Lead to Win

Lead to Win

Optimizing SR&ED ClaimsJune 23, 2009

Kevin Goheen

Lead to WinSlide 2

SR&ED Program – Overview

• Canada’s largest federally supported program for industrial R&D incentives

• Program has existed since the 1980’s

• Over 19,000 claims made each year

• >$4 billion in tax credits

• Small and medium companies submit 75% of these claims, generally $20,000 to $2,000,000 in expenditures

Lead to Win

SR&ED Program - Overview

• Canadian Controlled Private Corporations (CCPCs) can earn refundable 35% investment tax credits (ITCs) on first $3M of expenditures

• Public companies (non-CCPC) can earn 20% ITCs, applied against federal tax

• 10% provincial tax credit for SR&ED performed in Ontario

• 20% Ontario Business Research Institute Tax Credit

• R&D costs CCPCs approx 30 cents/$ expenditure

• Individuals can also claim SR&ED

Slide 3

Lead to WinSlide 4

What is R&D Practically ?

Indications that you MAY be doing R&D:

• Technical attempts to make things faster, cheaper, better

• Lower than average manufacturing yields

• Prototype failures

• Large warranty costs

Each case must be analyzed within the definition of eligible activity

Lead to Win

SR&ED – The Concept

Slide 5

Point A‘base level’

Point B‘Technological Objective’

Barriers, Constraints, Uncertainties, Challenges

Work elements•Systematic•Uncertainty

•If?•How?

• Better yield• Less polluting• More capacity• More users•Faster response•Lower energy use•etc…

Lead to Win

Software Engineering

Some examples of advancement are:

• New architectures, algorithms or database techniques

• Performance increases (response time, speed, user or database scalability, reliability)

• Interfaces between two or more existing software packages• Development of new in-house development tools

Slide 6

Lead to Win

Mechanical Engineering

Some examples of advancement are:

• New packaging equipment and procedures

• Non-routine substitute of materials in injection molding

• Eliminating lead based solders in PCB manufacturing

• New fuels in cement manufacturing• Emission reduction in cement manufacturing• New hockey tape production equipment• Development of new in-house CAD tools• Developing new machinery to enhance production

Slide 7

Lead to Win

Other Sectors

Some examples of advancement are:

• Development of new pharmaceuticals

• New growing techniques for grape vines in cold climates

• New endodontic treatments

Slide 8

Lead to Win

Eligible Expenditures

• Labour• Capital goods• Contractors

– in many cases; be careful with wording• IP ownership

• Location

• Service vs. Product

• Management of R&D project

• Material• Overhead

Slide 9

Lead to Win

Timing

• SR&ED claims must be submitted within 18 months after the end of every fiscal period

• December 31, 2009 is the deadline for submitting claims for fiscal periods that ended on June 30, 2008.

• e.g. You can prepare two claims for your fiscal periods that ended on December 31, 2007 and 2008 at same time, and submit them both to CRA before June 30, 2009.

• CRA has committed in writing to help fix administrative omissions and errors if received 90 days prior to 18 month deadline.

• SR&ED cheques usually arrive ~3-4 months after CRA receives your SR&ED documentation.

• However if you have already submitted your T2, it will need to be amended. This will delay your first SR&ED cheque, so it arrives in ~6-8 months. Subsequent SR&ED cheques will likely arrive in ~3-4 months.

• The Ontario cheque (used to) tend(s) to arrive a few months later.• Many third parties will lend against filed SRED claims.• Note that there is no filing deadline for the Ontario Innovation Tax credit

Slide 10

Lead to Win

What’s New?

• New T661 form for YEs after Dec 31, 2008• Electronic filing• New terminology• Hard word limits on various sections of technical

descriptions; no pictures or graphics allowed• All projects to be filed after 2010 (not just top 20)• Explicit requirement for contemporaneous documentation• HINT: Not enough space to describe projects, hence will

be more audits. Write a long technical description, cut and paste into new form and keep the long form for the inevitable audit.

Slide 11

Lead to Win

CRA Web Site

Slide 12

Lead to Win

What is Involved in Filing a Claim?

• Scoping of projects

• Preparation of technical reports for each project

• Gathering and analysis of costs

• Preparation of tax R&D forms and attachments

• Submission of claim by 18 months following the year end

Slide 13

Lead to Win

Technical Descriptions

Five components

• A: Scientific or Technological Objectives

• B: Technology or Knowledge Base Level

• C: Scientific or Technological Advancement

• D: Description of Work in this Taxation Year

• E: Supporting Information.

Slide 14

Lead to Win

A: Scientific and Technical Objectives

• Preface this section with a brief description of the company and its commercial goals.

• What did you intend to achieve?

– Your work will qualify for SR&ED if you generate new knowledge to do new things and make technologies perform in unusual ways. You must intend to advance knowledge of your subject.

– Use numerical goals where possible.

– Emphasize the “methods and practices” that you wanted to develop.

• For multi-year projects, include a technology roadmap which you probably have from a business plan.

Slide 15

Lead to Win

B: Technology Knowledge Base

• Describe what you knew internally about the project before beginning and what other companies have done

• You are not expected to know “trade secrets” of others.• Area B is very important for software claims, where

common knowledge evolves rapidly. Is often challenged at technical review.

Slide 16

Lead to Win

C: Scientific and Technological Advancement

• Describe what achievements you hope to gain:

– “It would be an achievement if…”

• What was difficult? Stress uncertainty. Begin your paragraphs using these phrases:

– “We did not know how to…”

– “We were unsure whether we could…”

– “We could not understand why…”

– “Our problem was difficult to solve because…”

Slide 17

Lead to Win

D: Description of Work in Taxation Year

• For multi-year projects, described the status as of the first day of the FY

• What did your employees and contractors do?

– Describe the systematic way they investigated your technical challenges.

– Describe approaches they contemplated, but abandoned.

– What tests and analysis did they perform?

– Described what lessons you finally learned.

– Don’t use certain phrases (“trial and error”, “beta version”, “optimize”)

• Describe the status of the project on the last day of the FY and, for multi-year projects, your plans for the next FY.

Slide 18

Lead to Win

E: Supporting Information

• What documents exist? – high-level overview– functional specifications– Prototypes– source code– log books, bug reports– emails– minutes of meetings, etc…

• Just the titles. Do not submit copies of the documents to CRA.

• List all the contractors and describe what they did very briefly.

Slide 19

Lead to Win

New Documentation Requirements

Base Level Knowledge

Uncertainties Systematic Work Resources

Planning Docs X

Time Sheets X

Experiment Design X X X

Lab Notebooks X

Source Code, System Architecture, etc..

X

Trial Run Records X

Progress Reports, Minutes

X X

Test protocols, data and results

X X

Photographs and videos

X X

Prototypes, scraps X X

Contracts X

Others X X X X

Lead to Win

Preparing for your SR&ED Review

• Technical

– Prepare a slide deck from the T661

– Rehearse, rehearse, rehearse

– Let the reviewer present

– Don’t let the reviewer “wander around” your shop.

– Silence is your friend; shut up.

• Financial

– Can be extensive

– Examples

Slide 21

Lead to Win

Relationship with IRAP

• Advantages of having both– Usually SRED technical review goes better (or doesn’t happen)– Forces documentation– Cash flow improves 18 months– Financial risk drops– ITAs are usually on your side; CRA reviewers are not on your

side.• Disadvantages to having IRAP

– Reduces SR&ED claim, unless you get IRAP to pay for non-eligible activities

– e.g. R&D project with $50K salaries, $16.5 contractors, 65% overhead

• With $50K IRAP Small Project support, total cost to loss making CCPC is ($5060)

• Instead get IRAP to pay for marketing or IP; total cost to company will be ($27,060)

Slide 22

Lead to Win

10-minute Exercise

• Work in LTW Groups

• Define technical objectives

• Define technical uncertainty

• Define work performed

• Identify costs

• Identify documentation

Slide 23

Lead to WinSlide 24

Thank you!