Post on 19-Apr-2018
Advice & next steps
What should you do to get all the benefits?
• Write RDS-PP® intoyour turbine supply contracts
• Force your developers to use it fromday zero of the wind farm planning
• Force your service people to use it for allequipment identification and work done
• Invest in local 2D data matrix labeling
• Use an O&M software,which supports RDS-PP®
• Engage in RDS-PP® user groupslike FTUG or VGB
… just require everybody involved in yourO&M to use it. It will work!
Help and info sources
Any questions? You will be supported by several specialists!
FGW TR7 Standardization for wind power plants O&MJens Rauch: rauch@wind-fgw.deAxel Ringhandt: axel.ringhandt@bachmann.info
VGB powertech RDS-PP Wind maintenance teamJörg Richnow: joerg.richnow@rwe.comDominic Klein: d.klein@enbw.com
IWES WinD-Pool data base for reliability based O&MBerthold Hahn: berthold.hahn@iwes.fraunhofer.deStefan Faulstich: stefan.faulstich@iwes.fraunhofer.de
REGAS: Software for digitally supported inspectionsBoris Schaffrin: schaffrin@recon-serv.comJürgen Fuhrländer: fuhrlaender@recon-serv.com
Böning & Komke RDS-PP-based project &documentation managememtNicole Böning: nicole.boening@boening-komke.comTorsten Komke: torsten.komke@boening-komke.com
Imagine:An easy-to-use,standardlanguage for allwind powerplants.Worldwide.Precise, logical,off-the-shelf.
Believe it or not:
It exists!
e_a_s_y
� Talk digitally to your OEM, service provider,inspectors, from your data base directlyinto a work instruction, in real-time
� Work on important analysis instead oftransferring handscribbled service reportsinto your O&M software
� Be sure that the guy in the turbine isindeed switching the right breaker
� Make cross-OEM analysis of whichsystem really causes the highest overalloutage cost and adjust your O&M strategy
� Share your (anonymized) data withother operators at Fraunhofer IWESWinD-Pool to get up-to-date benchmarkreports
� Import ready-off-the-shelf WTGstructures from FGW into your data base– no own efforts required
� Relate and find all your documentseasily, for any engineering discipline
� Sell your & buy other people’s windfarms and use their historical data andwind farm structure right away
� Up in the nacelle find cable andbreaker of the broken gear oil pumpwithout searching pages of documentation
� Ensure compliance with state-of-the-artstandards and be audit-safe
� Use known power plant 2nd generationsoftware to identify your sickcomponents before they tell you theywon’t work
With this language (= designation system) you could
All this alone should alreadymotivate you to implement it.
But there are evenmore benefits !!
RDS-PP main features
This „language“ is called RDS-PP,Reference Designation System for Power Plants,and has lot of excellent features:
• It’s based on the highest levelinternational standards(IEC 81346-2 and ISO 16952-10)
• You can use it from the design stagethrough the whole plant life cycle
• It has been developed over 40 years byspecialists from the power industry,it really fits
• There are excellent applicationguidelines available:VGB-823-32 and VGB-823-01
• The integration into the standard forwind energy communicationIEC 61400-25 is already ongoing
• A large number of EU offshore windfarms already uses this system
… You will be not alone in applying it!