Canadian Light Source Commissioning Progress. CLS Annual Users Meeting – 2003-11-15. Facility Layout. Booster Commissioning. Blue: Dipole Field Yellow: PCT average current – 8 mA Green: FCTpeak current – 40 mA injected, 20 mA extracted. CLS Storage Ring. - PowerPoint PPT Presentation

Transcript of Canadian Light Source Commissioning Progress

Canadian Light SourceCommissioning Progress

CLS Annual Users Meeting – 2003-11-15

22003 November 15

Facility Layout

32003 November 15

Booster Commissioning

• Blue: Dipole Field• Yellow: PCT average current – 8 mA• Green: FCTpeak current – 40 mA injected, 20 mA

extracted

42003 November 15

CLS Storage Ring

• 2.9 GeV DBA lattice with 12-fold period• 170.88 m circumference• Nominal Tune:

x = 10.22

y = 3.26

• Eloss per turn: > 0.876 MeV• Bend magnet radiation:

c = 1.6 Å

Ec = 7.6 keV

x (natural damped) = 18.1 nm•rad

• Damping times: x = 2.4 ms, y = 3.8 ms, E = 2.7 ms

• ~10 mm bunch length

52003 November 15

Typical Storage Ring Sector

ELECTRON

BEAM

SY NCHROTRON LIGHT TO

EXPERIMENTAL STATIONS

PLAN VIEW(1 of 12 CELLS)

SCALE

1 meter0 0.5

62003 November 15

Split Sector Magnets

72003 November 15

Sector Vacuum Chamber

82003 November 15

Vacuum Bake-out

92003 November 15

Superconducting RF Cavity

102003 November 15

Storage Ring Injection & RF

112003 November 15

Storage Ring Sector

122003 November 15

Storage Ring

132003 November 15

Storage Ring Straight

142003 November 15

Commissioning Plan

• 4-week Runs: 2 installation + 2 run– Started 2003 September– Initial sequence:

• First turn• Stored beam• Stacked beam• Vacuum conditioning• Radiation survey for licensing

– Goal:• 100 mA • > 6 hour lifetime• Good reliability and stability

152003 November 15

Storage Ring Commissioning – Run 1

• Yellow: Storage Ring current at injection septum

Measured on 2003-09-26

162003 November 15

Storage Ring Commissioning – Run 2

• Green: Storage ring current

Measured 2003-10-25

172003 November 15

Storage Ring Commissioning – Run 3

• Green: Booster beam• Pink: SR1 beam loss measured by CBLM

Measured 2003-11-14

182003 November 15

Plan for 2004

• Q1:– SGM/PGM front-ends, POE and IDs– Optical chicanes for IR lines– Start of day-time operation

• Q2:– SM and PX front-ends, POEs and IDs– XAFS front-end and POE

• Q3:– XAFS wiggler– Tentative start of 24-hour operation

• Q4:– Increase current to 200 mA and lifetime to ~10 h

192003 November 15

Future Projects

• Modifications for top-up operation

• Fast transverse feedback

• Linac modifications/upgrade

• Come to Sunday session to discuss other long range possibilities