Sheet1PROJECT: PADDHAR PARLE CONNECTIVITY SPURLINE PROJECT

CLIENT: GUJARAT STATE PETRONET LIMITEDSH-45 HDD DESIGN DOCUMENT AND PROFILE DRAWING, REV. 01DATE: 25.02.2015PMC: VALDEL ENGINEERS & CONSTRUCTORS PVT LTD.EPC: JAIHIND PROJECTS LIMITEDGSPL Project No : GSPL-520-AA

Sr. No.Document No.DescriptionPMC/GSPL CommentsTrenchless ReplyApproval Category1HDD DESIGN, REV. 00Page 1 of 7Pipe GradeNoted & CorrectedCode - B2Page 1 of 7ROC Calculation to be ProvidedOk, Noted & Updated3Page 7 of 7Procedure for HDD CrosssingAvailable at site4Page 7 of 7Inspection & Test Plan for HDDAvailable at site5Page 7 of 7Project OrganogramAvailable at site6Page 7 of 7Rig Side LayoutAvailable at site7Page 7 of 7Product Information (Bentanite) and PropertiesAvailable at site8Page 7 of 7Responsibility of Matrix for HDDAvailable at site9Page 7 of 7Pre-Hydrotesting Procedure Including the test plan, test hedar, schematic diagram & temperature pressure record logAvailable at site10Page 7 of 7All the applicable report format such as drilling log sheet, reaming log sheet, piping pull log sheetAvailable at site11Drawing no-TESPL/GSPL/VECL/HDD/SH-45/01 Rev-0Sheet 1 of 1Reference Pipeline Crossing drawing to be indicated.Noted & indicated.12Sheet 1 of 1PMC CommentsAll comments incorporated.

Sheet2

Sheet3