Broadbeach CBP Masterplan - City of Gold Coast...Proposed palm trees Proposed Norfolk pine...

Post on 03-Jul-2020

1 views 0 download

Transcript of Broadbeach CBP Masterplan - City of Gold Coast...Proposed palm trees Proposed Norfolk pine...

Broadbeach Core Business Precinct Master PlanOverall Streetscape Concept

Queensland Avenue

Albert Avenue

Victoria Avenue

Victoria Mall

TE Peters Drive

Charles Avenue

Surf Parade

Surf P

arade

Elizabeth Avenue

Gold C

oast Highw

ay

Old Burleigh R

oad

1

1

2

3

4

5

7

6

8

9

10

11

12

13

14

2

3

4

4

5

6

7

8

9

1112

13

14

10

QUEENSLAND AVENUE • Reconfigurationofon-streetparkingand

loading zone• Improved pedestrian crossings• Road narrowing and widening of footpath• Proposed signalised intersection and removal of

existing roundabout at surf parade intersection• Kerb extensions to create space for larger

shade trees and improve pedestrian amenity • Improve Garden areas• Proposedre-openingofleftturnontoGold

Coast Highway from Queensland Avenue

Key Project Overview

Introduction

OLD BURLEIGH ROAD• Improved pedestrian amenity and connectivity,

including new pedestrian crossings, wider footpaths and consistent planting of shade trees

• Kerb extensions in some areas to allow for larger shade trees

• Improve conditions and connections of existing bikelane

• Improve pedestrian connection between VictoriaMallandKurrawaPark

MAIN PLACE & GOLD COAST HIGHWAY • Proposedongroundpedestrianlinkacrossthe

Gold Coast Highway to improve the connection between the Convention centre and the business precinct

• Improve understorey planting and garden beds.• Extend footpath at Main Place improving

pedestrian amenity and creating outdoor dining areas

SURF PARADEThe proposed streetscape upgrade intends to reinforce Surf Parade as the main dining and event street within the core business precinct by: • Narrowing the road to reduce vehicle speed

and maximise footpath width, improving pedestrian activity/connectivity

• Flushkerbtoimproveeventsspace• Creating feature corner treatment on

intersections• Installing catenary suspended luminaires and

smartpoles lighting and infrastructure• Improving outdoor dining and shade structures• Resurfacing portions the footpath and on road

pavement • Adding new trees where possible

ALBERT AVENUE• Potentially transform Albert Avenue into a ‘one

way’streettoreducetrafficcongestiononSurfParade and Victoria Avenue

• Two proposed pedestrian crossings• Proposed additional shade trees• Reconfigurationofon-streetparkingand

loading zones• Footpath resurfacing and new street furniture

VICTORIA AVENUE• Road narrowing and wider footpaths• Proposed planted central median • Proposed additional trees for character and

shade• Improved outdoor dining VICTORIA AVENUE/ SURF PARADE INTERSECTION • Removal of roundabout and pedestrian

overpass and signalise intersection with pedestrian crossing

VICTORIA MALL• Improvements to existing pavement• Additional planting and removal of some garden

areas to improve views to the beach• Potential removal of water features • Proposed seating and activity areas• Proposed upgrade of existing playground and

additional sculptural play elements along the mall

• Opportuntiesforkiosk/takeawayoutletscentrally located within the Mall

Proposed pedestrian crossing and connection to betweentheMallandKurrawaPark.

EventsTerraceandKurrawaWalk(EDMP)

VICTORIA PARK• RelocationoftheTaxirnakfromOasistoa

securerankalongSurfParade• Relocation of northbound bus stop from Surf

Parade to Gold Coast Highway• Proposed shade trees bordering the turf event

space• Existing amenities to be retained• Newpedestrianlinks• Broadbeach entry statement sign located at

the corner of Gold Coast Highway and Victoria Avenue

CHARLES AVENUE• Proposedkerbextensionstocreatespace

for larger shade trees and improve pedestrian amenity.

• Proposed surface treatments on road and pedestrian crossings.

• Resurfacing of existing footpath • Improving under storey planting on central

median and gardens

GOLD COAST BULLETIN CENTENARY PARK • Area subject to further design consultation with

local businessELIZABETH AVENUE• Feature corner treatments• Proposed additional shade trees• Wider footpaths and turf reinstatement

Current Oasis Redevelopment

Neicon Towers

Victoria Square

Sofitel

Air

Oracle

Oasis Shopping Centre

Future Casino Expansion

Jupiters Casino

Broadbeach onthePark

QUBE BroadbeachDevelopment

Vi Residences

Convention Centre Main Place

Phoenician

Broadbeach North Station

Aria

Wave

Future Kurrawa SLSC

Kurrawa Park

Kurrawa all abilities playground

Disclaimer:This Master Plan is subject change due to further internal and externalstakeholdernegotiationsandconsultationoutcomes.Version2-27January2016

FederationPark

VictoriaPark

Proposed Albert Avenue Development

LegendExisting trees to be retained

Proposed street trees

Proposed smartpoles

Proposed feature trees

Outdoor dining

Proposed garden beds

Proposed palm trees

ProposedNorfolkpine

Pedestrian crossings

Proposed concrete footpath

Proposed surface treatment

The Broadbeach Core Business Precinct Master Plan has been developed in consultation with the area’sbusinessleaders,stakeholders,visitorsandlocalcommunitythroughcommunityengagement16-30October2015.TheMasterPlanaimstounlocktheprecinct’spotential and guide it’s transformation to become the city’s most vibrant and diverse beachside neighbourhood, event precinct and business centre. It will play an important part in our preparation for theGoldCoast2018CommonwealthGames.

0SCALE

30m2010

10