PROJECT: PADDHAR PARLE CONNECTIVITY SPURLINE PROJECT CLIENT: GUJARAT STATE PETRONET LIMITED SH-45 HDD DESIGN DOCUMENT AND PROFILE DRAWING, REV. 01 DATE: 25.02.2015 PMC: VALDEL ENGINEERS & CONSTRUCTORS PVT LTD. EPC: JAIHIND PROJECTS LIMITED Sr. No. Document No. Description PMC/GSPL Comments Trenchless Reply Approval Category 1 Page 1 of 7 Pipe Grade Noted & Corrected Code - B 2 Page 1 of 7 ROC Calculation to be Provided Ok, Noted & Updated 3 Page 7 of 7 Procedure for HDD Crosssing Available at site 4 Page 7 of 7 Inspection & Test Plan for HDD Available at site 5 Page 7 of 7 Project Organogram Available at site 6 Page 7 of 7 Rig Side Layout Available at site 7 Page 7 of 7 Product Information (Bentanite) and Properties Available at site 8 Page 7 of 7 Responsibility of Matrix for HDD Available at site 9 Page 7 of 7 Available at site 10 Page 7 of 7 Available at site 11 Sheet 1 of 1 erence Pipeline Crossing drawing to be indicat Noted & indicated. 12 Sheet 1 of 1 PMC Comments All comments incorporated. GSPL Project No : GSPL- 520-AA HDD DESIGN, REV. 00 Pre-Hydrotesting Procedure Including the test plan, test hedar, schematic diagram & temperature pressure record log All the applicable report format such as drilling log sheet, reaming log sheet, piping pull log sheet Drawing no- TESPL/GSPL/VECL/ HDD/SH-45/01 Rev-0

description

c bbbbbbbbbbbbb

Transcript of Cadddddfftgnnagnadnnddatj

Sheet1PROJECT: PADDHAR PARLE CONNECTIVITY SPURLINE PROJECT

CLIENT: GUJARAT STATE PETRONET LIMITEDSH-45 HDD DESIGN DOCUMENT AND PROFILE DRAWING, REV. 01DATE: 25.02.2015PMC: VALDEL ENGINEERS & CONSTRUCTORS PVT LTD.EPC: JAIHIND PROJECTS LIMITEDGSPL Project No : GSPL-520-AA

Sr. No.Document No.DescriptionPMC/GSPL CommentsTrenchless ReplyApproval Category1HDD DESIGN, REV. 00Page 1 of 7Pipe GradeNoted & CorrectedCode - B2Page 1 of 7ROC Calculation to be ProvidedOk, Noted & Updated3Page 7 of 7Procedure for HDD CrosssingAvailable at site4Page 7 of 7Inspection & Test Plan for HDDAvailable at site5Page 7 of 7Project OrganogramAvailable at site6Page 7 of 7Rig Side LayoutAvailable at site7Page 7 of 7Product Information (Bentanite) and PropertiesAvailable at site8Page 7 of 7Responsibility of Matrix for HDDAvailable at site9Page 7 of 7Pre-Hydrotesting Procedure Including the test plan, test hedar, schematic diagram & temperature pressure record logAvailable at site10Page 7 of 7All the applicable report format such as drilling log sheet, reaming log sheet, piping pull log sheetAvailable at site11Drawing no-TESPL/GSPL/VECL/HDD/SH-45/01 Rev-0Sheet 1 of 1Reference Pipeline Crossing drawing to be indicated.Noted & indicated.12Sheet 1 of 1PMC CommentsAll comments incorporated.

Sheet2

Sheet3