CDBG LABOR STANDARDS

Post on 31-Dec-2015

33 views 4 download

description

CDBG LABOR STANDARDS. What is the Davis-Bacon Act?. Outlines labor standards for federal projects Includes all contracts > $2K involving federal funds Provides minimum wages by position Ensures minimum pay & other labor standards are enforced at work site. - PowerPoint PPT Presentation

Transcript of CDBG LABOR STANDARDS

2010 CDBG Recipients’ Workshop

CDBG LABOR STANDARDS

Page 22010 CDBG Recipients’ Workshop September 30, 2010

What is the Davis-Bacon Act?

• Outlines labor standards for federal projects

• Includes all contracts > $2K involving federal funds

• Provides minimum wages by position

• Ensures minimum pay & other labor standards are enforced at work site

Page 32010 CDBG Recipients’ Workshop September 30, 2010

Steps to Complying with Davis-Bacon Labor Standards

1. Request for Wage Rates

2. Request for Contractor Clearance

3. Notice of Contract Action

4. Preconstruction Conference

5. Payroll Submission and Review

Page 42010 CDBG Recipients’ Workshop September 30, 2010

Request for Wage Determination

• Submit request to Pam Truitt at DCA

• 30 days prior to advertising for contract bids

• Wage rates, posters and Notice of Contract Action form will be sent to you

• Wage rates must be a part of the bid package

Page 52010 CDBG Recipients’ Workshop September 30, 2010

Request for Contractor Clearance

• Form can be mailed, e-mailed or faxed to Pam Truitt

• Ensures that contractor is not on Federal Debarred list

• Must be cleared before entering into a contract

Page 62010 CDBG Recipients’ Workshop September 30, 2010

Notice of Contract Action

• Must be submitted to DCA twice▪ First Time - When contract is awarded

• Verify that the appropriate Wage Decision was used

▪ Second Time - When construction begins• Field Reps will schedule formal labor review after form

has been submitted

• Construction drawdowns will be withheld if not submitted

Page 72010 CDBG Recipients’ Workshop September 30, 2010

Preconstruction Conference

• Mandatory, conducted by your grant administrator with the contractor

• Held prior to the start of construction

• Outlines contractor & subcontractor responsibilities, project timelines, logistics, etc.

• Explains Davis-Bacon, other applicable laws & contract provisions

• Notify your CDBG Field Rep of place and time

Page 82010 CDBG Recipients’ Workshop September 30, 2010

Wage Decision & Posters

• A copy of both must be posted on the Job Site

• Employees must be able to view

• Protect from the weather

Page 92010 CDBG Recipients’ Workshop September 30, 2010

Payrolls

• Contractors must submit all payrolls to grant recipient

• Must include the name, address and last 4 digits of SSN of each worker the first time they appear

• Every payroll must ▪ list the worker’s classification, which must match the

Wage Decision document▪ include the hourly rate of pay▪ be numbered, with the last payroll labeled “Final Payroll”▪ be certified by the owner, officer or designee of the

construction company

Page 102010 CDBG Recipients’ Workshop September 30, 2010

Job Site Interviews

• Have to be conducted on representative # of workers in each classification

• Interview responses should be checked against Wage Decision and payrolls

• CONDUCT INTERVIEWS EARLY AND OFTEN

Page 112010 CDBG Recipients’ Workshop September 30, 2010

Common Pitfalls

• Failure to obtain a wage determination prior to solicitation for bids

• Not obtaining Contractor Clearance before entering into a contract

• Payrolls not submitted on a weekly basis

• Payroll job classifications not matching wage decision classifications

Page 122010 CDBG Recipients’ Workshop September 30, 2010

Contact Information

Pam Truitt, Grants Consultant

Phone: (404) 679-5240

E-Mail: pam.truitt@dca.ga.gov