CENTRAL PTW PROPOSED BARGING POINT (TEMPORARY …

Post on 24-Dec-2021

4 views 0 download

Transcript of CENTRAL PTW PROPOSED BARGING POINT (TEMPORARY …

Environmental Permit No.: EP-322/2008/G環境許可證編號: EP-322/2008/G

DROP SHAFT

SITE PORTION CTL - (TEMPORARY REQUIREMENT) - AREA ~ 2010m2

- WORKS AREA

CENTRAL PTW SITE PORTION CTL - (TEMPORARY REQUIREMENT) - AREA ~ 700m2

- WORKS SITE SITE PORTION CTL – (TEMPORARY REQUIREMENT) - AREA ~1000m2

- WORKS AREA

PTW BOUNDARY

WORKS AREA

SHAFT LOCATION

TUNNEL ALIGNMENT

LOCATION PLAN 1:4 000 000

PTW BOUNDARY

WORKS AREA

SHAFT LOCATION

TUNNEL ALIGNMENT

LOCATION PLAN 1:4 000 000

SITE PORTION SYP - (TEMPORARY REQUIREMENT) - WORKS AREA / BARGING POINT - AREA ~ 4130m2

- WORKS SITE

PROPOSED BARGING POINT AT SAI YING PUN

SITE PORTION SYP -(PERMANENT REQUIREMENT) - REQUIRED EARLY 2009 - AREA ~ 620m2

- SHAFT CONSTRUCTION & ASSOCIATED FACILITIES

(WITH SURFACE EXCAVATIONWORKS)

PRODUCTION SHAFT /DROP SHAFT

PRODUCTION SHAFT /RISER SHAFT

SITE PORTION SYP – (TEMPORAY REQUIREMENT)- AREA ~ 1200m2

- WORKS AREA

ADDITIONAL WORKS AREA

LOCATION PLAN 1:4 000 000

PTW BOUNDARY

WORKS AREA

SHAFT LOCATION

TUNNEL ALIGNMENT

LOCATION PLAN 1:4 000 000

SANDY BAY PTW

PTW BOUNDARY

WORKS AREA

SHAFT LOCATION

TUNNEL ALIGNMENT PRODUCTION SHAFT

SITE PORTION SB -(TEMPORARY REQUIREMENT) - AREA ~ 3600m2

- PRODUCTION SHAFT - WORKS SITE (WITH SURFACE EXCAVATION WORKS)

PRODUCTION SHAFT /DROP / RISER SHAFT

SITE PORTION SB -(PERMANENT REQUIREMENT) - AREA ~ 2690m2

- SHAFT CONSTRUCTION+ANCILLARY FACILITIES FOR PTW UPGRADING

(WITH SURFACE EXCAVATIONWORKS)

Project Title: Harbour Area Treatment Scheme (HATS) Stage 2A 工程名稱: 淨化海港計劃 – 第二期甲

Figure 1c: Location Plan 圖 1c: 位置圖