Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of...

Post on 11-Aug-2020

1 views 0 download

Transcript of Cellar Ceiling · brush down joists Re-instate missing noggins 3 of 22. Preparation – removal of...

Cellar Ceiling Draught Proofing &

Insulation

Rothwell & Lawrence - January 2016

Preparation – removal of existing ceiling, remove nails, brush down joists

Re-instate missing noggins

3 of 22

Preparation – removal of old/new plaster from walls

4 of 22

Preparation – bringing down the wiring OUT of the insulated envelope

Apply draught-proof / breathable membrane

Apply draught-proof / breathable membrane

Wiring goes through taped grommets

Before…

After

Taping the seams

Placing loft roll insulation & mesh to hold in place

Placing the loft roll insulation & mesh to hold in place

Placing the loft roll insulation & mesh to hold in place

T&G Wood fibre board is delivered

Wood fibre board attached to joists

Wood fibre board attached to joists

…almost done

Airbrick – ventilation strategy

LED flat panel lighting & draught-proof insulated wooden door

Light at the end of the tunnel…

The End