Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019...

Post on 06-Aug-2020

3 views 0 download

Transcript of Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL · HES 2011 (Canmore Ref: DP00108270) HES 2019...

Crassula helmsii MANAGEMENT AT NEW ABBEY CORN MILL

INVASIVE SPECIESCrassula helmsii

Crassula helmsii at New Abbey

HES 2019 (Site Visit) BSBI 2020 (bsbi.org/maps?taxonid=2cd4p9h.g2z)

UK Distribution

SEPA & HES INTERACTION

WHOLE PROCESS METHOD STATEMENT

1. Aims

2. Measures

3. Regulations –registrations or GBRs with links to other information

Timeline – short, medium and long Roles and responsibilities Allowed iterative consultation across

SEPA and HES Options explored and consensus

reached Resilient to staff change Able to support funding

applications/budget allocations Trackable Lodged with SEPA

SITENEW ABBEY CORN MILL, DUMFRIES AND GALLOWAY

Aerial View Lade & Pond System

HES 2011 (Canmore Ref: DP00108270) HES 2019 (Method Statement)

INITIAL MANAGEMENTSCREENING AND WASTE MANAGEMENT

Rock Dam Filters & Sluice Screens

HES 2019 (Site Visit)

HE

S 2

019

(Meth

od S

tate

ment)

HES 2019 (Method Statement)HES 2019 (Site Visit)

TREATMENTMANUAL WEEDING, SHEETING & CHEMICAL CONTROL

Geotextile Lining

HES 2019 (Method Statement)

HES 2019 (Method Statement)

North Yorkshire Moors National Park 2017(https://northyorkmoorsnationalpark.wordpress.com

/tag/yorkshire-water/)

Mill Pond Stage Fish Pond Stage

MONITORINGCONTINUED SCREENING AND ASSESSMENT