Birds point new madrid floodway - camillo

Post on 14-Apr-2017

113 views 0 download

Transcript of Birds point new madrid floodway - camillo

Birds Point-New Madrid Floodway:The Story Behind the Decision

Charles CamilloHistorian/Executive Director

Mississippi River Commission

BUILDING STRONG®

MRL Confluence

Area

2

Set-Back Levee

UpperFuseplug

BUILDING STRONG®

Operating Birds Point-New Madrid Floodway

BUILDING STRONG®

30-Day Rainfall Totals (April 5-May 5, 2011)

4

BUILDING STRONG®

Plan of Operations-Based on Cairo Gage

Prepare Inflow & Load pipes (59’)

Inflow crevasse ready by 60’

Depart Memphis Harbor by 56’

Load barges at Memphis Harbor

Personnel and equipmenton “alert”

61

60

59

58

57

56

55

54

53

52

62

63

66

65

Setback Levee (65.5')

Cairo Floodwall and Commerce Birds Point Levee (65.3’)

Must Operate by 61’

April 21 49.0 -- 52.0

April 22 49.8 +0.8 52.0

April 23 51.0 +1.2 52.0

April 24 52.5 +1.5 58.5

April 25 54.5 +2.0 60.0

April 26 56.5 +2.0 61.0

April 27 57.9 +1.4 60.5

April 28 58.7 +0.8 60.5

April 29 59.0 +0.3 60.5

April 30 59.1 +0.1 60.5

Date Cairo Change Forecast Gage Crest

BUILDING STRONG®

Reservoir Status

6

BUILDING STRONG®

Plan of Operations-Based on Cairo Gage

Prepare Inflow & Load pipes (59’)

Inflow crevasse ready by 60’

Depart Memphis Harbor by 56’

Load barges at Memphis Harbor

Personnel and equipmenton “alert”

61

60

59

58

57

56

55

54

53

52

62

63

66

65Cairo Floodwall and Commerce Birds Point Levee (65.3’)

Must Operate by 61’

April 21 49.0 -- 52.0

April 22 49.8 +0.8 52.0

April 23 51.0 +1.2 52.0

April 24 52.5 +1.5 58.5

April 25 54.5 +2.0 60.0

April 26 56.5 +2.0 61.0

April 27 57.9 +1.4 60.5

April 28 58.7 +0.8 60.5

April 29 59.0 +0.3 60.5

April 30 59.1 +0.1 60.5

Date Cairo Change Forecast Gage Crest

BUILDING STRONG®

Plan of Operations-Based on Cairo Gage

H-21 Prepare Inflow & Load pipes (59’)

H-3 Inflow crevasse ready by 60’

61

60

59

58

57

56

55

54

53

52

62

63

66

65Cairo Floodwall and Commerce Birds Point Levee (65.3’)

H-0 Must Operate by 61’

May 1 0600 59.7 60.5

1030 Reichling asks to move to H-3

1500 59.9 61.8

1530 Walsh approves H-3

1400 60.0 61.8

1730 Ops halted

May 2

0400 60.7 63.5

1500 61.3 63.0

2200 61.7 63.0

Date Cairo Gage Forecast Crest

BUILDING STRONG®

322.5

324.5

326.5

328.5

330.5

332.5

334.5

52.0

54.0

56.0

58.0

60.0

62.0

64.0

4/15/11 4/20/11 4/25/11 4/30/11 5/5/11 5/10/11 5/15/11 5/20/11 5/25/11

ELEV

ATI

ON

(FT)

CA

IRO

GA

GE

(FT)

2011 Floodfight - Cairo AreaGage Zero = 270.5 ft.

Actual Ohio River Level Projected Before Floodway Activated

2011 ‐ 61.7 ft.

1937 ‐ 59.5 ft.

1997 ‐ 56.2 ft.

1973 ‐ 55.7 ft.

Project Design Flood

9

BUILDING STRONG®

1927 Flood (pre MR&T)vs

2011 Flood (with MR&T) 1927: 26,000 square miles flooded.

2011: 9,900 square miles flooded, per system design.

Over 16,000 square miles not flooded in 2011 because of system.

New stages and flood records set in 2011 over much of lower Mississippi River basin.

Operated 3 of 4 system floodways and 0 of 4 backwater areas in 2011.

Mississippi River & tributaries system passed 80-85% of the project design flood in 2011, while system is 89% complete.

BUILDING STRONG®

Federal levees; floodways and backwater areas; revetment;

dredging; river training dikes; reservoirs

MR&T Project

BUILDING STRONG®

BUILDING STRONG®

Project Design Flood

BUILDING STRONG®

Plan of Operations-Based on Cairo Gage

Arrive at Floodway; Load embedded pipes (forecast 60.5’ and rising)

Inflow crevasse ready for operation by 60

Depart Memphis Harbor (projected rise)

Load barges at Memphis Harbor

Personnel and equipment on “alert”

61

60

59

58

57

56

55

54

53

52

62

63

66

65

Comparative Heights of Flood Control Works

PDF with Floodway (62.5')Frontline Levee (62.5')

Setback Levee (65.5')Cairo Floodwall and Commerce Birds Point Levee (65.3’)

Fuseplugs on Frontline Levee (60.5’) Passive Activation

Must Operate by 61’

Trigger Points and Operation Times