرم ير

درم ير:آ نشم يدرم يور   وزن مشن آت

ش و يور  غرات رارت ش از مرد مشن آت

مط

 

ري

 

رارت

 

غرات

 

رن

 

مد

 

و

 

زر

 

موج

 

د

وضوم رس:

Marine Growth, Vortex Shedding, Wave Slamming

ص نمز يراذگر

ژو

 

ا:ري

 

ش

 

رخورد

 

زز

ارط ير بر

 

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 13/67

13

Course Outline:13

س وآنلیز

 

حارط

 

و

س يزآ رم و م

ارط لوادم ي م نآ رم

(API-RP2A – Noble Denton-DNV)

رر نمز رد زآ

:Inplace

ص

 

زمن

 

آزي

: Loadout, Tow, Lift, Launch, Floatation & Upending

ژو

 

ري

 

ت

 

:آز

Fire, Dynamic Loading, Earthquake, Boat Impact, Explosion

ا

 

و

 

اصت

 

ارط

 

و

 

:(Tubular Joints)آز

سخ

 

آز

:(Wind & Wave Fatigue)مخ

 

روشي

 

 و

 

ط

...مش ارط و زآ

((Pile Design

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 14/67

14

Course Outline:14

حس

 

فرا

 

ي

 

سزه

 

حارط

 

و

 

آنلیز

 

افزاري

 

نرم

 

ب

 

ینشآ

ونش يو س

رف

 – درر

 – ارط

 

روشی

 

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 15/67

15

Main References:15

Useful websites: http://www.fgg.uni-lj.si/~/pmoze/esdep/master/wg15a/toc.htm 

www.offshore-mag.com 

زن

 

دكر

 

مر

 

 

ثت

 

سكوي

 

اراي

 

و

 

ارط

دا

رد يوكس يارا و حرط م دشوخ کمس

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 16/67

16

Other References:16

قدص

 

ر

 

رد

 

ی

 

سزه

 

و

 

در

 

سوال

 

سدم

ی هزسس  رد

لگ   مری رد ی هزسشا

 

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 17/67

17

Other Reference:17

S. K. Chakrabarti, 2005. HANDBOOK OF OFFSHORE ENGINEERING, ELSEVIER.

B. C. Gerwick, 2007. Construction of Marine and offshore structures, CRC press.

Ivar Holand, Ove T.Gudmestad and Erik Jersin, 2000. Design of Offshore ConcreteStructures, Spon press.

Patel, Minoo H., 1989. Dynamics of Offshore Structures, Butterwork & Co. Ltd.

S. K. Chakrabarti, 1987. Hydrodynamics of Offshore Structures, Springer. Dawson, Thomas H., 1983. Offshore Structural Engineering, Prentice-Hall Inc.

Hsu, Teng H., 1984. Applied Offshore Structural Engineering, Gulf PublishingCompany.

Robert T. Hudspeth, 2006. WAVES AND WAVE FORCES ON COASTAL ANDOCEAN STRUCTURES, World Scientific Publishing Co.

John B. Herbich, 1999. DEVELOPMENTS IN OFFSHORE ENGINEERING, GulfPublishing Company.

James F. Wilson, 2003. Dynamics of Offshore Structures, John Wiley & Sons, Inc.

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 18/67

18

Progress to deep water

offshore drilling and production of petroleum

resources:

Steady progress to deep water1947-1998

Water depth: 6 m to more than 500 m

18

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 19/67

19

Design for waves loads

platforms are designed for wave heights up to the order

of 25 meters

19

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 20/67

20

Cost

Expensive Structures

20

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 21/67

21

Platform Failure

It requires a good estimate of environmental forces

(wave, wind, current, …) to avoid failure. 

21

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 22/67

22

1ST Lecture Objective

identify the basic vocabulary

introduce the major concepts for offshore platform

structures

explain where the basic structural requirements fordesign are generated

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 23/67

23

Outline

Definition

Application

Importance

basic steps in the development process

major structural concepts

Fixed

Floating

major codes

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 24/67

24

Definition

Offshore Platform: a structure in the sea that does

not have direct access to the land

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 25/67

25

Application of offshore platforms

Oil and gas industry

Geotechnical surveys

Offshore wind turbines

Military purpose

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 26/67

26

Importance for Iran

Ranking of Oil/Gas recoverable reserves

155

1166

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 27/67

27

Importance for Iran

Most of Iran’scommon

reservoirs are

offshore

Foroozan

(common with

Saudi)

Arash (commonwith Kuwait)

South Pars

(common with

Qatar)

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 28/67

28

Ranking of Oil Companies

1. Saudi Armco

2. NIOC

3. Exxon Mobile

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 29/67

29

COST ASPECTS

The economic feasibility of an offshore project depends onmany aspects:

capital expenditure (CAPEX),

operational expenditure (OPEX)

tax royalties

In a typical offshore field development the CAPEX isdivided to:

1/3 on the platform 1/3 on the drilling of wells

1/3 on the pipelines

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 30/67

30

OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD

Factors involved in the evaluation

number of wells required

fixed or floated production facilities

pipeline or tanker off-loading

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 31/67

31

OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD

main technical activities prior to production:

engineering and design

fabrication and installation

drilling of production wells providing the off loading system

Pipelines

Tankers

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 32/67

32

Offshore Platforms

Includes

Superstructure:

supports the equipments

Substructure:withstand weight of

superstructure + Env. Loads

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 33/67

33

Superstructure

design depends on

capacity of production

type of reservoir

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 34/67

34

Substructure

design depends on

Weight of superstructure

Environment

water depth at location soil, at sea-bottom and in-depth

wind speed, air temperature

waves, tide and storm surge, current

ice

earthquakes

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 35/67

35

Hydrocarbon Superstructures functions

Reservoir drilling

Oil/gas production

Oil/gas storage

Personnel accommodation

Flare

Support bridges

A combinations of above functions

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 36/67

36

2. Major structural concepts

Fixed

Jacket

Compliant tower

GCS TLP

Floating

FPSO Spar

Semi-submersible

Fixed/Floating: Jack-ups

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 37/67

37

Water depth definition

h<1300 ft Shallow water

1300 ft<h<5000 ft Deep water

h>5000 ft Ultra-deep water

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 38/67

38

Platforms types versus water depth

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 39/67

39

Fixed Platforms

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 40/67

40

Jackets

majority of platforms are piled-jacket all built in

steel

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 41/67

41

Gravity concrete structure (GCS)

North Sea

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 42/67

42

Compliant Towers

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 43/67

43

TLP 43

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 44/67

44

Floating Platforms44

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 45/67

45

Semi-submersible 45

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 46/67

46

Anchorage via 8 cable chain system

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 47/67

47

47

•Anchorage via 8 cable-chain system•Platform weight: 14000 ton

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 48/67

48

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 49/67

49

FPSO

Goodfor PG,WA,

Brazil,Asia 

OFFLOADING

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 50/67

50

OFFLOADING

FLOATING HOSE REEL 50

FPSO 

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 51/67

51

Spar51

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 52/67

52

World's deepest platform

Perdido Spar in the Gulf of Mexico

water depth of 2,450 m (8,000 feet)

weigh around 55,000 tonnes

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 53/67

53

Transportation of Perdido

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 54/67

54

Jack-up Platforms

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 55/67

55

Construction

These factors combined with the size and weight of

the items, require that a designer must carefully

consider all construction activities between shop

fabrication and offshore installation.

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 56/67

56

Codes

API-RP2A: worldwide leading structural code for

jacket platforms

Lloyds rules

DnV rules

 

9-300اران  

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 57/67

57

Certification and Warranty Survey

Government authorities require that recognized

bodies appraise the aspects of structural integrity

and issue a certificate

Insurance companies covering transport andinstallation require the structures to be reviewed by

warranty surveyors before acceptance

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 58/67

58

Certification and Warranty Survey

major certification bodies are:

Det norske Veritas (DnV)

Lloyds Register of Shipping (LRS)

American Bureau of Shipping (ABS)Bureau Veritas (BV)

Germanischer Lloyd (GL)

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 59/67

59

OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD

initial phases which include

seismic field surveying

one or more exploration wells are drilled (Jack-up

drilling rigs are used for this purpose for water depthsup to 100 - 120 m; for deeper water floating rigs are

used)

results are studied and the economics and risks of

different development plans are evaluated

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 60/67

60

OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD

Factors involved in the evaluation may include

number of wells required

fixed or floated production facilities

number of such facilities pipeline or tanker off-loading

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 61/67

61

OFFSHORE DEVELOPMENT OF AN OIL/GAS FIELD

As soon as exploitation is decided and approved,

there are four main technical activities, prior to

production:

engineering and design fabrication and installation of the production facility

drilling of production wells, taking 1 - 3 months/well

providing the off loading system (pipelines, tankers,

etc.)

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 62/67

62

Jacket Based Platform for Shallow Water

First the jacket is installed. The wells are then drilled

by a jack-up drilling unit standing close by with a

cantilever rig extending over the jacket

Design and construction of the topside areprogressed parallel to the drilling, allowing

production to start soon after deck installation

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 63/67

63

CANTILEVER 

UPPER PACK 

LOWER PACK 

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 64/67

64

Jacket and Gravity Based Platform for Deep Water

The wells are drilled

from a drilling rig on

the permanent

platform Drilling starts after

the platform is built

and completely

installed

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 65/67

65

Jacket and Gravity Based Platform for Deep Water

Consequently production starts between one and

two years after platform installation

In recent years pre-drilled wells have been used to

allow an earlier start of the production

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 66/67

66

1st Lecture Summary

Class Policies/Syllabus/References

Definitions/ structural concepts

Basic steps in development process

A

7/23/2019 Design of Offshore Platforms

http://slidepdf.com/reader/full/design-of-offshore-platforms 67/67

67

Assignment

Read Section 1 to 3 of 

wg15a/l0100.htm#SEC_1