Can Pervious Concrete Work in Clay Soils?

Post on 12-Apr-2017

756 views 1 download

Transcript of Can Pervious Concrete Work in Clay Soils?

05/03/2023

Can Pervious Concrete Work in Clay Soils?

Protecting our water resources

© Copyright Estes Design Inc. 2013

forThe NPCPA San Diego

Conference

August 6, 2014

1

05/03/2023 © Copyright Estes Design Inc. 2013

• By the year 2030 it is estimated 47% of the world's population will face severe water shortages. Organization for Economic Co-operation and Development 2008

• 82% of the U.S. population reside in urban areas

• 50-75% of the U.S population rely on undeveloped forested watersheds to produce adequate water supplies. Forest Ecology and Management 258 (2009) 2269–2281

• The key hydrological function of forested watersheds is infiltration

• Impervious area in U.S. is projected to increase by over 36% by 2030 compared to 2000. JOURNAL OF HYDROLOGIC ENGINEERING © ASCE / APRIL 2009

• 6 of the 20 fastest developing metro areas in the U.S. are located in the Piedmont plateau. USDA, Natural Resource Inventory (NRI) database

• Dominant soils of the Piedmont are clay like. The Center for Environmental Informatics (CEI)

• The dominant soils series of the Piedmont is Cecil

INTRODUCTION - STATISTICS

2

05/03/2023 © Copyright Estes Design Inc. 2013

WATER SUPPLY

CN = 55 ??

3

DEVELOPMENT

CN = 92 ??

05/03/2023 © Copyright Estes Design Inc. 2013 4

05/03/2023 © Copyright Estes Design Inc. 2013

RUNOFF

5© Copyright Estes Design Inc. 2013

05/03/2023

Precipitation

1 yr – 2.79”

2 yr - 3.36”

10 yr – 4.89”

100 yr – 7.28”

CharlotteNOAA 24 hr ARI

© Copyright Estes Design Inc. 2013 6

Clay Soils

05/03/2023 © Copyright Estes Design Inc. 2013

Clay soils are widely misunderstood Clay soils are not equal. There are

different types of clay Infiltration rates and shrink-swell vary

greatly. Piedmont soils are typically well drained and low to moderate shrink swell potential

The majority of Piedmont soils are ideal for infiltration

7

05/03/2023

Mecklenburg County Soils, NC

Approximately 64% of Mecklenburg County is HSG B. Dominant series Cecil 59%95th percentile storm 1.8”

© Copyright Estes Design Inc. 2013 8

05/03/2023

Case StudiesEstes Design Inc.

Davidson, NC - Built 2007 monitored 3.5 years

Charlotte, NC - Built 2005 monitored 3 years

Both projects infiltrated 95% of their annual rain events

© Copyright Estes Design Inc. 2013 9

05/03/2023

Jetton Street Condominiums

Site

© Copyright Estes Design Inc. 2013 10

05/03/2023

Technology

Infiltration BMP’s - 2 1 bio-Infiltration &1 infiltration wetland Detains & infiltrates designed volume.

Bio-retention - 3 Captures & treats first 1” Replaces standard planting beds Can be used in areas of high clay

© Copyright Estes Design Inc. 2013 11

05/03/2023

Soils

© Copyright Estes Design Inc. 2013 12

05/03/2023

Preliminary Soils Survey

© Copyright Estes Design Inc. 2013 13

05/03/2023

Site Specific Infiltration Testing

RG-1

RG-5

© Copyright Estes Design Inc. 2013

Field infiltration rate helps determine probable outcome and initial design parameters

14

05/03/20231.10 in/hr 1.50 in/hr

Test Results

1.125”/hr

1.5”/hr

© Copyright Estes Design Inc. 2013 15

05/03/2023

Jetton Street Condominiums

7.4 acres

Reduced Detention

Infiltration Wetland

Bio-retention Gardens

Bio-retention Garden

Bio-Infiltration Garden

© Copyright Estes Design Inc. 2013 16

05/03/2023

Jetton Street Condominiums

Reduced Detention Basin

Bio-Retention Gardens

Bio-Retention Garden

Bio-Infiltration Garden

Infiltration Wetland

© Copyright Estes Design Inc. 2013 17

05/03/2023

LID ModelingJetton Street, Town of Davidson

Reduction of 10 yr peak storage volume by 45%

© Copyright Estes Design Inc. 201318

05/03/2023

Rain Garden 2

Redundant Treatment

Sub-drains to Bio-infiltration Garden 1

© Copyright Estes Design Inc. 2013 19

05/03/2023

Bio-infiltration Garden 1

Filter Fabric impedes infiltration??

© Copyright Estes Design Inc. 2013 20

05/03/2023

Bio-infiltration Garden 1

Soil conveyor reduces compaction and eases access.

© Copyright Estes Design Inc. 2013 21

05/03/2023

Bio-infiltration Garden 1

Rain Garden 1 is being monitored utilizing water level data loggers

© Copyright Estes Design Inc. 2013 22

05/03/2023

Bio-Infiltration Garden 1

February 2008 – April 2009

Avg. 0.26”/hr (0.66 cm/hr)

6.35”/day(16.13 cm/hr)

Rawls, Brakensiek and Saxton 1982 : Sandy Clay Loam = K of 0.43 cm/hr

© Copyright Estes Design Inc. 2013 23

05/03/2023

Infiltration Wetland 5

Designed to infiltrate the 2yr storm

© Copyright Estes Design Inc. 2013 24

05/03/2023

Rain Garden 5 is being monitored utilizing water level data loggers

Infiltration Wetland 5

© Copyright Estes Design Inc. 2013 25

05/03/2023

Infiltration Wetland 5

© Copyright Estes Design Inc. 2013 26

05/03/2023

Infiltration Wetland 5

Monitoring infiltration rates with water level data loggers

© Copyright Estes Design Inc. 2013 27

05/03/2023

Infiltration Pond 5

February 2008 – April 2009Avg. infiltration rate 0.14 “/hr(0.36 cm/hr)

3.2”/day(8.13 cm/day)

July Aug Sept OctJuneMayAprMarFeb Nov Dec Jan Feb Mar Apr

Rawls, Brakensiek and Saxton 1982 : Sandy Clay Loam = K of 0.43 cm/hr

© Copyright Estes Design Inc. 201328

05/03/2023

Wilmore Walk LID

Site

© Copyright Estes Design Inc. 2013 29

05/03/2023

Wilmore Walk

2.8 acre Multi-Family Urban Redevelopment

Over 90% of site runoff is treated

© Copyright Estes Design Inc. 2013 30

05/03/2023

Wilmore Walk

BMPs were retrofitted into an existing site design, including 6,355 sf of pervious concrete with 3,800 cf available storage in a gravel base

All water quality permit requirements were satisfied using “Bio-Retention” BMPs

© Copyright Estes Design Inc. 2013 31

05/03/2023

Plan

Bio-Retention

Porous Concrete

Bio-Retention

© Copyright Estes Design Inc. 2013 32

Bio-Retention Drain System

05/03/2023 © Copyright Estes Design Inc. 2013 33

Bio-Retention DrainSystem

05/03/2023 © Copyright Estes Design Inc. 2013 34

Finished Bio-retention as landscape areas

Rapid infiltration rate to start. Eventually stabilized in 6 mos.

05/03/2023 © Copyright Estes Design Inc. 2013 35

Bio-retention as landscape areas

Overflow weir

05/03/2023 © Copyright Estes Design Inc. 2013 36

05/03/2023 © Copyright Estes Design Inc. 2013 37

05/03/2023

Porous Concrete

© Copyright Estes Design Inc. 2013 38

05/03/2023

Wilmore Walk

Existing soils were investigated Green-Ampt equations for infiltration were

used for design of basin beneath the pervious concrete area

Bio-retention areas were located with grading plans adjusted accordingly.

© Copyright Estes Design Inc. 2013 39

05/03/2023

Preliminary Soils Survey

© Copyright Estes Design Inc. 2013 40

Site-Specific Infiltration Testing:0.24 – 3.15 in/hrAvg. 0.9 in/hr

Infiltration in Sandy Clay Loam

Field infiltration rate helps determine probable outcome and initial design parameters

05/03/2023 © Copyright Estes Design Inc. 2013 41

05/03/2023

Design

Stone Infiltration Reservoir sized for the 2yr storm for respective watershedWatershed includes surrounding rooflines and any off site contributions.Seasonal ground water fluctuations important

© Copyright Estes Design Inc. 2013 42

05/03/2023 © Copyright Estes Design Inc. 2013

Understanding soil components and structure required in predicting design outcome

43

Sub-grade Prep

Clay soils are highly susceptible to inadvertent compaction

05/03/2023 © Copyright Estes Design Inc. 2013 44

Stone Reservoir

05/03/2023 © Copyright Estes Design Inc. 2013 45

05/03/2023

Porous Concrete Installation May 10, 2005

© Copyright Estes Design Inc. 2013 46

05/03/2023

Porous Concrete Installation May 10, 2005

© Copyright Estes Design Inc. 2013 47

Porous ConcretePavement

05/03/2023 © Copyright Estes Design Inc. 2013 48

Finished Porous Concrete

05/03/2023 © Copyright Estes Design Inc. 2013 49

05/03/2023

Monitoring

Infinities USA Pressure Water Level Data Logger

© Copyright Estes Design Inc. 2013 50

05/03/2023

Monitoring DataAug-Sept 06

Average infiltration rate of 0.09 in/hr

(0.23 cm/hr)

13” in 6 daysin semi-dry conditions

Rawls, Brakensiek and Saxton 1982 : Sandy Clay Loam = K of 0.43 cm/hrRawls, Brakensiek and Saxton 1982 : Clay Loam = K of 0.23 cm/hr

© Copyright Estes Design Inc. 2013 51

05/03/2023

Testing

New Standard Test Method for Infiltration Rate of In PlacePervious Concrete being developed by ASTM committee C09/494 years later rates of 1040 – 1430 in/hr

© Copyright Estes Design Inc. 2013 52

05/03/2023

Preliminary Monitoring DataSaturated Soils Feb. 06

Preliminary data suggests average infiltration rate of 0.06 in/hr (0.15 cm/hr)(7.5” in 5.5 days) in saturated soil

Extended research completed by UNCC 2010.

Rawls, Brakensiek and Saxton 1982 : Silty Clay Loam = K of 0.15 cm/hr

© Copyright Estes Design Inc. 201353

UNCC 2 Year Monitoring StudyWilmore Walk

05/03/2023 © Copyright Estes Design Inc. 2013

• Monitored for 2 years

• Monitored water levels and precipitation

• Average infiltration rate 0.105”/hr, 2.52” /dy, 12.6” /5dy

• Concluded that rain events greater than the 10 year 24 hr events were retained and infiltrated.

• 10 yr event is 4.8” = 12.6” gravel depth

• 100 yr event is 6.96” = 18.3” gravel depth.

54

05/03/2023 © Copyright Estes Design Inc. 2013

Frankfort Kentucky

Building to be demolished

A cooperative effort between the City of Frankfort and KRMCA

55

05/03/2023 © Copyright Estes Design Inc. 2013 56

Frankfort Kentucky

05/03/2023 © Copyright Estes Design Inc. 2013 57

05/03/2023 © Copyright Estes Design Inc. 2013 58

Frankfort Kentucky

City of Frankfort Storm Water

05/03/2023

Working with UK and KRMCA on the Monitoring

© Copyright Estes Design Inc. 2013 59

CRMCA, Charlotte NC

05/03/2023 © Copyright Estes Design Inc. 2013 60

CRMCA, Charlotte NC

05/03/2023 © Copyright Estes Design Inc. 2013

Sandy clay loam

61

CRMCA, Charlotte NC

05/03/2023 © Copyright Estes Design Inc. 2013

• Over 6 month period 72 rain events.

• Rate of

infiltration into sub-grade 0.25”- 0.40 “ /hr

62

CRMCA, Charlotte NC

CRMCA1  3720 in/hr  First parking space (Older pour)

CRMCA2 5930 in/hr  Second parking space  (Older pour)

CRMCB1 way too slow for accuracy  (impervious strip)

CRMCC1 2600 in/hr  (First space new pour)

CRMCC2 3740 in/hr  (second space new pour)

MINIMUM OF 2600 IN/HR

05/03/2023 © Copyright Estes Design Inc. 2013

Pervious Concrete Pavement Testing

63

05/03/2023

END Thanks for listening!

© Copyright Estes Design Inc. 2013 64

Reversing History of Urban Hydrology

What Could Happen On A watershed Scale?

What if we modeled a watershed in the piedmont based on where an infiltration project is already established, monitored and validated over multiple years.

How could a real urban watershed be retrofitted?

How would this scenario effect watershed hydrology?

05/03/2023 © Copyright Estes Design Inc. 2013 65

THE WATERSHED EFFECT

GIS modeling study of watershed retrofit

05/03/2023 © Copyright Estes Design Inc. 2013

Capstone research project by Megan GrayDepartment of Geography & Earth Science

University of North Carolina Charlotte

66

PROJECT OBJECTIVES

Expanded Wilmore Walk research to explore watershed implication of PP on runoff using GIS and HydroCAD

How would PP affect runoff within a watershed?

Applied SCS CN TR-55 runoff model to predict effect of PP on watershed by using;1. ArcGIS© 2. HydroCAD©

05/03/2023 67© Copyright Estes Design Inc. 2013

METHODS - STORMWATER MODELINGSCS CN RUNOFF MODEL

Four CN Maps represent four scenarios: 1 – Present, real-time data. Impervious surfaces are

impervious 2 - Parking lots, driveways, and sidewalks are pervious 3 - Secondary roads are pervious 4 – Parking lots, driveways, sidewalks, and secondary

roads are pervious CN Values

Impervious = 98 Pervious = 61 (Used Equivalent CN of grass for B

Hydrogroup. Conservative)

Q = (P – 0.2S)2/(P + 0.8S)

05/03/2023 68© Copyright Estes Design Inc. 2013

Watershed Scale

Digital Elevation Model for seven precipitation maps (P maps) ranging from 1.25 to 100-year storm events

05/03/2023 © Copyright Estes Design Inc. 2013 69

Watershed Scale

Hyperspatial image of Irwin Watershed was used to create land use maps

05/03/2023 © Copyright Estes Design Inc. 2013

Existing ConditionsLand-use Cover

70

“S” Maps

05/03/2023 71© Copyright Estes Design Inc. 2013

Watershed Scale

Hyperspatial image & SSURGO soil survey map was used in combination to create the CN maps

Impervious = CN 98

Pervious = CN 61

05/03/2023 © Copyright Estes Design Inc. 2013

Existing Conditions

72

“CN” Maps

05/03/2023 73© Copyright Estes Design Inc. 2013

Watershed Scale CN Map for

Scenario 2, Driveways Sidewalks & Parking lots are pervious

75% of impervious area

05/03/2023 © Copyright Estes Design Inc. 2013 74

Watershed Scale

05/03/2023 © Copyright Estes Design Inc. 2013

Scenario 2 – Parking Lots, Driveways and Sidewalks account for 75% of area where permeable pavement might be installed and are typically privately owned.

-9.97

IECA Environmental Connection 2014

Runoff “Q” Maps

05/03/2023 76© Copyright Estes Design Inc. 2013

Watershed ScaleResults Scenario 2 - HydroCAD approximately 55%

reduction in peak flow for the 1.25 year 24 hr rain event

approximately 37% reduction in peak flow for the 100 year 24 hr event

approximately 30 minute delay in peak compared to scenario 1 & 3

infrastructure not modeled

05/03/2023 © Copyright Estes Design Inc. 2013 77

WATERSHED EFFECT CN = [1000/[10 + 5P + 10Qa– 10(Qa2+ 1.25QaP)1/2] where:

P = rainfall (in) Qa = Runoff Volume

Pervious Concrete with 6” stone base Stone base retains 2.4” = CN 45.5 Include real time Ir 0.10” /hr (2.4”) = CN 29.4 Pervious concrete pavement 6” retains 1.2” = CN 25

A watershed that is 75% CN 30 and 25% 98 = CN 47

05/03/2023 © Copyright Estes Design Inc. 2013 78

05/03/2023

END Thanks for listening!

© Copyright Estes Design Inc. 2013 79